ML031530472
From kanterella
Jump to navigation
Jump to search
ML031530472 | |
Person / Time | |
---|---|
Site: | Kewaunee |
Issue date: | 02/28/2003 |
From: | Owoc R, Stukus J Shaw Group, Stone & Webster Engineering Corp, Westinghouse |
To: | Office of Nuclear Reactor Regulation |
References | |
WCAP-16040-NP | |
Download: ML031530472 (154) | |
Similar Documents at Kewaunee | |
---|---|
Category:Topical Report
MONTHYEARML20182A6922020-06-29029 June 2020
[Table view]& ISFSI, Millstone Power Station, Units 1, 2 3, & ISFSI, North Anna Power Station, Units 1, 2 & ISFSI, Virgil C. Summer Station, Surry Power Station, Units 1 & 2 and ISFSI - Submission of Revision 28 of the Quality Assurance. ML19175A0712019-06-13013 June 2019 ISFSI, Millstone, Units 1, 2, 3, & ISFSI, North Anna, Units 1, 2 & ISFSI, Surry, Units 1 & 2 & ISFSI - Submittal of Revision 27 of the Quality Assurance Topical Report ML18065A1942018-02-28028 February 2018 Submittal of Approval Version of the Quality Assurance Topical Report, Revision 24-A ML16196A2922016-07-11011 July 2016 ISFSI, Millstone, Units 1, 2 & 3, and ISFSI, North Anna, Units 1 & 2, and ISFSI, Surry, Units 1 & 2, and ISFSI Submission of Rev. 21 of Quality Assurance Topical Report for NRC Approval and Submission of Revision 22 for Information Only ML14188B1342014-06-30030 June 2014 Nuclear Facility Quality Assurance Programs Description Topical Report DOM-QA-1, Rev. 16 ML13191A9132013-06-17017 June 2013 ISFSI, Millstone, Units 1, 2, & 3 & ISFSI, North Anna, Units 1 & 2 & ISFSI and Surry, Units 1 & 2 & ISFSI - Submission of Revision 14 of the Quality Assurance Topical Report ML11245A0772011-08-15015 August 2011 ISFSI, Millstone, Units 1, 2, & 3 and ISFSI, North Anna, Units 1, & 2 and ISFSI and Surry, Units 1 & 2 and ISFSI - Re-Submission of Quality Assurance Topical Report ML1118007302011-06-28028 June 2011 Connecticut, Inc., Virginia Electric and Power Company, Submission of Revision 11 of the Quality Assurance Topical Report ML1011101282009-06-30030 June 2009 Enclosure 5 - WCAP-16643-NP, Revision 2, Kewaunee Power Station Heatup and Cooldown Limit Curves for Normal Operation ML0816805082008-06-19019 June 2008 Stations - Request for Extension of Completion Dates for Generic Letter 2004-02 Corrective Actions ML0634101772006-12-0606 December 2006 Attachment a to Topical Report DOM-NAF-5, Application of Dominion Nuclear Core Design and Safety Analysis Methods to Kewaunee Power Station. ML0631904672006-11-0606 November 2006 Transmittal of Approved Topical Report DOM-NAF-3 NP-A, Gothic Methodology for Analyzing the Response to Postulated Pipe Ruptures Inside Containment. ML0530602732005-11-0101 November 2005 Request for Approval of Topical Report DOM-NAF-3, Gothic Methodology for Analyzing the Response to Postulated Pipe Ruptures Inside Containment. Topical Report Page 40 Through End ML0530602662005-11-0101 November 2005 Request for Approval of Topical Report DOM-NAF-3, Gothic Methodology for Analyzing the Response to Postulated Pipe Ruptures Inside Containment. Cover Letter Through Topical Report Page 40 ML0430001552004-10-20020 October 2004 Westinghouse Owners Group - Comparison of Crossflow and ASME Flow Section Feedwater Flow Measurement at Kewaunee Nuclear Power Plant L-HU-04-039, Nuclear Management Company, Llc., Response to Request for Additional Information Request for Approval of Nuclear Management Company Quality Assurance Topical Report, Dated August 18, 20042004-09-22022 September 2004 Nuclear Management Company, Llc., Response to Request for Additional Information Request for Approval of Nuclear Management Company Quality Assurance Topical Report, Dated August 18, 2004 ML0332302252003-11-12012 November 2003 Submittal of WCAP-16084-NP, Development of Risk-Informed Safety Analysis Approach and Pilot Application. ML0330701622003-10-31031 October 2003 Table Comparing ANSI N18.7-1976 to ASME Nqa -1-1994 & NMC QATR ML0330701642003-10-31031 October 2003 NQA-1 Vs Non-Programmatic ANSI Standards Comparison Tables ML0307801742003-03-0606 March 2003 Correction to LAR 193 Attachment 8, WCAP 15592, Rev 1 ML0315304722003-02-28028 February 2003 Topical Report WCAP-16040-NP, Power Uprate Project, Kewaunee Nuclear Power Plant, NSSS & BOP Licensing Report, Sections 8.1 Through 9.2.4.2.5 ML0315304152003-02-28028 February 2003 Topical Report WCAP-16040-NP, Power Uprate Project, Kewaunee Nuclear Power Plant, NSSS & BOP Licensing Report, Tables 6.4 Through 6.6.7 ML0315304082003-02-28028 February 2003 Topical Report WCAP-16040-NP, Power Uprate Project, Kewaunee Nuclear Power Plant, NSSS & BOP Licensing Report, Table 5.3 Through Figure 6.3-1 ML0315304052003-02-28028 February 2003 Topical Report WCAP-16040-NP, Power Uprate Project, Kewaunee Nuclear Power Plant, NSSS & BOP Licensing Report, Table of Contents Through Table 5.2-1 ML0315304242003-02-28028 February 2003 Topical Report WCAP-16040-NP, Power Uprate Project, Kewaunee Nuclear Power Plant, NSSS & BOP Licensing Report, Tables 6.7 Through 8.0 ML0222006302002-07-26026 July 2002 License Amendment Request 187, Conforming Technical Specification Changes for Use of Westinghouse Vantage+ Fuel. Attachment 7 Which Includes WCAP-15592 (Non-Proprietary) 2020-06-29 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML031530472&oldid=2657159"