Units 1 & 2, Tech Spec Pages for Amendments 132, 132, 127 & 127 Adding New Surveillance Requirement to Tech Spec Section 3.7.5
ML031490207
Person / Time
Site: Byron, Braidwood  
(NPF-037, NPF-066, NPF-072, NPF-077)
Issue date: 05/22/2003
From:
NRC/NRR/DLPM/LPD3
To:
Chawla M, NRR/DLPM, 415-8371
References
TAC MB7152, TAC MB7153, TAC MB7154, TAC MB7155
Download: ML031490207 (4)


Text

AF System 3.7.5 SURVEILLANCE REQUIREMENTS SURVEI LLANCE FREQUENCY SR 3.7.5.1 Verify each AF manual, power operated, and 31 days automatic valve in each water flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.

SR 3.7.5.2 Verify day tank contains 420 gal of fuel 31 days oil.

SR 3.7.5.3 Operate the diesel driven AF pump for 31 days

> 15 minutes.

SR 3.7.5.4 Verify the developed head of each AF pump In accordance at the flow test point is greater than or with the equal to the required developed head.

Inservice Testing Program SR 3.7.5.5 Verify each AF automatic valve that is not 18 months locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.

SR 3.7.5.6 Verify each AF pump starts automatically on 18 months an actual or simulated actuation signal.

SR 3.7.5.7 Verify proper alignment of the required AF Prior to flow paths by verifying flow from the entering MODE 2 condensate storage tank to each steam whenever unit generator.

has been in MODE 5, MODE 6, or defueled for a cumulative period of

> 30 days (continued)

  • 1-BYRON -

UNITS 1 & 2 3.7.5 - 2 Amendment 132

AF System 3.7.5 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.7.5.8 Verify fuel oil properties are tested in In accordance accordance with, and maintained within the with the Diesel limits of, the Diesel Fuel Oil Testing Fuel Oil Program.

Testing Program BYRON -

UNITS 1 & 2 I

3.7.5 - 3 Amendment 132

AF System 3.7.5 SURVEILLANCE REQUIREMENTS SURVEI LLANCE FREQUENCY SR 3.7.5.1 Verify each AF manual, power operated, and 31 days automatic valve in each water flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.

SR 3.7.5.2 Verify day tank contains 420 gal of fuel 31 days oil.

SR 3.7.5.3 Operate the diesel driven AF pump for 31 days

> 15 minutes.

SR 3.7.5.4 Verify the developed head of each AF pump In accordance at the flow test point is greater than or with the equal to the required developed head.

Inservice Testing Program SR 3.7.5.5 Verify each AF automatic valve that is not 18 months locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.

SR 3.7.5.6 Verify each AF pump starts automatically on 18 months an actual or simulated actuation signal.

SR 3.7.5.7 Verify proper alignment of the required AF Prior to flow paths by verifying flow from the entering MODE 2 condensate storage tank to each steam whenever unit generator.

has been in MODE 5, MODE 6, or defueled for a cumulative period of

> 30 days (continued)

BRAIDWOOD -

UNITS 1 & 2 I

I I

I I

3.7.5 - 2 Amendment 127

AF System 3.7.5 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.7.5.8 Verify fuel oil properties are tested in In accordance accordance with, and maintained within the with the Diesel limits of, the Diesel Fuel Oil Testing Fuel Oil Program.

Testing Program BRAIDWOOD -

UNITS 1 & 2 I

3.7.5 - 3 Amendment 127