Richard L. Anderson Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3883 Fax 570.542.1504 RLAnderson@pplweb.com I
I pp*
- u r n -
I, P. 4% :I TM May 15, 2003 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station OP1-17 Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA-005626 R41-2A The April 2003 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.
Very truly yours, Richard L. Anderson JJHI/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. S. Hansell NRC Project Manager, Mr. R V. Guzman
/'
o.
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 05/15/2003 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 1. Unit Name:
Susquehanna Steam Electric Station (U 1)
- 2.
Reporting Period:
April 2003
- 3.
Design Electrical Rating (Net MWe):
1115
- 4.
Maximum Dependable Capacity (Net MWe):
1105
- 5.
Hours in Reporting Period
- 6.
Number of Hours Reactor Was Critical
- 7.
Hours Generator On-Line
- 8.
Unit Reserve Shutdown Hours
- 9.
Net Electrical Energy Generated (MWH)
This Month 719 719 719 0
800,613 NOTES:
Page 1 of 1 Yr.-to-Date 2879 2879 2879 0
3,185,797 Cumulative 74,408 144,743.5 142,532.8 0
146,439,326
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 05/15/03 J. J. Hennings (570) 542-3747 REPORT MONTH April 2003 No.
Date Type Duration Reason Method of Cause & Corrective Action I
(Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 No Shutdowns this month.
ISummary: No significant power reductions were performed during April.
2.
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain) 3.
Method:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other 1.
F. Forced S. Scheduled Page 1 of 1
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-387 Date:
5115/03 Completed by: J. J. Hennings Telephone:
(570) 542-3747 Challenzes to Main Steam Safety Relief Valves None.
1S.
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 05/15/03 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 1. Unit Name:
Susquehanna Steam El
- 2.
Reporting Period:
April 2003
- 3.
Design Electrical Rating (Net MWe):
- 4.
Maximum Dependable Capacity (Net MWe):
lctric Station (U2) 1117*
1111*
- 5.
Hours in Reporting Period
- 6.
Number of Hours Reactor Was Critical
- 7.
Hours Generator On-Line
- 8.
Unit Reserve Shutdown Hours
- 9.
Net Electrical Energy Generated (MWH)
This Month 719 280.8 236.92 0
224,793 Yr.-to-Date 2,879 1,865.4 1820.9 0
1,897,817 Cumulative 159,648 138,014.8 136,027.6 0
142,008,811 NOTES:
During the U2 1 1 Refueling Outage, the Main Turbine was replaced with a newly designed HP and three LP turbines. The Design Rating and Maximum Dependable Capacity Rating will change following the completion of the official Performance/Acceptance Test in early June.
Page 1 of 1
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 05/15/03 J. J. Hennings (570) 542-3747 REPORT MONTH Anril 2003 Summary: The reactor mode switch was placed in startup on 4/19103. The Unit 2 Cycle 11 Refueling Outage ended on 1 4/21/03 and reactor power reached 100% on 4/24/03. No other significant power changes occurred in April.
2.
3.
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Method:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other No.
Date Type Duration Reason Method of Cause & Corrective Action I
(Hours) 2 Shutting to Prevent Recurrence Down Reactor 3
1 3/8/03 S
1058 C
4 Continued planned Refueling ouitage that began on 3/8/03.
1.
F. Forced S. Scheduled Page of I
SUSOUEHANNA STEAM ELECTRIC STATION Docket Number:
50-388 Date- -.05/15103 Completed by:
J. J. Hennings Telephone:
(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.