Text
w-Nuclear Operating Company I Sodh TEx 0pudr1rflibComp77 y £m0 &
n2J i
M a rz 2743 May 16,2003 NOC-AE-03001531 File No.: G02 10CFR50.71 STI: 31606930 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operating Reports for April 2003 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for April 2003. If you should have any questions on this matter, please contact R.L. Hill at (361) 972-7667.
F.H. Mallen Manager, Financial Controls Attachments: 1)
STPEGS Unit 1 Monthly Operating Report - April 2003
- 2)
STPEGS Unit 2 Monthly Operating Report - April 2003 12wA
cc:
(paper copy)
(electronic copy)
Ellis W. Merschoff Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 Richard A. Ratliff Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Cornelius F. O'Keefe U. S. Nuclear Regulatory Commission P. O. Box 289, Mail Code: MN116 Wadsworth, TX 77483 A. H. Gutterman, Esquire Morgan, Lewis & Bockius LLP M. T. Hardt[W. C. Gunst City Public Service Mohan C. Thadani U. S. Nuclear Regulatory Commission R. L. Balcom/D. G. Tees Texas Genco, LP A. Ramirez City of Austin C. A. Johnson/A. C. Bakken III AEP - Central Power and Light Company Jon C. Wood Matthews & Branscomb C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704
Approved By:
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 MONTHLY OPERATING REPORT APRIL 2003 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-498 LICENSE NO. NPF-76 E.D. H(APIN Date
MONTHLY
SUMMARY
South Texas Project Unit 1 began the reporting period shutdown for refueling.
On April 12, during a scheduled boric acid inspection of the reactor coolant and associated systems, small deposits of boric acid were discovered on two (2) of the fifly-eight (58) bottom mounted instrumentation penetrations on the reactor pressure vessel. The investigation results indicate primary reactor coolant as the likely source of the residue.
The unit remained out of service following refueling to continue the investigation to determine the root cause, identify non-destructive examination methods and evaluate repair options.
OPERATING DATA REPORT DOCKET NO.
50-498 UNIT 1
DATE May 12, 2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS
- 1.
REPORTING PERIOD: 411/03-4130103 GROSS HOURS IN REPORTING PERIOD:
719
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3.853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1,2506 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6
- 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
- 4.
REASONS FOR RESTRICTION (IF ANY): N/A
- 5.
NUMBER OF HOURS REACTOR CRITICAL
- 6.
REACTOR RESERVE SHUTDOWN HOURS
- 7.
HOURS GENERATOR ON LINE
- 8.
UNIT RESERVE SHUTDOWN HOURS
- 9.
GROSS THERMAL ENERGY GENERATED (MWH)
- 10.
NET ELECTRICAL ENERGY GENERATED (MWH)
- 11.
REACTOR SERVICE FACTOR (%)
- 12.
REACTOR AVAILABILITY FACTOR (%)
- 13.
UNIT SERVICE FACTOR (%)
- 14.
UNIT AVAILABILITY FACTOR (%)
- 15.
UNIT CAPACITY FACTOR - Using MDC (%)
- 16.
UNIT CAPACITY FACTOR - Using DER (%)
- 17.
UNIT FORCED OUTAGE RATE (%)
THIS MONTH 0.0 0
0.0 0
0 0
0.0 0.0 0.0 0.0 0.0 0.0 100.0 YR TO DATE 1,971.0 0
0 1~~,96.
7,348,061 2,463,746 68.5 68.5 68.2 68.2 68.4 68.4 13.0 CUMULATIVE 100,500.1 0
98.856.9 0
369,298.524 120,679,801 78.1 78.1 76.8 76.8 75.0 75.0 13.4
- 18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A
- 19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 8/6/03
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-498 UNIT I
DATE May 12,2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH APRIL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 0
2 0
3 0
4 0
5 0
6 0
7 0
8 0
9 0
10 0
11 0
12 0
13 0
14 0
15 0
16 0
DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 AVERAGE DAILY POWER LEVEL (MWe-Net) 0 0
0 0
0 0
0 0
0 0
0 0
0 0
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-498 1
May 12. 2003 R.L. Hill 361.972.7667 REPORT MONTH APRIL 1
F: Forced S: Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Cont. of Existing Outage 5-Reduction 9-Other 4
~~~~2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours)
Shutting Event Code Code Down Report#
Reactor 03-03 032603 S
478.0 C
1 N/A N/A N/A Refueling and scheduled maintenance outage.
03-04 04/20/03 F
241.0 F
9 01-03-003 RC PEN Investigate and repair bottom mounted instrumentation I I penetration indications.
PORVS AND SAFETY VALVE
SUMMARY
There were no PORV or Safety Valves challenged during the reporting period.
Approved By:
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT APRIL 2003 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-499 LICENSE NO. NPF-80 E.D. HALtIN Date
MONTHLY
SUMMARY
South Texas Project Unit 2 operated during the reporting period at full power with no unit shutdowns or significant power reductions.
OPERATING DATA REPORT DOCKETNO.
UNIT DATE COMPLETED BY TELEPHONE 50-499 2
May 12, 2003 R.L. Hill 361.972.7667 OPERATING STATUS
- 1.
REPORTING PERIOD: 4/1103-4/30/03 GROSS HOURS IN REPORTING PERIOD:
719
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3,853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1,250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1.250.
- 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
- 4.
REASONS FOR RESTRICTION (IF ANY): N/A
- 5.
NUMBER OF HOURS REACTOR CRITICAL
- 6.
REACTOR RESERVE SHUTDOWN HOURS
- 7.
HOURS GENERATOR ON LINE
- 8.
UNIT RESERVE SHUTDOWN HOURS
- 9.
GROSS THERMAL ENERGY GENERATED (MWH)
- 10.
NET ELECTRICAL ENERGY GENERATED (MWH)
- 11.
REACTOR SERVICE FACTOR (%)
- 12.
REACTOR AVAILABILITY FACTOR (%)
- 13.
UNIT SERVICE FACTOR (%)
- 14.
UNIT AVAILABILITY FACTOR (o)
- 15.
UNIT CAPACITY FACTOR - Using MDC (%)
- 16.
UNIT CAPACITY FACTOR - Using DER (%)
- 17.
UNIT FORCED OUTAGE RATE (%)
THIS MONTH 719.0 0
719.0 0
2,744.392 916,279 100.0 100.0 100.0 100.0 101.9 101.9 0.0 YR TO DATE 1.265.7 0
1.232.1 0
4.518,381 1.495.644 44.0 44.0 42.8 42.8 41.5 41.5 57.2 CUMULATIVE 95,823.4 0
92,524.5 348,932,032 113,673,611 78.8 78.8 77.0 77.0 74.8 74.8 14.7
- 18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A
- 19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
AVERAGE DAILY UNIT POWER LEVEL DOCKETNO.
50-499 UNIT 2
DATE May 12,2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH APRIL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 1258 2
1273 3
1274 4
1274 5
1274 6
1273 7
1270 8
1272 9
1272 10 1273 11 1272 12 1273 13 1273 14 1273 15 16 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 1276 18 1275 19 1272 20 1273 21 1273 22 1273 23 1271 24 1272 25 1272 26 1273 27 1272 28 1274 29 1275 30 1274 1273 1276
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-499 UNIT 2
DATE May 12. 2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH APRIL 1
2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours)
Shutting Event Code Code Down Report #
Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD
___l l
l l
l l
l I
1 F: Forced S: Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Cont. of Existing Outage 5-Reduction 9-Other 4
PORVS AND SAFETY VALVE
SUMMARY
There were no PORV or Safety Valves challenged during the reporting period.