ML031410683

From kanterella
Jump to navigation Jump to search
NRC Examination Report - 50-424/2003-301 and 50-425/2003-301
ML031410683
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/20/2003
From: Ernstes M
Operator Licensing and Human Performance Branch
To: Gasser J
Southern Nuclear Operating Co
References
50-424/03-301, 50-425/03-301
Download: ML031410683 (8)


See also: IR 05000424/2003301

Text

May 20, 2003

Southern Nuclear Operating Company, Inc.

ATTN: Mr. J. T. Gasser, Vice President

P. O. Box 1295

Birmingham, AL 35201-1295

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT NRC EXAMINATION REPORT -

50-424/2003-301 AND 50-425/2003-301

Dear Mr. Gasser:

On May 8, 2003, the Nuclear Regulatory Commission (NRC) administered an operating retake

examination to one employee of your company who had reapplied for a license to operate the

Vogtle Electric Generating Plant. The Senior Reactor Operator applicant was required to

retake the Integrated Plant Operations portion (Simulator Operating Test) of the operating

examination. The applicant passed his retake examination.

No findings of significance were identified.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document Room

or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

/RA/

Michael E. Ernstes, Chief

Operator Licensing and

Human Performance Branch

Division of Reactor Safety

Docket Nos. 50-424, 50-425

License Nos. NPF-68, NPF-81

Enclosure: (See page 2)

SNC

2

Enclosure: Report Details

cc w/encl:

J. D. Woodard

Executive Vice President

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

G. R. Frederick

General Manager, Plant Vogtle

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

N. J. Stringfellow

Manager-Licensing

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Director, Consumers Utility Counsel

Division

Governors Office of Consumer Affairs

2 M. L. King, Jr. Drive

Plaza Level East; Suite 356

Atlanta, GA 30334-4600

Office of Planning and Budget

Room 615B

270 Washington Street, SW

Atlanta, GA 30334

Office of the County Commissioner

Burke County Commission

Waynesboro, GA 30830

Director, Department of Natural Resources

205 Butler Street, SE, Suite 1252

Atlanta, GA 30334

Manager, Radioactive Materials Program

Department of Natural Resources

Electronic Mail Distribution

Attorney General

Law Department

132 Judicial Building

Atlanta, GA 30334

Resident Manager

Oglethorpe Power Corporation

Alvin W. Vogtle Nuclear Plant

Electronic Mail Distribution

Charles A. Patrizia, Esq.

Paul, Hastings, Janofsky & Walker

10th Floor

1299 Pennsylvania Avenue

Washington, D. C. 20004-9500

Arthur H. Domby, Esq.

Troutman Sanders

NationsBank Plaza

600 Peachtree Street, NE, Suite 5200

Atlanta, GA 30308-2216

Senior Engineer - Power Supply

Municipal Electric Authority

of Georgia

Electronic Mail Distribution

Reece McAlister

Executive Secretary

Georgia Public Service Commission

244 Washington Street, SW

Atlanta, GA 30334

Ken Holmes, Plant Training &

Emergency Preparedness Manager

Vogtle Electric Generating Plant

P. O. Box 1600

Waynesboro, GA 30830

SNC

3

Distribution w/encl:

F. Rinaldi, NRR

C. Evans (Part 72 Only)

L. Slack, RII EICS

RIDSNRRDIPMLIPB

PUBLIC

OFFICE

RII:DRS

RII:DRS

RII:DRP

SIGNATURE

/RA/

/RA/

/RA/

NAME

GHopper:pmd

MErnstes

BBonser

DATE

5/16/2003

5/20/2003

5/20/2003

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO

PUBLIC DOCUMENT

YES

NO

OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML031410683.wpd

Enclosure

NUCLEAR REGULATORY COMMISSION

REGION II

Docket Nos.:

50-424, 50-425

License Nos.:

NPF-68, NPF-81

Report Nos.:

50-424/03-301, 50-425/03-301

Licensee:

Southern Nuclear Operating Company, Inc. (SNC)

Facility:

Vogtle Electric Generating Plant Units 1 and 2

Location:

7821 River Road

Waynesboro, GA 30830

Date:

Operating Tests - May 8, 2003

Examiner:

G. Hopper, Chief Examiner

Approved by:

M. Ernstes, Chief

Operator Licensing and Human Performance Branch

Division of Reactor Safety

SUMMARY OF FINDINGS

ER 05000424/2003-301, ER 05000425/2003-301, on 5/8/2003; Southern Nuclear Operating

Company, Inc., Vogtle Electric Generating Plant, Units 1 and 2, Licensed Operator

Examinations.

The NRC examiner conducted an operator licensing initial retake examination in accordance

with the guidance of NUREG-1021, Revision 8, Supplement 1, Operator Licensing Examiner

Standards for Power Reactors. This examination implemented the operator licensing

requirements of 10 CFR §55.45.

The NRC administered the simulator operating test on May 8, 2003. The operator licensing

initial operating retake examination was developed by the NRC. One senior reactor operator

(SRO) applicant passed this retake of his operating examination and was issued a license.

No significant issues were identified.

Report Details

4.

OTHER ACTIVITIES (OA)

4OA5 Operator Licensing Initial Examinations

a.

Inspection Scope

The NRC developed the operating examinations in compliance with the guidelines

specified in NUREG-1021, Revision 8, Supplement 1.

The examiner reviewed the licensees examination security measures while preparing

and administering the examinations to ensure that examination security and integrity

complied with 10 CFR 55.49, Integrity of examinations and tests.

The examiner evaluated one SRO applicant who was being assessed under the

guidelines specified in NUREG-1021. The examiner administered the retake of the

simulator operating test on May 8, 2003. The evaluation of the applicant and a review of

documentation was performed to determine if the applicant met the requirements

specified in 10 CFR Part 55.

b.

Findings

No findings of significance were identified.

The applicant passed his retake examination.

4OA6 Meetings

Exit Meeting Summary

On May 8, 2003, the examiner discussed the examination and preliminary findings with

Mr. Lee Mansfield, Operations Training Manager, and other members of his staff. The

examiner confirmed that proprietary information was not provided or examined during

the inspection.

PARTIAL LIST OF PERSONS CONTACTED

Licensee

L. Mansfield, Operations Training Manager

C. Salter, Operations Instructor

D. Scukanec, Senior Operations Instructor

A. Sweat, Operations Instructor

NRC

J. Zeiler, Senior Resident Inspector