Ltr. Davis-Besse Rescheduled Radiation Protection Inspection for Week of 7/14/03
ML031360545
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/14/2003
From: House J, Kenneth Riemer
Plant Support Branch II
To: Myers L
FirstEnergy Nuclear Operating Co
References
Download: ML031360545 (5)


Text

May 14, 2003 Mr. Lew W. Myers Chief Operating Officer FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760

Dear Mr. Myers:

We have rescheduled a radiation protection inspection at your Davis-Besse Nuclear Power Station. This change was communicated during telephone conversations between Mr. B.

Geddes of your staff and Dr. J. House on April 28, 2003, and between Mr. R. Ferrell of your staff and Dr. J. House on May 13, 2003. This inspection will focus on, and assess the effectiveness of, management oversight of the Radiation Protection program including ALARA planning and controls, and the control of radioactive material. Additionally, we will review radioactive material processing and transportation. This inspection has been rescheduled for the week of July 14, 2003. We have postponed this inspection in order for your new radiation protection management team to implement its leadership role. If you have any questions concerning this information, please contact J. House of my staff at (630) 829-9824.

In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA by JHouse Acting For/

Kenneth R. Riemer, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 See Attached Distribution

L. Myers cc:

The Honorable Dennis Kucinich B. Saunders, President - FENOC Plant Manager Manager - Regulatory Affairs M. OReilly, FirstEnergy Ohio State Liaison Officer R. Owen, Ohio Department of Health Public Utilities Commission of Ohio President, Board of County Commissioners Of Lucas County Steve Arndt, President, Ottawa County Board of Commissioners D. Lochbaum, Union Of Concerned Scientists

May 14, 2003 Mr. Lew W. Myers Chief Operating Officer FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760

Dear Mr. Myers:

We have rescheduled a radiation protection inspection at your Davis-Besse Nuclear Power Station. This change was communicated during telephone conversations between Mr. B.

Geddes of your staff and Dr. J. House on April 28, 2003, and between Mr. R. Ferrell of your staff and Dr. J. House on May 13, 2003. This inspection will focus on, and assess the effectiveness of, management oversight of the Radiation Protection program including ALARA planning and controls, and the control of radioactive material. Additionally, we will review radioactive material processing and transportation. This inspection has been rescheduled for the week of July 14, 2003. We have postponed this inspection in order for your new radiation protection management team to implement its leadership role. If you have any questions concerning this information, please contact J. House of my staff at (630) 829-9824.

In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA by JHouse Acting For/

Kenneth R. Riemer, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 See Attached Distribution DOCUMENT NAME: G:DRS\\ML031360545.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII NAME JHouse:sd CLipa JHouse for KRiemer DATE 05/14/03 05/14/03 05/14/03 OFFICIAL RECORD COPY

L. Myers cc:

The Honorable Dennis Kucinich B. Saunders, President - FENOC Plant Manager Manager - Regulatory Affairs M. OReilly, FirstEnergy Ohio State Liaison Officer R. Owen, Ohio Department of Health Public Utilities Commission of Ohio President, Board of County Commissioners Of Lucas County Steve Arndt, President, Ottawa County Board of Commissioners D. Lochbaum, Union Of Concerned Scientists ADAMS Distribution: