ML031330441

From kanterella
Jump to navigation Jump to search
Open Notice of Meeting with Nuclear Management Company, Llc., to Obtain Licensee'S Perspective on Significance of Preliminary Red Inspection Finding
ML031330441
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/13/2003
From: Anton Vegel
Division Reactor Projects III
To: Cayia A
Nuclear Management Co
References
EA-03-057, IR-02-015
Download: ML031330441 (4)


Text

May 13, 2003 EA-03-057 Mr. Alfred J. Cayia Site Vice-President Point Beach Nuclear Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241-9516

SUBJECT:

REGULATORY CONFERENCE TO DISCUSS PRELIMINARY RED INSPECTION FINDING AT THE POINT BEACH NUCLEAR PLANT (INSPECTION REPORT 50-266/02-15(DRP); 50-301/02-15(DRP))

Dear Mr. Cayia:

This letter confirms the discussion between Mr. Michael Kunowski of this office and Mr. Edward Weinkam of the Nuclear Management Company to have a Regulatory Conference at 9:00 a.m. (CDT) on June 6, 2003, at the U.S. Nuclear Regulatory Commission Region III office at 801 Warrenville Road in Lisle, Illinois. The Conference is open to the public and there will be an opportunity for the public to speak with NRC representatives before the meeting is adjourned.

The purpose of the Regulatory Conference is for you to provide your perspective on the significance of the preliminary Red inspection finding related to the potential for a common mode failure of the auxiliary feedwater pumps from the plugging by debris of orifices in the pump recirculation lines. In addition to your perspective, please provide any revised or new information associated with your risk analysis, any other information related to the finding, and whether you agree with the apparent violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, that was identified during the inspection. We encourage you to submit your evaluation and any differences with the NRC evaluations at least one week prior to the conference in an effort to make the conference more efficient and effective. The preliminary Red inspection finding and the apparent violation are discussed in Inspection Report 50-266/02-15(DRP); 50-301/02-15(DRP), issued on April 2, 2003.

A. Cayia If you have any questions regarding this meeting, please contact me at (630) 829-9620.

Sincerely,

/RA/

Anton Vegel, Chief Branch 7 Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 cc: R. Grigg, President and Chief Operating Officer, WEPCo John Paul Cowan, Chief Nuclear Officer Licensing Manager D. Weaver, Nuclear Asset Manager Joseph Jensen, Plant Manager Gordon P. Arent, Manager, Regulatory Affairs Jonathan Rogoff, Esquire General Counsel Mano K. Nazar, Senior Vice President J. ONeill, Jr., Shaw, Pittman, Potts & Trowbridge K. Duveneck, Town Chairman Town of Two Creeks D. Graham, Director Bureau of Field Operations A. Bie, Chairperson, Wisconsin Public Service Commission S. Jenkins, Electric Division Wisconsin Public Service Commission State Liaison Officer D. Markwardt, Manitowac County Board Chairman N. Crowley, Director, Manitowac Emergency Management G. Novickis, Chairman, Kewaunee County Board The Honorable Darin A. Jeanquart G. Buckley, Two Rivers City Manager L. Hucek, Director, Kewaunee Emergency Management C. Meyer, President, Village of Mishicot K. Duveneck, Two Creeks Town Chairman INPO

DOCUMENT NAME: C:\ORPCheckout\FileNET\ML031330441.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME MKunowski/dtp AVegel DATE 5/13/03 5/13/03 OFFICIAL RECORD COPY

A. Cayia ADAMS Distribution:

WDR DFT DWS H. Nieh (HKN), OEDO Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb JLC1 GEG HBC RML2 SRI Point Beach DRPIII DRSIII PLB1 JRK1