Notice of Open Meeting with Nuclear Management Company, LLC to Obtain Licensee'S Perspective on Significance of Preliminary Red Inspection Finding
ML031330328
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/13/2003
From: Anton Vegel
Division Reactor Projects III
To:
References
EA-03-057, IR-02-015
Download: ML031330328 (3)


Text

May 13, 2003 NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE EA-03-057 Name of Licensee: Nuclear Management Company, LLC Name of Facility: Point Beach Nuclear Plant, Units 1 & 2 Docket Nos.: 50-266; 50-301 Date and Time of Meeting: 9:00 a.m. (CDT), Friday, June 6, 2003 Location of Meeting: U. S. Nuclear Regulatory Commission Region III Office 801 Warrenville Road Lisle, Illinois 60532 Purpose of Meeting: The meeting is a Regulatory Conference to obtain the licensees perspective on the significance of a preliminary Red inspection finding related to the potential for a common mode failure of the auxiliary feedwater pumps due to pump recirculation line oriface plugging. Additionally, the Conference will address whether enforcement action is warranted for an apparent violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, that was identified during the inspection. The preliminary Red inspection finding and the apparent violation are discussed in Inspection Report 50-266/02-15(DRP); 50-301/02-15(DRP),

issued on April 2, 2003 (ADAMS Accession Number:

ML030920128).

Category: This is a Category 1 Meeting. The public is invited to observe this meeting and will have an opportunity to speak with the NRC after the business portion of the meeting, but before the meeting is adjourned.

NRC Attendees: J. Dyer, Regional Administrator, RIII G. Grant, Director, Division of Reactor Projects, RIII A. Vegel, Chief, Branch 7, Division of Reactor Projects, RIII Others as designated

Notice of Significant Licensee Meeting Licensee Attendees: J. Paul Cowan, Executive Vice-President and Chief Nuclear Officer M. Nazar, Senior Vice-President E. Weinkam, Director of Regulatory Services A. Cayia, Site Vice-President J. Jensen, Plant Manager Others as designated NOTE: Attendance at this meeting by NRC personnel should be made known to Anton Vegel via e-mail (AXV) or a telephone call ((630) 829-9620) by COB on Thursday, June 5, 2003.

Approved by: _/RA/________________________

Anton Vegel, Chief Branch 7 Division of Reactor Projects

Notice of Significant Licensee Meeting Distribution:

F. Congel (FJC), Director, Office of Enforcement D. Dambly (DCD), Assistant General Counsel for Material Litigation and Enforcement, OGC B. Sheron (BWS), Associate Director for Projects Licensing and Technical Review, NRR J. Zwolinski (JAZ), Director, Division of Licensing Project Management, NRR M. Banerjee (MXB), NRR H. Nieh (HKN), Region III Coordinator, OEDO W. Roland (WHR), Project Directorate, Division of Licensing Project Management, NRR Deirdre Spaulding, Project Manager, Project Directorate, Division of Licensing and Project Management, NRR G. Grant (GEG), Director, Division of Reactor Projects, RIII S. Reynolds (SAR1), Deputy Director, Division of Reactor Projects, RIII C. Pederson (CDP1), Director, Division of Reactor Safety, RIII R. Caniano (RJC1), Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief SRI, Point Beach DRS Branch Chiefs (RNG, DEH, RDL, KRR)

B. Clayton (HBC), Enforcement/Investigations Officer, RIII R. Lickus (RML2), State Liaison Officer, RIII PMNS RIII Public Affairs (VTM, RJS2)

J. Kweiser (JRK1), ORA P. Buckley (PLB1), ORA