ML031330274

From kanterella
Jump to navigation Jump to search
Technical Support Center Radio Communicator: Emergency Plan - Position Specific Procedure, EP-PS-109, Revision 9
ML031330274
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 05/02/2003
From: Lengel R
Susquehanna
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
Download: ML031330274 (7)


Text

May. 02, 2003 Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-22728 USER. NFORMATTON:

GERL H*R E M EMPL#:28401 CA#: 0363 Addres NUCSA2 Phone 3194 TRANSMITTAL INFORMATION:

TO: DrLrpi'^'o 11 05/02/2003 LOCATION:f DOCUMENT CONTROL DESKI--.

'ROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER NUCSA-2)

ATHE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:

109 - 109 - TECHNICAL SUPPORT CENTER (TSC) RADIO COMMUNICATOR: EMERGENCY PLAN-POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE: 04/16/2003 ADD MANUAL TABLE OF CONTENTS DATE: 05/01/2003 CATEGORY: PROCEDURES TYPE: EP ID: EP-PS-109 ADD: PCAF 2003-1329 REV: N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

K>~~~~~~~~~~~~1

4' t -.

r%Mf^r1NM= ru ^LJ ^_1= DMnf%^0L%Q C^nM PCAF NO. 12. PAGE 1 OF 6 13. PROC. NO.. EP-PS-109 REV. 9 4.FORMS REVISED- A R 0, - R - R_, - _ R , - R - R_

5. PROCEDURE TITLE TSC Radio Communicator: Emergency Plan Position Specific Procedure

. tUtZ I t) L;NANUt PERIODIC REVIEW - NO C YES INCORPORATE PCAFS E NO LIYES # # # #

REVISION El PCAF 3 DELETION [] (CHECK ONE ONLY)

7.

SUMMARY

OF / REASON FOR CHANGE :

This PCAF provides additional infornalion in Tab 10 for the TSC Radio Communicator regarding where additional radios can-be obtained, if they are needed during an emergency. This chiange is administrative in nature and can be signed by the Supervisor NEP.

'Continued 5

3. DETERMINE COMMITTEE REVIEW REQUIREMENTS (Refer to Section 6.1.4) /

PORC REVIEW REQ'D? 'NO C YES I9. PORCMTG# n/a BLOCKS 1 THRU 16 ARE ON PAGE 2 OF FORM ___

17. R. A. Lengel / I 04/2S'2003

.J3840 18. COMMUNICATION OF CHANGE REQUIRED?

-PREPARER ETN> DATE 0 NO ] YES (TYPE ra (Print or Type) L

19. SIGNATUREATTESTSTHAT RESPONSIBLE SUPERVISOR HAS

._:iCONDUCTEDQADR AND TECHNICALREVIEWUNLESSOTHERWISE (4a /.I > s r DOCUMENTED INBLOCK 16 OR ATTACHED REVIEW FORMS.

ES ERVIsOR \ ' r DISCIPLINE CROSS ' REVIEW (IF REQUIRED) HAS BEEN COMPLErED RwSsvSI LE SUPFRVISOR 'DATE BY SIGNATURE INBLOCK 16 OR ATTACHED REVIEW FORMS.

20. _ _ _ _ _ _ _lo WMAPROVAL DATE
21. RESPONSIBLE APPROVER ENTER N/A IF FUM HAS APPROVAL AUTHORITY INITIALS DATE rEt I-0 i FORM NDAP-QA-0002-8, Rev. 8, Page 1 of 2 (Electronic Form) IItDOn! ' £NTJCO NTROL i SERVI^E - SSES

PROCEDURE CHANGE PROCESS FORM

__ 1. PCAF NO., 3-L 9 12. PAGE 2 OF 6 13. PROC. NO. EP-PS-109 REV. 9

11. This question documents the outcome of the 50.59 and 72.48 Review required by NDAP-QA-0726. Either 11 a, b, c or d must be checked 'YES' and the appropriate form attached or referenced.
a. This change is an Administrative Correction for which 50.59 and 72.48 are not E YES N/A W

applicable.

b. This change is a change to any surveillance, maintenance or administrative YES [] N/A procedure for which 50.59 and 72.48 are not applicable.
c. This change is bounded by a 50.59/72.48 ScreenlEvaluation, therefore, no new a YES N/A W

50.59172.48 Evaluation is required.

Screen/Evaluation No. r/a

d. 50.59 and/or 72.48 are applicable to this change and a 50.59172.48 E YES N/A Screen/Evaluation is attached.
12. This change is consistent with the FSAR or an FSAR change is required. - YES Change Request No. n/a
13. Should this change be reviewed for potential effects on Training Needs or Material? E YES 3 NO ff YES, enter an Action Item @ NIMS/Action/Gen Work Mech/PICN
14. Is a Surveillance Procedure Review Checklist required per NDAPQA-0722? [I YES 3 NO
15. Is a Special, Infrequent or Complex Test/Evolution Analysis Form required per E YES 3 NO NDAP-QA-0320? (SICTIE form does not need to be attached.)
16. Reviews may be documented below or by attaching Document Review Forms NDAP-QA-01 01-1.

REVIEWED BY WITH DATE REVIEW- NO COMMENTS QADR TECHNICAL REVIEW REACTOR ENGINEERING/NUCLEAR FUELS

  • IST ** ' '_ ' '

OPERATIONS - -_-

NUCLEAR SYSTEMS ENGINEERING NUCLEAR MODIFICATIONS MAINTENANCE '_- _

HEALTH PHYSICS NUCLEAR TECHNOLOGY CHEMISTRY X OTHER 10 CFR 50.540 Review Q.

  • Required for changes that affect, or have potential for affecting core reactivity, nuclear fuel, core power level indication or impact the thermal power heat balance. (5)

Required for changes to Section Xl Inservice Test Acceptance Criteria.

FORM NDAP-QA-0002-8, Rev. 8, Page 2 of 2 (Electronic Form)

I EP-PS-1 09 PAGLJ_ F c2 Revision 9 Page 2 of 3

.I\.

TECHNICAL SUPPORT CENTER (TSC) RADIO COMMUNICTOR:

Emergency Plan-Position Specific Procedure WHEN: T Technical Support Center (TSC) is activated HOW NOTIFIED: Paged/Telenotification System REPORT TO: Damage Control Team Coordinator (DCTC)

WHERE TO REPORT: TSC OVERALL DUTY:

Provide communication back and forth between the work groups in the field (India teams) and the TSC.

MAJOR TASKS: TAB: REVISION:

Prepare to take over dispatching and TAB A wit P communicating with the in-plant (India) teams. c Maintain communications between the in-plant TAB B 5 (India) teams and the TSC, dispatching new teams as needed.

.,_ -S .

.- ~~~~~~~- .A TAB A EP-PS-1 09-A Revision i c Page 1 of 3 I f'cA MAJOR TASK:

Prepare to take over dispatching and communicating with the in-plant (India) teams.

SPECIFIC TASKS: HOW:

1. Notify the "DAMAGE CONTROL la. Identify yourself as the "TSC RADIO

- TEAM COORDINATOR" of your COMMUNICATOR".

arrival. -

2. Verify UHF radio operability. 2a. Call the Control room (Unaffected Unit) and request a radio operability check.

(1) Select desired System using "Double Up Arrow" and "Double Down Arrow" Buttons.

(2) Select desired Talk-Group within selected System (if needed) using "Single Up Arrow" and "Single Down Arrow" Buttons.

System Talk-Group(s) 1 SEC PRI 2 SEC BACKUP 3 OPS 1; OPS 2

-4 E PLAN A;-E PLAN B 26 OPS 1 ALT; OPS 2 ALT; SEC ALT; E PLAN ALT NOTE:

If selection of "E PLAN A" Talk-group is desired, the "HOME" button can be used switch directly to this Talk-group.

(3) Adjust Volume Control knob to desired audio level as necessary.

(4) Depressing either the Transmit key OR the handset "Push To Talk" (PTT) bar will allow the user to transmit audio.

PCAF -

TAB A J3- sF -- A EP-PS-1 09-A Revision,T/0 Page 2 of 3 I SPECIFIC TASKS: HOW:

NOTE: -

Audio is not transmitted until the TX LED

  • tums on, indicating that the radio has acquired a channel.
2. Verify UHF radio operability. 2b. Obtain the radio channel being used to maintain communications with in plant teams.
3. Obtain a briefing from the OSC 3a. In plant actions currently in progress that COORDINATOR. were directed by Shift Manager/Control Room 3b. Location of personnel in plant performing

- actions in (3a.)

3c. Immediate in plant actions i.

L 0141 3d. Ensure India Team Designators are established for these teams.

i:-Ij

4. Obtain radios from Operations or NOTE:

Security for use in TSC. If additional radios are needed to support I, emergency communications, there are i4. 5. Notify the *OSC COORDINATOR" 5 E'plan radios located in the Control when ready to assume control. Room copier room In addition, extra radios may be obtained from Operations, security or another work group

6. Monftor Control Room radio that has spare radios.

communications for in plant team.

7. Inform the in plant teams when the 7a. Notfy all teams:

TSC assumes control.

(1) The TSC is now in control.

(2) You will be communicating with them.

7b. Notify teams doing operations related tasks that:

._r (1) You will communicate their travel routes within the plant, providing i radiological conditions.

TAB A ptE£ 1 EP-PS-1 09-A

-- 6  : - Revision2 -lic Page 3 of 3 SPECIFIC TASKS: HOW:

(2) Operations will continue to give

-them specific directions on tasks to be performed.

(3) They will maintain communications with the Control Room on Operations related tasks when the TSC is in control of the emergency.