(BFN) Units 1, 2 & 3 - Emergency Plan Implementing Procedure (EPIP) Revisions
ML031290110
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 05/05/2003
From: Abney T
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
R08 030505 784 EPIP-10, Rev 24, EPIP-8, Rev 16
Download: ML031290110 (6)


Text

R08 030505 784 May 5, 2003 10 CFR Part 50, App E U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop OWFN, P1-35 Washington, D.C. 20555-0001 Gentlemen:

In the Matter of ) Docket Nos. 50-259 Tennessee Valley Authority ) 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - UNITS 1, 2, and 3 -

EMERGENCY PLAN IMPLEMENTING PROCEDURE (EPIP) REVISIONS TVA is submitting this notification in accordance with the requirements of 10 CFR Part 50, Appendix E, Section V.

Specifically, EPIPs were revised, namely, EPIP-8, Revision 16 and EPIP-10, Revision 24. The effective date for these revisions is April 21, 2003. If you have any questions, please telephone me at (256) 729-2636.

Sincerely, original signed by:

T. E. Abney Manager of Licensing and Industry Affairs cc: See Page 2

U.S. Nuclear Regulatory Commission Page 2 May 5, 2003 cc (Enclosure):

NRC Resident Inspector (Enclosure provided by Browns Ferry Nuclear Plant BFN Document Control Unit) 10833 Shaw Road Athens, Alabama 35611-6970 Mr. Stephen J. Cahill, Branch Chief (2 Enclosures)

U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street S.W., Suite 23T85 Atlanta, Georgia 30303-8931 Mr. Kahtan N. Jabbour, Senior Project Manager (w/o Enclosure)

U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9)

Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, Maryland 20852-2738

U.S. Nuclear Regulatory Commission Page 3 May 5, 2003 DTL:JEW:BAB cc (w/o Enclosure):

T. W. Cornelius, PAB 2K-BFN B. K. Marks, LP 6B-C A. S. Bhatnagar, PAB 1E-BFN EDMS-K S/LIC/SUBMIT/OPERATOR/EPIP052103.doc

ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

UNITS 1, 2, AND 3 EMERGENCY PLAN IMPLEMENTING PROCEDURE (EPIP) REVISIONS EPIP-8 AND EPIP-10 SEE ATTACHED

GENERAL REVISIONS FILING INSTRUCTIONS FILE DOCUMENTS AS FOLLOWS:

PAGES TO BE REMOVED PAGES TO BE INSERTED EPIP-8, Revision 15 EPIP-8, Revision 16 EPIP-10, Revision 23 EPIP-10, Revision 24

LICENSING TRANSMITTAL TO NRC

SUMMARY

AND CONCURRENCE SHEET THE PURPOSE OF THIS CONCURRENCE SHEET IS TO ASSURE THE ACCURACY AND COMPLETENESS OF TVA SUBMITTALS TO THE NRC.

DATE DUE NRC: 05/21/2003 SUBMITTAL PREPARED BY (1): James E. Wallace, Jr.

PEER REVIEW PERFORMED BY:

SUBJECT:

EPIP REVISIONS NEW COMMITMENTS: ___ YES __X__ NO POSTING REQUIRED: ___ YES __X__ NO Oath or Affirmation Required ____ YES __X__ NO VERIFICATION REQUIRED (2): ___ YES __X__ NO ITR REQUIRED (3) ____ YES _X___ NO APPLICABLE DCN: _____N/A________________

OR

_____________________/______________ ________________________/___________

Licensing Date ITR Reviewer Date LICENSING BASIS CHANGE - If this submittal requires a change to the licensing basis, a change has been initiated in accordance with NADP-7. ____N/A_______________ DATE ________________

A concurrence signature reflects that the signatory has assured that the submittal is appropriate and consistent with TVA Policy, applicable commitments are approved for implementation and supporting documentation for submittal completeness and accuracy has been prepared.

CONCURRENCE (4)

NAME ORGANIZATION SIGNATURE DATE A. H. Feltman EP Manager T. J. Niessen, Jr. Eng. Site Sppt.

D. T. Langley Licensing Supervisor