MONTHYEARML0312900732003-05-0808 May 2003 RAI, Draft Request for Additional Information to Be Discussed in an Upcoming Conference Call Project stage: Draft RAI ML0402002572004-01-14014 January 2004 Response to RAI for License Amendment Request 01-10, Relocation of Cycle-Specific Parameters to the Core Operating Limits Report. Project stage: Response to RAI ML0403504822004-03-23023 March 2004 License Amendment, Issuance of Amendment Relocation of Cycle-Specific Parameters to the Core Operating Limits Report Project stage: Approval ML0408602952004-03-23023 March 2004 Technical Specifications, Relocation of Cycle-Specific Parameters to the Core Operating Limits Report Project stage: Acceptance Review 2004-01-14
[Table View] |
|
---|
Category:Memoranda
MONTHYEARML23053A0502023-02-22022 February 2023 Cover Memo and Response to C-10 Questions Regarding 3Q2022 Inspection Report ML22306A0202022-11-0202 November 2022 Cover Memo and Response to C-10 Questions Regarding 2Q2022 Inspection Report ML21242A2242021-08-26026 August 2021 C-10 Research & Education Foundation Memo Dated 8/26/21 Re Questions Regarding the 2021 Second Quarter Integrated Inspection Report (05000443/2021002) ML21062A1462021-04-21021 April 2021 Memo to File: Final Ea/Fonsi of 2012 and 2015 Decommissioning Funding Plans for Seabrook Station Unit 1 Independent Spent Fuel Storage Installation (2012 and 2015) ML19057A3832019-03-0404 March 2019 Renewal of Full-Power Operating License for Seabrook Station, Unit No. 1 ML19058A2162019-03-0404 March 2019 Update to Proposed Issuance of a Final No Significant Hazards Consideration Determination and License Amendment Regarding Which a Hearing Has Been Requested (CAC No. MF8260; EPID L-2016-LLA-0007) ML18226A2052018-09-28028 September 2018 Redacted, Submission of Alkali-Silica Reaction License Amendment Request Draft Safety Evaluation to Support Advisory Committee on Reactor Safeguards Review of Seabrook License Renewal (CAC No. MF8260; EPID L-2016-LLA-0007) ML18243A4522018-08-31031 August 2018 License Renewal Application Memorandum ML17278A1662017-10-0505 October 2017 Teleconference Meeting Summary Dated August 28, 2017 with Massachusetts Attorney General'S Office and Massachusetts Emergency Management Agency ML17254A7522017-09-0606 September 2017 Alkali-Silica Reaction Issue Technical Team Charter Revision 2 ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML16056A3342016-03-0101 March 2016 Memorandum to File Regarding Transcript for 10 CFR 2.206 Petition from C-10 Research & Education Foundation Regarding Seabrook Station, Unit 1 ML15096A1682015-07-27027 July 2015 Memorandum to File from John Lamb, DORL, NRR No Significant Hazards Consideration Analysis and Categorical Exclusion Related to Proposed Exemption ML14014A3782014-02-19019 February 2014 Alkali-Silica Reaction (ASR) Issue Technical Team Charter, Revision 1 ML13193A0742013-07-16016 July 2013 Request for Additional Information - Seabrook Station Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (Tac No. MF0837) ML13128A5212013-06-10010 June 2013 Memo Position Paper -Assessment of Aci 318-71 as Design Basis for Category I Concrete Structures Affected by Alkalisilica Reaction at Seabrook Station. ML13154A5052013-06-0404 June 2013 Rai'S Following Ifib Analysis of NextEra Energy'S 2013 Decommissioning Funding Status Reports for Seabrook ML13099A2152013-04-18018 April 2013 Forthcoming Meeting with Nextera Energy Seabrook, LLC (Nextera) Regarding a Pre-Submittal for a Fixed Incore Detector License Amendment Request ML13066A4882013-03-21021 March 2013 Summary of Meeting Held on February 21, 2013, Between the NRC and NextEra Energy Seabrook, LLS Regarding License Renewal Application, Seabrook Station ML12242A3702012-09-0505 September 2012 Request for Deviation from the Reactor Oversight Process Action Matrix to Provide Increased Oversight of the Alkali-Silica Reaction Issue at Seabrook ML12236A3852012-08-23023 August 2012 Memo Summary of NextEra Energy Seabrook Drop in Visit and Slides, August 22, 2012 ML12222A0392012-08-0909 August 2012 8/16/2012 Cancellation Notice of Forthcoming Conference Call with NextEra Energy and Florida Power and Light Concerning Generic Letter 2004-02 and Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Proto ML12213A0612012-08-0101 August 2012 8/16/12 Forthcoming Conference Call with NextEra Energy and Florida Power & Light Concerning Generic Letter 2004-02 and Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Protocol ML12164A9012012-06-22022 June 2012 Summary of Telephone Conference Call Held on 5/24/12, Between the NRC and NextEra Energy Seabrook, LLC Concerning the Drai Pertaining to the Seabrook Station LRA ML13196A2202012-06-0606 June 2012 Memo from B. Balsam, NRR and D. Logan, NRR to J. Susco, NRR on Summary of Section 7 Consultation Activities Related to the National Marine Fisheries Service'S Final Rule to List the Atlantic Sturgeon ML12174A0152012-06-0404 June 2012 Draft Letter from J. Clifford, Region I to R. Nelson, NRR; Subject: Request for Technical Assistance, Seabrook Station Alkali-Silica Reaction ML12174A0122012-06-0404 June 2012 Draft Letter from J. Clifford, Region I to R. Nelson, NRR; Subject: Request for Technical Assistance, Seabrook Station Alkali-Silica Reaction ML12173A4632012-06-0404 June 2012 Draft Letter from D. Roberts, Region I to R. Nelson, NRR; Subject: Request for Technical Assistance, Seabrook Station Alkali-Silica Reaction ML12174A0172012-06-0404 June 2012 Draft Letter from J. Clifford, Region I to R. Nelson, NRR; Subject: Request for Technical Assistance, Seabrook Station Alkali-Silica Reaction ML12173A4622012-06-0404 June 2012 Draft Letter from D. Roberts, Region I to J. Jolicoeur, NRR; Subject: Request for Technical Assistance, Seabrook Station Alkali-Silica Reaction ML1208600492012-03-23023 March 2012 Corrected Notice of Forthcoming Meeting with NextEra Energy Seabrook, LLC (NextEra) Regarding Seabrook Station Concrete Degradation ML12054A7312012-02-16016 February 2012 DRAFT- from James Clifford to Robert Nelson Request for Technical Assistance Seabrook Station ALKALI-SILICA Reaction, Draft 3 ML12054A7292012-02-16016 February 2012 DRAFT- from James Clifford to Robert Nelson Request for Technical Assistance Seabrook Station ALKALI-SILICA Reaction, Draft 5 ML12054A7282012-02-16016 February 2012 DRAFT- from James Clifford to Robert Nelson Request for Technical Assistance Seabrook Station ALKALI-SILICA Reaction, Draft 5 ML12054A7272012-02-16016 February 2012 DRAFT- from James Clifford to Robert Nelson Request for Technical Assistance Seabrook Station ALKALI-SILICA Reaction, Draft 4 ML12054A7042012-02-16016 February 2012 DRAFT- from Darrell Roberts to John Jolicoeur Request for Technical Assistance Seabrook Station ALKALI-SILICA Reaction, Draft 2 ML12054A7112012-02-16016 February 2012 DRAFT- from James Clifford to Robert Nelson Request for Technical Assistance Seabrook Station ALKALI-SILICA Reaction, Draft 6 ML12054A7122012-02-16016 February 2012 DRAFT- from James Clifford to Robert Nelson Request for Technical Assistance Seabrook Station ALKALI-SILICA Reaction, Draft 7 (2) ML12054A7142012-02-16016 February 2012 DRAFT- from James Clifford to Robert Nelson Request for Technical Assistance Seabrook Station ALKALI-SILICA Reaction, Draft 8 Comment ML12054A7132012-02-16016 February 2012 DRAFT- from James Clifford to Robert Nelson Request for Technical Assistance Seabrook Station ALKALI-SILICA Reaction, Draft 8 2010817 ML12054A7302012-02-16016 February 2012 DRAFT- from James Clifford to Robert Nelson Request for Technical Assistance Seabrook Station ALKALI-SILICA Reaction, Draft 3. Resolved ML11354A1182011-12-22022 December 2011 12/8/2011 Summary of Meeting Between NRC Staff and the Nuclear Energy Institute to Discuss Current License Renewal Topics ML11343A4482011-12-0909 December 2011 NextEra Drop in Meeting Summary and Slides from 11-14-2011 Meeting with Region-I ML11327A0722011-11-30030 November 2011 Summary of Telephone Conference Call Held on November 22, 2011, Between the U.S. Nuclear Regulatory Commission and NextEra Energy Seabrook, LLC, Concerning the Response to the Request for Additional Information Pertaining to the Seabrook St ML11304A1662011-11-0404 November 2011 Summary of Tele Conf Call Held on 3/3/11, Between the USNRC and NextEra Energy Seabrook, Llc. Concerning Clarification of Information Pertaining to the Seabrook Station Request for Additional Information Responses ML11304A1512011-11-0404 November 2011 Summary of Tele Conf Call Held on 4/8/11 Between USNRC and NextEra Energy Seabrook, Llc. Concerning Clarification of Information Pertaining to the Seabrook Station Request for Additional Information Responses ML11304A1092011-11-0404 November 2011 Summary of Tele Conf Call Held on 5/31/11, Between the USNRC and Nextera Energy Seabrook, Llc., Concerning Clarification of Information Pertaining to the Seabrook LRA ML11277A0462011-10-26026 October 2011 Summary of Public Meetings Conducted to Discuss the Dseis Related to the Review of the Seabrook Station License Renewal Application ML11280A0452011-10-17017 October 2011 Summary of Telephone Conference Call Held on May 5, 2011, Between the U.S. Nuclear Regulatory Commission and NextEra Energy Seabrook, LLC, Concerning Clarification of Information Pertaining to the Seabrook Station LRA 2023-02-22
[Table view] |
Text
May 8, 2003 MEMORANDUM TO: James W. Clifford, Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: Victor Nerses, Sr. Project Manager, Section 2 /RA/
Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
SEABROOK STATION, UNIT NO. 1, FACSIMILE TRANSMISSION, DRAFT REQUEST FOR ADDITIONAL INFORMATION (RAI) TO BE DISCUSSED IN AN UPCOMING CONFERENCE CALL (TAC NO. MB4918)
The attached draft RAI was transmitted by facsimile on May 8, 2003, to Mr. Mike OKeefe of FPL Energy Seabrook, LLC (the licensee). This draft RAI was transmitted to facilitate the technical review being conducted by NRR and to support a conference call with the licensee to discuss the RAI. The RAI was related to the licensees April 15, 2002 submittal concerning a relocation of cycle specific parameters to the Core Operating Limits Report (COLR). Review of the RAI would allow the licensee to determine and agree upon a schedule to respond to the RAI. This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensees request.
Docket No. 50-443
Attachment:
Draft RAI
May 8, 2003 MEMORANDUM TO: James W. Clifford, Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: Victor Nerses, Sr. Project Manager, Section 2 /RA/
Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
SEABROOK STATION, UNIT NO. 1, FACSIMILE TRANSMISSION, DRAFT REQUEST FOR ADDITIONAL INFORMATION (RAI) TO BE DISCUSSED IN AN UPCOMING CONFERENCE CALL (TAC NO. MB4918)
The attached draft RAI was transmitted by facsimile on May 8, 2003, to Mr. Mike OKeefe of FPL Energy Seabrook, LLC (the licensee). This draft RAI was transmitted to facilitate the technical review being conducted by NRR and to support a conference call with the licensee to discuss the RAI. The RAI was related to the licensees April 15, 2002 submittal concerning a relocation of cycle specific parameters to the Core Operating Limits Report (COLR). Review of the RAI would allow the licensee to determine and agree upon a schedule to respond to the RAI. This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensees request.
Docket No. 50-443
Attachment:
Draft RAI DISTRIBUTION PUBLIC J. Clifford V. Nerses S. Colpo PDI-2 Reading Accession Number: ML031290073 OFFICE PDI-2/PM SRXB/SC NAME VNerses JUhle DATE 5/8/03 5/7/03 OFFICIAL RECORD COPY
DRAFT OFFICE OF NUCLEAR REACTOR REGULATION RELOCATION OF CYCLE SPECIFIC PARAMETERS TO COLR FPL ENERGY SEABROOK, LLC SEABROOK STATION DOCKET NO. 50-443 (TAC NO. MB4918)
By application dated April 15, 2002, FPL Energy Seabrook, LLC (the licensee) requested to amend the COLR documents list. The staff has found that additional information, as noted below, is needed to complete its review of the request by the licensee.
- 1. In Generic Letter 88-16 entitled, Removal of Cycle-Specific Parameter Limits from Technical Specifications, the NRC established a generic process that eliminated the need to modify the technical specifications to update cycle-specific parameters. A central element of the process included the addition of a Core Operating Limits Report (COLR) to include cycle-specific parameters and NRC-approved methodologies. A licensee may add approved methodologies to the COLR list using the standard technical specification modification process. When the staff reviews license requests to relocate technical specifications to the COLR, it uses two important conditions to determine acceptability. These two conditions are the following: 1) the parameter is cycle specific; and 2) an NRC approved methodology exists to calculate the parameter in an acceptably conservative manner. An NRC-approved methodology would include equations, approved codes, references to approvals of codes if approved separately, a process to ensure that input is conservative for a plant-specific application, a process to make changes to the parameter, and a demonstration that the calculated parameter is conservative to account for the conditions under which it exists .
In addition to responding to the specific requests below, please provide information that assures the surveillance of the concentration is maintained when the value is moved to the COLR.
a) Please provide justification for meeting the two conditions above including a methodology that can be approved for relocating the RWST boron concentration to the COLR.
b) Please provide justification for meeting the two conditions above including a methodology that can be approved for relocating accumulator boron concentration to the COLR.
c) Please provide reference to the two conditions above or meet the conditions above including a methodology that can be approved for relocating refueling boron concentration to the COLR.
d) Please provide reference to the two conditions above or meet the conditions above including a methodology that can be approved for relocating the boric acid storage tank concentration.
- 2. How are procedures updated and communicated to the operators when cycle specific boron concentrations are moved to the COLR?
- 3. Is the licensee requesting to add WCAP 15025-P-A to the COLR list of documents? If so please address the limitations delineated in the staff safety evaluation of the WCAP.