ML031270531

From kanterella
Jump to navigation Jump to search
Annual Radioactive Effluent Release Report
ML031270531
Person / Time
Site: Cooper 
Issue date: 05/01/2003
From: Coyle M
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NLS2003051
Download: ML031270531 (2)


Text

Nebraska Public Power District NLS2003051 Always there when you need us May 1, 2003 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001

Subject:

Annual Radioactive Effluent Release Report Cooper Nuclear Station, NRC Docket 50-298, DPR-46 The purpose of this letter is to submit to the Nuclear Regulatory Commission (NRC) the Cooper Nuclear Station (CNS) Annual Radioactive Effluent Release Report for the period January 1, 2002, through December 31, 2002. This report is being submitted for NRC use per the requirements of CNS Offsite Dose Assessment Manual (ODAM) Section D 5.3. Also included with this submittal is a copy of the ODAM, which is being provided for NRC use per the requirements of CNS Technical Specification Section 5.5.1.c.3.

In accordance with 10 CFR 50.4(b)(1), we are enclosing one signed original for your use, one copy to the Regional Office, and one copy to the NRC Senior Resident Inspector Should you have any questions regarding this submittal, please contact Paul Fleming, Licensing and Regulatory Affairs Manager, at 402-825-2774.

Sincerely, Michael T. Coyle Site Vice President

/cb Enclosures cc:

Regional Administrator USNRC - Region IV Senior Project Manager USNRC - NRR Project Directorate IV--I Senior Resident Inspector USNRC NPG Distribution w/o enclosures Records wv' enclosures COOPER NUCLEAR STATION PO Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www nppd corn

I ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS Correspondence Number: NLS2003051 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the NL&S Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE None

+

I

-t I

PROCEDURE 0.42 l

REVISION 12 l

PAGE 14 OF 16