Dominion Nuclear Connecticut, Inc.

i Dominion-Millstone Power Station Rope Ferry Road Waterford, CT 06385 APR 2 8 2003 Docket Nos. 50-245 50-336 50-423 B18875 RE: 10 CFR 50.36a U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Power Station, Unit Nos. 1, 2 and 3 2002 Radioactive Effluent Release Report In accordance with 10 CFR 50.36a, this letter transmits the annual Radioactive Effluent Release Report for the period January 2002 through December 2002. This report meets the provisions of Section 5.7.3 of the Millstone Unit No. 1 Permanently Defueled Technical Specifications (PDTS) and of Sections 6.9.1.6b and 6.9.1.4 of the Millstone Unit Nos. 2 and 3 Technical Specifications, respectively. transmits Volume I of the 2002 Radioactive Effluent Release Report, in accordance with Regulatory Guide 1.21.

Volume I contains information regarding airborne, liquid, and solid radioactivity released from Millstone, as well as off-site doses from airborne and liquid radioactive effluents. transmits Volume II of the report, which contains those changes made to the Radioactive Effluent Monitoring and Off-site Dose Calculation Manual (REMODCM) during the year 2002. Volume II consists of a complete copy of the REMODCM as of December 31, 2002, which satisfies the requirements of Sections 5.6.1c of the Millstone Unit No. I PDTS, and of Sections 6.15c and 6.9.13c of the Millstone Unit Nos. 2 and 3 Technical Specifications, respectively.

There are no regulatory commitments contained within this submittal.

If you should have any questions concerning this submittal, please contact Mr. David W. Dodson at (860) 447-1791, extension 2346.

Very truly yours, DOMINION NUCLEAR CONNECTICUT, INC.

Site President - Millstone cc:

See next page

U.S. Nuclear Regulatory Commission B18875/Page 2 Enclosures (2) cc:

H. J. Miller, Region I Administrator D. G. Holland, NRC Project Manager, Millstone Unit No. 1 J. R. Wray, NRC Inspector, Region I, Millstone Unit No. 1 R. B. Ennis, NRC Senior Project Manager, Millstone Unit No. 2 V. Nerses, NRC Senior Project Manager, Millstone Unit No. 3 Millstone Senior Resident Inspector Mr. Robert Oliveira American Nuclear Insurers Town Center, Suite 300S 29 South Main Street West Hartford, CT 06107-2430