ML031260775

From kanterella
Jump to navigation Jump to search
Reply to Notice of Violation Dated 03/04/2003 - Acknowledgement of Receipt of Letter Dated 04/03/2003
ML031260775
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 05/06/2003
From: Ring M
NRC/RGN-III/DRP/RPB1
To: Kanda W
FirstEnergy Nuclear Operating Co
References
EA-03-007
Download: ML031260775 (4)


Text

May 6, 2003 EA 03-007 Mr. William R. Kanda Vice President - Nuclear, Perry FirstEnergy Nuclear Operating Company P. O. Box 97, A210 10 Center Road Perry, OH 44081

SUBJECT:

PERRY NUCLEAR POWER PLANT REPLY TO NOTICE OF VIOLATION DATED MARCH 4, 2003

Dear Mr. Kanda:

This acknowledges receipt of your letter dated April 3, 2003, in response to our letter dated March 4, 2003, transmitting a Notice of Violation.

We have reviewed the corrective actions as described in your letter, and we have no further questions at this time. Your corrective actions will be examined during a future inspection using Inspection Procedure 95001 in accordance with the Action Matrix (Exhibit 5) of NRC Manual Chapter 0305. Current planning has targeted the week of July 28, 2003, for the IP 95001 inspection.

In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Mark A. Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-440 License No. NPF-58 See Attached Distribution

DOCUMENT NAME: C:\ORPCheckout\FileNET\ML031260775.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII E RIII E RIII RIII NAME MRing for MRing RLerch/trn DATE 05/06/03 05/06/03 OFFICIAL RECORD COPY

W. Kanda cc: B. Saunders, President - FENOC K. Ostrowski, Director, Nuclear Maintenance Department V. Higaki, Manager, Regulatory Affairs J. Messina, Director, Nuclear Services Department T. Lentz, Director, Nuclear Engineering Department T. Rausch, Plant Manager, Nuclear Power Plant Department Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health

W. Kanda ADAMS Distribution:

AJM DFT SPS1 RidsNrrDipmIipb GEG HBC RJP C. Ariano (hard copy)

DRPIII DRSIII PLB1 JRK1