INDIAN POINT UNITS 2 & 3 ANNUAL ASSESSMENT MEETING APRIL 28, 2003 Crystal Bay on the Hudson, Charles Point Marina -

Peekskill, New York U.S. NUCLEAR REGULATORY COMMISSION - Region I KING OF PRUSSIA, PA

AGENDA P INTRODUCTIONS P BACKGROUND - STATION PERFORMANCE HISTORY P 2002 NRC INSPECTIONS AND OVERSIGHT P 2002 INDIAN POINT PERFORMANCE ASSESSMENT P 2003 OVERSIGHT AND PLANNED INSPECTIONS P NRC SELF-IMPROVEMENT EFFORTS P ENTERGY RESPONSE P NRC - ENTERGY MEETING ADJOURN P PUBLIC QUESTION AND ANSWER SESSION 2

UNIT 2 PERFORMANCE HISTORY P NRC OVERSIGHT FOR PAST SEVERAL YEARS

< Heightened Attention and Special Inspections (1997-1999)

< Agency Focus Plant (April 2000)

P MULTIPLE DEGRADED CORNERSTONE COLUMN PLANT (Third Quarter 2000 through Third Quarter 2002)

< Design Control and Quality of Engineering

< Human Performance

< Equipment Reliability

< Corrective Action 3

UNIT 2 PERFORMANCE HISTORY (CONTD)

P SINGLE DEGRADED CORNERSTONE COLUMN PLANT (Since Fourth Quarter 2002)

< Licensed Operator Requalification Examination Failures -

Yellow Finding (Opened Fourth Quarter 2001)

P SUBSTANTIVE CROSS-CUTTING ISSUES

< Human Performance

< Corrective Actions 4

UNIT 3 PERFORMANCE HISTORY P LICENSEE RESPONSE COLUMN (Since Initiation of Revised Reactor Oversight Process in April 2000) 5

CONSOLIDATION OF UNITS P NOV 2000 IP-3 OWNERSHIP TRANSFER P SEPT 2001 IP-2 OWNERSHIP TRANSFER P MANAGEMENT INTEGRATION

< SINGLE PLANT MANAGER

< OPERATIONS

< MAINTENANCE

< ENGINEERING

< SECURITY

< EMERGENCY PREPAREDNESS 6

REACTOR OVERSIGHT PROCESS Strategic Performance Areas Safety Cornerstones Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response 7

2002 NRC INSPECTIONS AND OVERSIGHT P RESIDENT AND REGION BASED SPECIALIST INSPECTIONS

< BASELINE INSPECTIONS - UNITS 2 AND 3

- Emergency Response Exercise (September 2002)

- Operator Requalification Exams (September 2002)

< SUPPLEMENTAL INSPECTIONS -UNIT 2

- Operator Requalification Inspection (April 2002)

- Problem Identification and Resolution Inspection (July & December 2002)

P NRC HEADQUARTERS LICENSING REVIEWS P NRC MANAGEMENT SITE VISITS AND PERFORMANCE MONITORING MEETINGS 8

2002 INDIAN POINT PERFORMANCE ASSESSMENT P PERFORMANCE CONTINUES TO IMPROVE -

EFFORTS STILL NEEDED TO STRENGTHEN PROGRAMS P FINDINGS AND PERFORMANCE INDICATORS

< Unit 2 and 3: Performance Indicators All Green

< Unit 2: White Finding for Design Control (Control Room Fire Barrier) -All Other Findings Green

< Unit: 3 All Findings Green 9

2002 INDIAN POINT PERFORMANCE ASSESSMENT (CONTD)

P IMPROVED AREAS

< Management Focus on Priority Work and Accountability

< Progress in Correcting Important Equipment Problems (e.g., Control Room Deficiencies)

< Fundamentals Improvement Progam Performance Indicators

< Operator Performance

< Security Upgrades 10

2002 INDIAN POINT PERFORMANCE ASSESSMENT (CONTD)

P ISSUES ASSOCIATED WITH STEAM GENERATOR TUBE FAILURE

< Issues Substantially Addressed -Red Finding Closed (August 2002)

P LICENSED OPERATOR TRAINING

< Significant Management Attention

< Positive Operator Requalification Exam Results

< Yellow Finding Open Pending Initial License Examination and NRC Inspection Results 11

2002 INDIAN POINT PERFORMANCE ASSESSMENT (CONTD)

P HUMAN PERFORMANCE

< Better Performance Overall -Evidenced By:

- Response to Events

- Plant Startup and Shutdown Evolutions

< Some Problems Occurred:

- Licensed Operator Technical Specifications Familiarity and Operability Issues

- Non-Licensed Operator Plant Configuration Control

< Continued Efforts Needed - Cross-Cutting Issue Remains Open 12

2002 INDIAN POINT PERFORMANCE ASSESSMENT (CONTD)

P CORRECTIVE ACTION PROGRAM

< Low Threshold for Problem Identification, Effective Prioritization of Issues, Improved Timeliness in Problem Report Evaluations

< Weak Corrective Actions in Certain Instances (e.g., Control Room Firewall)

< Corrective Maintenance Backlogs Reduced; However, Total Corrective Action and Maintenance Backlogs Remain High

< Improved Work Management Tools and Increased Management Attention -Improved Use of These Tools Important to Reducing Backlogs

< Continued Efforts Needed - Cross-Cutting Issue Remains Open 13

2002 INDIAN POINT PERFORMANCE ASSESSMENT (CONTD)

P DESIGN CONTROL

< Significant Resources Continue to be Devoted to Design Basis Information Upgrades

< Some Implementation Issues (e.g., Calculation Roadmaps)

< Effective Implementation of Design Basis Initiative Program Important 14

2002 INDIAN POINT PERFORMANCE ASSESSMENT (CONTD)

P SECURITY PROGRAM

< Strong Overall

- Heavily Defended Facility

- Substantial Security Upgrades Completed

- Site Meets NRC Regulations, Orders and Threat Advisories

< Some Performance Issues (e.g., Security Officer Inattentiveness and Weapons Handling)

< Security Officer Concerns 15

2002 INDIAN POINT PERFORMANCE ASSESSMENT (CONTD)

P EMERGENCY PREPAREDNESS

< Effective Licensee Performance

< Issues at Joint News Center

< Offsite Issues Being Addressed Through FEMA Process 16

2003 OVERSIGHT AND INSPECTION P CONTINUED HEIGHTENED LEVEL OF NRC OVERSIGHT THROUGH THE END OF 2003

< Periodic Management Site Visits and Meetings to Review Progress

< Continued Focus on Security

< Continued Close Coordination and Support of FEMA, State, and Counties to Address Offsite Emergency Planning and Preparedness Issues P CONTINUED OPENNESS TO PUBLIC

< Outreach Activities

< Public Meetings 17

2003 OVERSIGHT AND INSPECTIONS P BASELINE INSPECTIONS - Units 2 and 3 P SECURITY INSPECTIONS

< Special Inspections to Review Concerns (Jan/Feb 2003)

< Inspection to Verify Implementation of Interim Compensatory Measures (Jan 2003)

< Additional Inspections As Needed For New Requirements P LICENSED OPERATOR TRAINING

< Initial License Examinations (March 2003)

< Training Inspection (March/April 2003)

P PROBLEM IDENTIFICATION AND RESOLUTION

< Supplemental Inspection (Nov 2003)

< Expanded PI&R Samples 18

NRC SELF-IMPROVEMENT EFFORTS P Significance Determination Process Task Group P Performance Indicator Program P Davis-Besse Lessons Learned Task Force P Security Enhancements 19

NRC RESPONSE TO 9/11 P HIGH LEVEL OF SECURITY ESTABLISHED AND MAINTAINED P THREAT ADVISORIES AND ORDERS ISSUED TO NUCLEAR POWER PLANTS

< Increased Patrols, Barriers, and Posts

< Augmented Security Capabilities

< Enhanced Coordination with Law Enforcement and State Assets

< Limited Site Access

< Enhanced Security Awareness P THREAT ADVISORY AND PROTECTIVE MEASURE SYSTEM P ONGOING COMPREHENSIVE REVIEW OF SECURITY 20 AND VULNERABILITY STUDIES

NRC SECURITY PROGRAM UPDATE P FORCE-ON-FORCE EXERCISES -RESUMED FEBRUARY 2003 P FATIGUE ORDER - PENDING P TRAINING ORDER - PENDING P DESIGN BASIS THREAT - REVISION PENDING 21

QUESTIONS & ANSWERS P PROVIDE ADDITIONAL COMMENTS ON NRC PUBLIC MEETING FEEDBACK FORM P ADDITIONAL INFORMATION ON THE TOPICS DISCUSSED CAN BE FOUND AT: www.nrc.gov

< REACTOR OVERSIGHT PROCESS http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html

< PUBLIC ELECTRONIC READING ROOM http://www.nrc.gov/reading-rm/adams.html

< PUBLIC DOCUMENT ROOM 800-397-4209 (TOLL FREE) 22