INDIAN POINT UNITS 2 & 3 ANNUAL ASSESSMENT MEETING APRIL 28, 2003 Crystal Bay on the Hudson, Charles Point Marina -

Peekskill, New York U.S. NUCLEAR REGULATORY COMMISSION - Region I KING OF PRUSSIA, PA

AGENDA P INTRODUCTIONS P BACKGROUND - STATION PERFORMANCE HISTORY P 2002 NRC INSPECTIONS AND OVERSIGHT P 2002 INDIAN POINT PERFORMANCE ASSESSMENT P 2003 OVERSIGHT AND PLANNED INSPECTIONS P NRC SELF-IMPROVEMENT EFFORTS P ENTERGY RESPONSE P NRC - ENTERGY MEETING ADJOURN P PUBLIC QUESTION AND ANSWER SESSION 2

UNIT 2 PERFORMANCE HISTORY P NRC OVERSIGHT FOR PAST SEVERAL YEARS

 Heightened Attention and Special Inspections (1997-1999)

 Agency Focus Plant (April 2000)

P MULTIPLE DEGRADED CORNERSTONE COLUMN PLANT (Third Quarter 2000 through Third Quarter 2002)

 Design Control and Quality of Engineering

 Human Performance

 Equipment Reliability

 Corrective Action 3

UNIT 2 PERFORMANCE HISTORY (CONTD)

P SINGLE DEGRADED CORNERSTONE COLUMN PLANT (Since Fourth Quarter 2002)

 Licensed Operator Requalification Examination Failures -

Yellow Finding (Opened Fourth Quarter 2001)

P SUBSTANTIVE CROSS-CUTTING ISSUES

 Human Performance

 Corrective Actions 4

UNIT 3 PERFORMANCE HISTORY P LICENSEE RESPONSE COLUMN (Since Initiation of Revised Reactor Oversight Process in April 2000) 5

CONSOLIDATION OF UNITS P NOV 2000 IP-3 OWNERSHIP TRANSFER P SEPT 2001 IP-2 OWNERSHIP TRANSFER P MANAGEMENT INTEGRATION

 SINGLE PLANT MANAGER

 OPERATIONS

 MAINTENANCE

 ENGINEERING

 SECURITY

 EMERGENCY PREPAREDNESS 6

REACTOR OVERSIGHT PROCESS Safety Cornerstones Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas 7

2002 NRC INSPECTIONS AND OVERSIGHT PRESIDENT AND REGION BASED SPECIALIST INSPECTIONS

 BASELINE INSPECTIONS - UNITS 2 AND 3

- Emergency Response Exercise (September 2002)

- Operator Requalification Exams (September 2002)

 SUPPLEMENTAL INSPECTIONS -UNIT 2

- Operator Requalification Inspection (April 2002)

- Problem Identification and Resolution Inspection (July & December 2002)

PNRC HEADQUARTERS LICENSING REVIEWS PNRC MANAGEMENT SITE VISITS AND PERFORMANCE MONITORING MEETINGS 8

2002 INDIAN POINT PERFORMANCE ASSESSMENT P PERFORMANCE CONTINUES TO IMPROVE -

EFFORTS STILL NEEDED TO STRENGTHEN PROGRAMS P FINDINGS AND PERFORMANCE INDICATORS

 Unit 2 and 3: Performance Indicators All Green

 Unit 2: White Finding for Design Control (Control Room Fire Barrier) -All Other Findings Green

 Unit: 3 All Findings Green 9

2002 INDIAN POINT PERFORMANCE ASSESSMENT (CONTD)

P IMPROVED AREAS

 Management Focus on Priority Work and Accountability

 Progress in Correcting Important Equipment Problems (e.g., Control Room Deficiencies)

 Fundamentals Improvement Progam Performance Indicators

 Operator Performance

 Security Upgrades 10

2002 INDIAN POINT PERFORMANCE ASSESSMENT (CONTD)

P ISSUES ASSOCIATED WITH STEAM GENERATOR TUBE FAILURE

 Issues Substantially Addressed -Red Finding Closed (August 2002)

P LICENSED OPERATOR TRAINING

 Significant Management Attention

 Positive Operator Requalification Exam Results

 Yellow Finding Open Pending Initial License Examination and NRC Inspection Results 11

2002 INDIAN POINT PERFORMANCE ASSESSMENT (CONTD)

P HUMAN PERFORMANCE

 Better Performance Overall -Evidenced By:

- Response to Events

- Plant Startup and Shutdown Evolutions

 Some Problems Occurred:

- Licensed Operator Technical Specifications Familiarity and Operability Issues

- Non-Licensed Operator Plant Configuration Control

 Continued Efforts Needed - Cross-Cutting Issue Remains Open 12

2002 INDIAN POINT PERFORMANCE ASSESSMENT (CONTD)

P CORRECTIVE ACTION PROGRAM

 Low Threshold for Problem Identification, Effective Prioritization of Issues, Improved Timeliness in Problem Report Evaluations

 Weak Corrective Actions in Certain Instances (e.g., Control Room Firewall)

 Corrective Maintenance Backlogs Reduced; However, Total Corrective Action and Maintenance Backlogs Remain High

 Improved Work Management Tools and Increased Management Attention -Improved Use of These Tools Important to Reducing Backlogs

 Continued Efforts Needed - Cross-Cutting Issue Remains Open 13

2002 INDIAN POINT PERFORMANCE ASSESSMENT (CONTD)

P DESIGN CONTROL

 Significant Resources Continue to be Devoted to Design Basis Information Upgrades

 Some Implementation Issues (e.g., Calculation Roadmaps)

 Effective Implementation of Design Basis Initiative Program Important 14

2002 INDIAN POINT PERFORMANCE ASSESSMENT (CONTD)

P SECURITY PROGRAM

 Strong Overall

- Heavily Defended Facility

- Substantial Security Upgrades Completed

- Site Meets NRC Regulations, Orders and Threat Advisories

 Some Performance Issues (e.g., Security Officer Inattentiveness and Weapons Handling)

 Security Officer Concerns 15

2002 INDIAN POINT PERFORMANCE ASSESSMENT (CONTD)

P EMERGENCY PREPAREDNESS

 Effective Licensee Performance

 Issues at Joint News Center

 Offsite Issues Being Addressed Through FEMA Process 16

2003 OVERSIGHT AND INSPECTION P CONTINUED HEIGHTENED LEVEL OF NRC OVERSIGHT THROUGH THE END OF 2003

 Periodic Management Site Visits and Meetings to Review Progress

 Continued Focus on Security

 Continued Close Coordination and Support of FEMA, State, and Counties to Address Offsite Emergency Planning and Preparedness Issues P CONTINUED OPENNESS TO PUBLIC

 Outreach Activities

 Public Meetings 17

2003 OVERSIGHT AND INSPECTIONS P BASELINE INSPECTIONS - Units 2 and 3 P SECURITY INSPECTIONS

 Special Inspections to Review Concerns (Jan/Feb 2003)

 Inspection to Verify Implementation of Interim Compensatory Measures (Jan 2003)

 Additional Inspections As Needed For New Requirements P LICENSED OPERATOR TRAINING

 Initial License Examinations (March 2003)

 Training Inspection (March/April 2003)

P PROBLEM IDENTIFICATION AND RESOLUTION

 Supplemental Inspection (Nov 2003)

 Expanded PI&R Samples 18

NRC SELF-IMPROVEMENT EFFORTS P Significance Determination Process Task Group P Performance Indicator Program P Davis-Besse Lessons Learned Task Force P Security Enhancements 19

NRC RESPONSE TO 9/11 P HIGH LEVEL OF SECURITY ESTABLISHED AND MAINTAINED P THREAT ADVISORIES AND ORDERS ISSUED TO NUCLEAR POWER PLANTS

 Increased Patrols, Barriers, and Posts

 Augmented Security Capabilities

 Enhanced Coordination with Law Enforcement and State Assets

 Limited Site Access

 Enhanced Security Awareness P THREAT ADVISORY AND PROTECTIVE MEASURE SYSTEM P ONGOING COMPREHENSIVE REVIEW OF SECURITY AND VULNERABILITY STUDIES 20

NRC SECURITY PROGRAM UPDATE P FORCE-ON-FORCE EXERCISES -RESUMED FEBRUARY 2003 P FATIGUE ORDER - PENDING P TRAINING ORDER - PENDING P DESIGN BASIS THREAT - REVISION PENDING 21

QUESTIONS & ANSWERS P PROVIDE ADDITIONAL COMMENTS ON NRC PUBLIC MEETING FEEDBACK FORM P ADDITIONAL INFORMATION ON THE TOPICS DISCUSSED CAN BE FOUND AT: www.nrc.gov

 REACTOR OVERSIGHT PROCESS http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html

 PUBLIC ELECTRONIC READING ROOM http://www.nrc.gov/reading-rm/adams.html

 PUBLIC DOCUMENT ROOM 800-397-4209 (TOLL FREE) 22