ML031190622

From kanterella
Jump to navigation Jump to search
Emergency Plan Implementing Procedures Update
ML031190622
Person / Time
Site: Indian Point  
Issue date: 04/02/2003
From:
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
FOIA/PA-2003-0379, FOIA/PA-2003-0388
Download: ML031190622 (7)


Text

13-MAR-03 Page:

DISTRIBUTION CONTROL LIST tocument Name:

EMER PLAN CC-NAME NAME DEPT LOCATION 2 EP/TRAINING ADMINISTRATOR 3 RES DEPARTMENT MANAGER 4 REFERENCE LIBRARY 9 JOINT NEWS CENTER 10 SHIFT MGR.(LUB-001-GEN) 11 CONTROL ROOM & MASTER 14 EOF 16 AEOF/A.GROSJEAN(ALL EP'S) 19 NUC ENGINEERING LIBRARY 21 TSC 22 RESIDENT INSPECTOR 23 SILK DAVID 24, SILK DAVID (25 DOCUMENT CONTROL DESK 28 AVRAKOTOS N 29 E-PLAN STAFF 30 E-PLAN STAFF 31 BARANSKI J(VOLUME I ONLY) 32 SUTTON A -(VOLUME I ONLY) 33 LONGO N (VOLUME I ONLY) 34 GREENE D (VOLUME I ONLY) 35 RAMPOLLA M(VOLUME I ONLY) 41 SIMULATOR 107 QA MANAGER 319 C.STELLATO(NRQ-OPS TRN) 354 L.GRANT(LRQ-OPS/TRAIN) 376 E-PLAN STAFF 424 J.CHIUSANO(OPS INSTR) 510 L.GRANT(LRQ-OPS/TRAIN) 511 L.GRANT(LRQ-OPS/TRAIN) 512 C.STELLATO(NRQ-OPS TRN) 513 C.STELLATO(NRQ-OPS TRN) 517 PLANT MANAGER'S OFFICE 518 DOCUMENT CONTROL 520 CONTROL ROOM (UNIT 2) 521 SIMULATOR 522 NRC RESIDENT 523 ROBERT VOGLE (UNIT 2) 524 JOHN MCCANN (UNIT 2)

TRAINING (ALL EP'S)

RES (UNIT 3/IPEC ONLY)

REC/TRN(UNT 3/IPEC ONLY)

EMER PLN (ALL EP'S)

OPS (UNIT 3/IPEC ONLY)

OPS(3PT-D001/6(U3/IPEC)

E-PLAN (ALL EP'S)

E-PLAN (EOP'S ONLY)

DOC (UNIT 3/IPEC ONLY)

RECORDS US NRC(UNIT 3/IPEC ONLY)

NRC (ALL EP'S)

NRC (ALL EP'S)

NRC (ALL EP'S)

'J A(UNIT 3/IPEC ONLY)

E-PLAN (ALL EP'S)

E-PLAN (ALL EP'S)

ST. EMERG. MGMT. OFFICE DISASTER & EMERGENCY EMERGENCY SERVICES DISASTER & CIVIL DEFENSE OFFICE OF EMERG MANAGE TRAIN(UNIT 3/IPEC ONLY)

QA (UNIT 3/IPEC)

NRQ (UNIT 3/IPEC-ONLY)

LRQ (UNIT 3/IPEC ONLY)

E-PLAN (ALL EP'S)

(UNIT 3/IPEC ONLY)

LRQ (UNIT 3/IPEC ONLY)

LRQ (UNIT 3/IPEC ONLY)

NRQ (UNIT 3/IPEC ONLY)

NRQ (UNIT 3/IPEC ONLY)

ADMIN/(UNIT 2/IPEC ONLY)

UNIT 2(UNIT 2/IPEC ONLY)

OPS (UNIT 2 & IPEC ONLY)

TRAIN (UNIT 2/IPEC ONLY)

US NRC(UNIT 2/IPEC ONLY)

TRAIN/LIB (ALL EP'S)

NUC SAFETY/LIC(ALL EP'S)

  1. 48 45-4-A BLDG/17 EOF IP3 IP3(ONLY)

EOF WPO-12D WPO/7A 45-3-F 45-2-B OFFSITE OFFSITE OFFSITE OFFSITE EOF EOF OFFSITE WESTCHESTR ROCKLAND ORANGE PUTNAM 48-2-A TRL #2A

  1. 48
  1. 48 EOF
  1. 48
  1. 48
  1. 48
  1. 48
  1. 48 IP2 IP2 IP2 IP2 IP2 TODDVILLE IP2 f\\5V

fEn tergy Indian Point 3 AP-18.2 Revision 10 Page lof I CONTROLLED DOCUMENT TRANSMITTAL FORM TO: DISTRIBUTION DATE 4/15/2003 TRANSMITTAL NO: 28024 FROM:IP3 DOCUMENT CONTROL GROUP EXTENSION: 2038 The Document(s) identified below are forwarded for use. In accordance with AP-18.2, please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, void, or inactive document(s). Sign and return the receipt acknowledgement below within fifteen (15) working days.

AFFECTED DOCUMENT: EMERGENCY PLAN IMPLEMENTING PROCEDURES:

IP2 DOC l REV l

TITLE INSTRUCTIONS PlL () FV A TiYACGEi VIMS177 F

7JCT'IONS

  • PLEASE NOTE EFFECTIVE DATES**

RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S) (IF APPLICABLE) AS SHOWN ON THE DOCUMENT(S).

NAME (PRINT)

SIGNATURE DATE CC#

2Z TO:

Nuclear Regulatory Commission FROM:

IPEC Emergency Planning

SUBJECT:

Emergency Planning Document Update Date: 04/2/03 Please update your controlled copy of the documents listed below as specified with the copy(s) attached.

Please sign this memo indicating that you have completed the update as specified and return to:

Entergy Nuclear Indian Point Nuclear Generating Station Records and Documents Department Broadway & Bleakley Aves.

Buchanan, NY 10511 Attn: Document Custodian Update completed as specified Signature of Controlled Copy Holder Date

Unit 2 Emergency Plan Implementing Procedures Table of Contents IP-1 001 Mobilization of Onsite Emergency Organization 13 5/25/01 IP-1002 Emergency Notification and Communication 29 3/6/03 IP-1 003 Planned Discharge of Containment Atmosphere During Accident 7

4/16/01 Conditions IP-1004 Post Accident Offsite Environmental Surveys, Sampling and Counting 5

9/1/99 IP-1007 Cancelled IP-1008 Personnel Radiological Check and Decontamination 7

4/29/02 IP-1009 Radiological Check and Decontamination of Vehicles 7

9/1/99 IP-1010 Central Control Room 9

3/6/03 IP-1011 Cancelled - Replaced by IP-EP-260 IP-1012 Onsite Medical Emergency 10 5/25/01 IP-1013 Cancelled IP-1014 Radiological Check of Equipment Before It Leaves the Site 6

9/1/99 IP-1015 Radiological Monitoring Outside the Protected Area 11 3/6/03 IP-1016 Cancelled IP-1019 Cancelled - Replaced by IP-EP-250 IP-1020 Airborne Activity Determination 8

01/12/01 IP-1 021 Cancelled IP-1022 Cancelled IP-1023 Operations Support Center (OSC) 19 8/21/02 IP-1024 Emergency Classification 11 7/11/02 IP-1025 Cancelled IP-1026 Emergency Data Acquisition 1

10/31/02 IP-1027 Personnel Accountability and Evacuation 17 8/21/02 IP-1030 Emergency Operations Facility (EOF) 8 11/20/02 IP-1033 Cancelled IP-1035 Technical Support Center (TSC) 17 9/23/02 Page 1 of 2 As of 4/2/03

Unit 2 Emergency Plan Implementing Procedures Table of Contents IP-1 036 Cancelled IP-1037 Cancelled IP-1039 Offsite Contamination Checks 9

01/12/01 IP-1045 Cancelled IP-1047 Cancelled IP-1048 Cancelled IP-1050 Security 4

8/21/02 Page 2 of 2 As of 4/2/03

Entery

-tmergyrimusumivrcri wp- -,..

adon Pont C !JPP PO Box 308 Buchanan, NY 10511 Tel 914 7 36 8000

/'0

'Ih,

'1w.

f.

0 V v

I IS VOID I

~--~

--I ELntervu--

EntergY NlUctlear UPI Indonf Poniil rJPP PO. E-oy 308 Buchanan, NY 10511 Tel 914 7368000

(_L /

/P-z/9 4Ae /W /

IS VOID i

I I