ML031140493
| ML031140493 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 04/17/2003 |
| From: | Susquehanna |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML031140493 (8) | |
Text
a' Apr. 17, 2003 Page 1
of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-19544 USER INFORMATION:
GERLACH*
SE N E
L#:28401 CA#: 0363 Address: N 5A2 Phone#: 2 4-31 TRANSMITAL INFORMATION:
TO:
GERLjACH*ROSE i' 04/17/2003 LOCATION:
DOCUMENT CONTROL DESK FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
,-THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
113 -
113 -
SECURITY COORDINATOR:
EMERGENCY PLAN-POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE: 02/26/2003 ADD MANUAL TABLE OF CONTENTS DATE: 04/16/2003 CATEGORY: PROCEDURES TYPE: EP ID:
EP-PS-113 REPLACE:
REV:8 REPLACE:
REV:8 REMOVE: PCAF 2002-1242 REV: N/A REMOVE: PCAF 2002-1563 REV: N/A ADD: PCAF 2002-1242 REV: N/A ADD: PCAF 2002-1563 REV: N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
p~ 5
(
(
Tab 2 EP-PS-1 13-2 EMERGENCY ORGANIZATION CONTROL ROOM EMERGENCY DIRECTOR (SHIFT MANAGER)
OPERATORS EMERGENCY PLAN COMMUNICATOR SHIFT TECHNICAL ADVISOR (STA)
EP-AD-000-406, Revision 15, Page 1 of 3
(
(
/
Tab 2 EP-PS-1 13-2 TSC ORGANIZATION
- EMERGENCY DIRECTOR IiI
- Operations Coordinator Admin
- Security
- Rad Prot Coordinator Coordinator Coordinator Shift Manager
- TSC Communicators
- Denotes minimum staffing.
Rev. 41, 03/03
- Severe Accident
- Damage Management Control Team Coordinator Coord.
Susquehanna Steam Electric Station Units 1 and 2 Emergency Plan TSC ORGANIZATION FIGURE 6 2 EP-AD-000-406, Revision 15, Page 2 of 3
(
(
Tab 2 EP-PS-1 13-2 EOF ORGANIZATION
- ENGINEER.
DOSE LIAISON SUPPORT ASSESSMENT SUPPORT
- EOF SUPPORT SUPERVISOR SUPERVISOR SUPERVISOR SUPERVISOR l NUCLEAR DOSE COUNTY I
El FUELS ASSESSMENT LIAISONS COMMUP ENGINEER STAFFER(S) lELECTRICAL lF!ELDTEAM NEP I SUPPORT DIRECTOR PLA!N ENGINEER
- MECHANICAL SUPPORT RDADN ENGINEER MONITORING ASSIS ISYSTEMS LEAD ENVIRONMENTALSE ENGINEER SAMPLINQ TEAM SC
_ DRAD LIAISON
- Designates minimum requirements in accordance with Table 6.2, SSES Emergency Plan.
EP-AD-000-406, Revision 15, Page 3 of 3
Tab 8 EP-PS-1 13-8 CHECK-OFF LIST TITLE: ACCOUNTABILITY ITEM CHECKED YES NO
- 1.
NOTIFIED OF ACCOUNTABILITY A. Start "Accountability Control" program. This program starts the accountability process on the SSCS.
'SECURITYIS 'REQULRED TO-REPORTATHE RESULTS'OF THE ACCOUNTABILITY,.WIlTIN 30 MINUTES OF3HE OFFICIAL START_ _
(NOTE: ACCOUNTABILITY OFFICIALLY STARTS WITH STATION ALARM OVER THE PA)
- 2.
ASCC/SCC WILL.NOTIFY OF ACCOUNTABILITY A. Security Shift Supervisor/Assistant B. All posts and patrols
- 3.
INITIATE AN ACCOUNTABILITY OF SECURITY PERSONNEL A. The SCC/ASCC will verify all on duty Security shift personnel are accounted for B. Direct the ACO to stop processing All Non-Essential Personnel and Vehicles
- 1)
South Gatehouse
- 2)
North Gatehouse (when open)
- 4.
MONITOR THE PROGRESS OF THE ACCOUNTABILITY USING SSCS A. Using the accountability status window on the SSCS B. If the below listed work groups do not telephone their Accountability results into Security within 15 minutes - Security is required to call the work group(s) and request the status of their accountability
- 1)
Operations - ext. 3907
- 2)
Chemistry - ext. 3389
- 3)
Health Physics - ext. 3371 EP-AD-000-385, Revision 13, Page 1 of 4
.r Tab 8 EP-PS-1 13-8 CHECK-OFF LIST TITLE: ACCOUNTABILITY ITEM CHECKED YES NO
- 5.
MONITOR CALLS FROM THE ACCOUNTABILITY AREA LEADERS AT THE ACCOUNTABILITY AREAS A. Accountability Area A POC:
S&A Cafeteria Phone Call back #:1 624 B. Accountability Area B POC:
Effluents Meeting Area Phone Call back #:1644 C. Accountability Area C POC:
Warehouse, LCR Phone Call back #:3186 D. Accountability Area D POC:
I&C Shop 1st Floor Phone Call back #:3713 2 story South Building E. Accountability Area E POC:
Cafeteria Conference Room Phone Call back #:1685 1 st Floor Three Story South Bldg F. Accountability Area F POC:
211 Conference Rm Phone Call back #:1211 2nd Floor Three Story South Bldg G. Accountability Area G POC:
TSC (Control Structure)
Phone Call back #:3045
- 6.
At 20 Minutes from start of Accountability A. Stop Accountability program in SSCS
- 1)
Run Accountability Report of SSCS
- a. "People in the Plant who have not logged into Accountability Area since Accountability Started"
- 2)
Print out a copy of the report
- a., Purge the Accountability Report - cross off names of personnel accounted for by Security, Operations, HP, and Chemistry.
EP-AD-000-385, Revision 13, Page 2 of 4
r~ I Tab 8 EP-PS-1 13-8 CHECK-OFF LIST TITLE: ACCOUNTABILITY ITEM CHECKED YES NO
- 3)
Prior to 30 minutes from the start of Accountability, report results to:
- a. TSC not activated or in control - Operations in the Control Room ext. 3907
- 7.
INITIATE A SECURITY ACCOUNTABILITY WITHOUT USING SSCS,.
A. DISPATCH SECURITY FORCE MEMBERS TO ACCOUNTABILITY AREA PICK-UP POINTS FOR ACCOUNTABILITY ROSTER COLLECTIONS B. Initiate an Accountability of Security Personnel C. Dispatched Security Force Members are required to have Personnel Accountability Areas and Leader Assignments, Attachment B, SP-00-309, in their possession at the Pick-Up points. Copies of Attachment B are located with Mobile #1
- 1)
PICK UP POINT #1 - S&A Building Lobby (Ext. 1624/3927)
- 2)
PICK UP POINT #2 - South Building - 1st Floor Conference Room (Ext.
1848)
- I CD.
'If tbelow listed workoupsdonot telephone their Accuntability results iito Secur within 15 mi'nute Sedurity isreqtuired to 6a11 the work group(s) and request thest tus of their eA tabilit
- 1)
TSC Sec. Coordinator, ext. 353-4931 - (if TSC activated)
- 2)
Operations - ext. 3907
- 3)
Health Physics - ext. 3371
- 4)
Chemistry - ext. 3389 EP-AD-000-385, Revision 13, Page 3 of 4
Tab 8 EP-PS-1 13-8 CHECK-OFF LIST TITLE: ACCOUNTABILITY ITEM CHECKED YES NO
- 8.
Prior to 30 minutes from the start of Accountability report results to:
A. TSC not activated or in control - Notify Operations in the Control Room ext.
3907
B. TSC activated and IN CONTROL - Notify the TSC Security Coordinator.
C. Fax the reports/lists of missing personnel to the TSC Security Coordinator (if TSC is activated) 8-1-570-759-4942 MISSING PERSONNEL WILL BE DETERMINED FROM ACCOUNTABILITY ROSTER(S) RECEIVED THAT HAVE PERSONNEL IDENTIFIED AS BEING UNACCOUNTED FOR.
NOTE: WHEN A ROSTER IS NOT RECEIVED FROM A GROUP, THAT GROUP WILL BE PRESUMED ACCOUNTED FOR OR NOT ON SITE.
- 9.
Once an individual(s) is confirmed missing the SCC/ASCC Controllers need to reference the "Search and Rescue' check-off list.
I -
EP-AD-000-385, Revision 13, Page 4 of 4