2 to Emergency Plan-Position Specific Procedure EP-PS-102, Technical Support Coordinator
ML031140482
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/17/2003
From:
Susquehanna
To:
Office of Nuclear Reactor Regulation
References
Download: ML031140482 (12)


Text

Apr. 17, 2003 Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-19466 USERS NFQRMATTIRN-GERLACH 0 M EMPL#:28401 CA#: 0363 Address: SA2 Phone#: 254- 94 TRANSMITTAL INFORMATION:

TO: GERLACH*ROSE M 04/17/2003 LOCATION: DOCUMENT CONTROL DESK FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:

102 - 102 - TECHNICAL SUPPORT COORDINATOR:

EMERGENCY PLAN- POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE: 08/26/2002 ADD MANUAL TABLE OF CONTENTS DATE: 04/16/2003 CATEGORY: PROCEDURES TYPE: EP ID: EP-PS-102 REMOVE: REV:21 ADD: REV: 22 UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

r CtNO

PROCEDURE COVER SHEET PPL SUSQUEHANNA, LLC I NUCLEAR DEPARTMENT PROCEDURE TECHNICAL SUPPORT COORDINATOR EP-PS-102 EMERGENCY PLAN-POSITION SPECIFIC PROCEDURE Revision 22 Page 1 of 4 QUALITY CLASSIFICATION: APPROVAL CLASSIFICATION:

( ) QA Program (X) Non-QA Program ( ) Plant a ( ) Non-Plant (X) Instruction .

EFFECTIVE DATE: '

PERIODIC REVIEW FREQUENCY: T 2 Years PERIODIC REVIEW DUE DATE: _________

RECOMMENDED REVIEWS: / KI Procedure Owner: Nuclear Emergency Planning Responsible Supervisor: Manager-NSE Responsible FUM: Supv.-Nuclear Emergency Planning Responsible Approver: General Manager-Plant Support FORM NDAP-QA-0002-1, Rev. 3, Page 1 of 1

EP-PS-1 02 Revision 22 Page 2 of 4 TECHNICAL SUPPORT Emergency Plan-Position Specific Procedure COORDINATOR:

WHEN: Technical Support Center (TSC) is activated HOW NOTIFIED: On-hours: Phone or Page Off-hours: Paged by Security REPORT TO: Damage Control Team Coordinator WHERE TO REPORT: TSC OVERALL DUTY:

Coordinate work of the Technical Staff Support Engineers, Chemistry Coordinator, and Data Technicians. Answer questions and solve problems posed by the Damage Control Team Coordinator, Ops Coordinator, and Emergency Director.

MAJOR TASKS: TAB: REVISION:

Upon arrival at the TSC, get updated on the TAB A 3 status of the plant and determine Technical Support requirements.

Review the current classification. TAB B 2 Coordinate problem-solving efforts. TAB C 4 Communicate technical information. TAB D 4 Organize technical, chemical, and engineering TAB E 4 support in the TSC Library.

Make sure information and functions that are TAB F 1 in progress during shift relief are turned over smoothly.

Close out your function when emergency is TABG 2 terminated.

Determine if RB HVAC can be restarted. TAB H 5 Determine if fuel pool boiling can be expected TAB I 3 and initiate actions as necessary to prevent fuel pool boiling or to mitigate the consequences of fuel pool boiling.

EP-PS-1 02 Revision 22 Page 3 of 4 MAJOR TASKS: - TAB: REVISION:

Monitor plant conditions to identify potential TAB J 6 long term operational impacts and/or recovery action.

Determine if ESW has been, or will be aligned TAB K 3 to supply cooling to RBCCW and/or TBCCW heat exchangers, and ensure that adequate cooling is provided for normal ESW heat loads.

EP-PS-1 02 Revision 22 Page 4 of 4 SUPPORTING INFORMATION: TAB:

Emergency Telephone Instructions TAB 1 Emergency Organization TAB 2 Logkeeping TAB 3 NERO Technical Support Overview TAB 4 Emergency Facility Form Flow TAB 5 Emergency Classification TAB 6 Intentionally Blank TAB 7 Emergency Forms TAB 8 Emergency Notification Report Anticipated Question List TAB 9 Public Protective Action Recommendation Guide TAB 10 General Electric BWR Emergency Support Program TAB 11 Instructions for RB HVAC Restart & Load Shed TAB 12

REFERENCES:

SSES Emergency Plan NUREG-0654, Planning Standards and Evaluation Criteria NUREG-0731, Guidelines for Utility Management Structure and Technical Resources, September 1980 EDR #G20020 Loss of Fuel Pool Cooling Event Evaluation

TAB H EP-PS-1 02-H Revision 5 Page 1 of 1 MAJOR TASK:

Determine if RB HVAC can be restarted to provide cooling to the Reactor Building or if electrical load must be shed to reduce heat load to the reactor building.

SPECIFIC TASKS: HOW:

1. Determine if Reactor Building Heating, 1a. Operators should restart RB-HVAC in Ventilation and Air Conditioning (RB accordance with applicable procedures.

HVAC) (including chilled water) can be restarted post accident.

NOTE: NOTE:

Restart of RB HVAC or The RB HVAC System cannot be Electrical Load Shed must be restarted if system integrity has initiated within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> been comprised by a seismic following the Secondary event. (Ref: ON-000-002)

Containment Isolation.

2. If you determine that RB HVAC 2a. Instruct Operations to shed electrical cannot be restarted, provide direction loads.

to Ops Coordinator to shed electrical loads. HELP Instructions for RB HVAC Restart and Load Shed See TAB 12

( ~(C Tab 2 EP-PS-1 02-2 EMERGENCY ORGANIZATION CONTROL ROOM EMERGENCY DIRECTOR (SHIFT MANAGER)

EMERGENCY PLAN SHIFT TECHNICAL OPERATORS COMMUNICATOR ADVISOR (STA)

EP-AD-000-406, Revision 15, Page 1 of 3

( ( (

Tab 2 EP-PS-1 02-2 TSC ORGANIZATION

  • EMERGENCY DIRECTOR
  • Operations Coordinator
  • Severe Accident Management Coordinator
  • Denotes minimum staffing.

Rev. 41, 03/03 Susquehanna Steam Electric Station Units I and 2 Emergency Plan TSC ORGANIZATION FIGURE 6 2 EP-AD-000-406, Revision 15, Page 2 of 3

( ( (

Tab 2 EP-PS-1 02-2 EOF ORGANIZATION

EP-AD-000-406, Revision 15, Page 3 of 3

Tab 12 EP-PS-1 02-12 PROCEDURE FLOWCHART ABNORMAL EVENT AND LOSS OF RB HVAC RB HVAC CAN BE RESTARTED IF:

1. Directed by EO-100(200)-104, Secondary Containment Control.

AND

2. Seismic event has not compromised RB HVAC system integrity.

AND

3. Offsite power is available.

CAN RB HVAC BE YES RESTORED? N INITIATE REACTOR RESTART RB HVAC BLDG LOAD SHED PER INSTRUCTION EP-AD-000-220, Revision 3, Page 1 of 3

Tab 12 EP-PS-1 02-12 INSTRUCTIONS FOR LOAD SHED CHECK:.

1. Initiate the load shed, as directed by EP-PS-102.

CAUTION:

The following systems will be lost:

- Normal RB Lighting (essential and emergency lighting not affected)

- Normal RB HVAC (including heaters)

- RB Chilled Water Pumps

- Reactor Water Cleanup Pumps

- Fuel Pool Cooling Pumps

- RB Steam Tunnel Fans

- RB LRW Sump Pumps

- Drywell Floor Drain Sump Pumps

- Various RB Cranes Actions to mitigate the consequences of the loss of these systems will be given by the TSC.

la. Referto ON-103(203)-001, ON-134(234)-001, and ON-135(235)-001 to

- determine effects of load shed.

1b. To initiate the load shed for Unit 1 only:

Trip the following breakers in the Turbine Building:

BREAKER# LOCATION 1A11-11 Unit 1 Lower Switchgear Room (El. 699'-0")

1A102-11 Unit 1 Lower Switchgear Room (El. 699'-O")

EP-AD-000-220, Revision 3, Page 2 of 3

Tab 12 EP-PS-1 02-12 INSTRUCTIONS FOR LOAD SHED CHECK:

M 1c. To initiate the load shed for Unit 2 only:

Trip the following breakers in the Turbine Building:

BREAKER# LOCATION 2A101-11 Unit 2 Lower Switchgear Room (El. 699-'-O) 2A102-11 Unit 2 Lower Switchgear Room (El. 699'-0k) 1d. Complete "Breaker Trip Checkoff Sheet For Load Shed" form.

EP-AD-000-220, Revision 3, Page 3 of 3