ML031140466

From kanterella
Jump to navigation Jump to search
Revision 16 to EP-PS-104, Radiation Protection Coordinator (Rpc): Emergency Plan-Position Specific Procedure.
ML031140466
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/17/2003
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML031140466 (8)


Text

Apr. 17, 2003 Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-19496 USER TNFORMAd<-

GER H* OSE M MPL#:28401 CA#: 0363 Addres Pho If: 254-3194 TRANSMITTAL INFORMATION:

TO: GERLAOIeRCJE n 04/17/2003 LOCATION: DOCUMENT CONTROL DESK FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER 3(NUCSA-2)

-'B-THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:

104 - 104 - RADIATION PROTECTION COORDINATOR (RPC):

EMERGENCY PLSN-POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE: 03/20/2003 ADD MANUAL TABLE OF CONTENTS DATE: 04/16/2003 CATEGORY: PROCEDURES TYPE: EP ID: EP-PS-104 REPLACE: REV:16 REPLACE: REV:16 REMOVE: PCAF 2003-1209 REV: N/A ADD: PCAF 2003-1209 REV: N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

K>Dq

( (

Tab 2 EP-PS-1 04-2 EMERGENCY ORGANIZATION CONTROL ROOM EMERGENCY DIRECTOR (SHIFT MANAGER) l EMERGENCY PLAN SHIFT TECHNICAL OPERATORS ADVISOR (STA)

COMMUNICATOR EP-AD-000-406, Revision 15, Page 1 of 3

(I ( (.

Tab 2 EP-PS-1 04-2 TSC ORGANIZATION

  • EMERGENCY DIRECTOR
  • Denotes minimum staffing.

Rev. 41, 03/03 Susquehanna Steam Electric Station Units 1 and 2 Emergency Plan TSC ORGANIZATION FIGURE 6.2 EP-AD-000-406, Revision 15, Page 2 of 3

( (s A Tab 2 EP-PS-1 04-2 EOF ORGANIZATION i

EP-AD-000-406, Revision 15, Page 3 of 3

Tab 11 EP-PS-1 04-11 EMERGENCY EXPOSURE EXTENSIONS EXTENSION APPROVAL ACTIONS FROM TO mrem mrem (TEDE) (TEDE) 4000 <25000 ED and RPC/RM and RSM ALL OF THE LISTED APPROVALS AND APPLY EMERGENCY EXPOSURE

.__ lCONSIDERATIONS

>25000 ED and RPC/RM and RSM ALL OF THE LISTED APPROVALS, APPLY EMERGENCY EXPOSURE CONSIDERATIONS AND BRIEFING ON l__ _RISKS EP-AD-000-121, Revision 3, Page 1 of 1

Tab 12 EP-PS-1 04-12 EMERGENCY EXPOSURE EXTENSION REQUEST DATE ____ / ____ I ___ TIME TEAM TYPE OF DOSE EXTENSION (/):

0 Extend to 25 Rem 0 Extend to Rem Approved by/date (RPC/DASU): /

Approved by/date (ED/RM): l Current Lifetime year, dose, dose, E-plan Name Soc Sec # Signature mrem mrem Function Signature of volunteer denotes an understanding and an awareness of the risks involved, including the numerical levels of dose at which acute effects of radiation will be incurred and numerical estimates of the risk of delayed effects.

EP-AD-000-135, Revision 6, Page 1 of 3

Tab 12 EP-PS-1 04-12 ALARA REVIEW Check /

A. PERSON-REM ESTIMATION

___ 1. Assess the number of workers 4. Assure all workers have essential, required. productive tasks.

2. Evaluate the use of fewer workers. 5. Assure workers have available exposure.
3. Investigate experience of workers 6. Evaluate criteria for emergency exposure.

selected.

B. PLANNING

1. Preplanning meeting with supervisors 4. Prefabrication considered.

and/or workers required. 5. Evaluate use of remote handling devises

2. Access to and exit from work are or other special tools.

planned. 6. Cold equipment "mockups", rehearsals, or

3. Evaluate staging/setup in accessible other practical exercise.

low dose rate area.

C. EXPOSURE REDUCTION CONTROLS

1. Evaluate need for timekeeping. 7. System or equipment to be drained and
2. Consider use of water bucket flushed.

shielding for carrying hot parts. 8. Assess exposure reduction by permitting

3. Consider use of shielded drums or decay of radiation sources during reactor lead pigs" for carrying hot parts. shutdown or system isolation.
4. Consider use of temporary shielding 9. Assess the need of communication such as lead wool blankets, lead devices such as head sets, TV cameras, sheets, or lead bricks. others.
5. Consider use of shadow shields 10. Assess practicality of removing utilizing a portable curtain shield. component from radiation area.
6. System or equipment to be filled with 11. Evaluate us6 of photographs of 'as water. installed equipment" to aid in worker briefings.

D. AIRBORNE/CONTAMINATION CONTROL

1. Assess need for respiratory protection 3. Assess necessity of area decon before usage against effectiveness of commencement of work.

engineering controls. 4. Containment structure (tent) required.

2. Assess individual's history of internal 5. Portable ventilation system required.

DAC-Hr exposure to airborne 6. Assess need for flooding or draining contamination. rooms.

7. Assess hot particle or fuel fragment migration.

Performed by EP-AD-000-1 35, Revision 6, Page 2 of 3

Tab 12 EP-PS-1 04-12 Provided below are the instructions on how to retrieve an individual's occupational exposure information.

1. Log into NIMS, go to RPDPERX screen.
2. Query the individual.
3. Click on DOSE SUMMARIES button.
4. The screen in Figure 1 will appear.
5. The individual's YEAR-TO-DATE (YTD) dose will be provided as 'NRC PERIOD EXPOSURE' for the current calendar year.

aid 1,flecord 2-uiry-tairnmPhts'" ~Window:

gfC-~ 4 1 13-1i~

-'Persohn T eF~

S- IMRISE 1J1395606~7 JSSNj~

-MARISA 5 1 Dose Suimenes  ;

3 X<SDENB X X 6i,:3SOEMm

'CDJ

- DDE >LDE5 SOEMEEDE. CEDE CCE TODE

'ITEDE>

-( 'mMP O4L'Type AK7 minrermlYiirbm) (mrem) J(mrem) (rem) 3(mrem) (mrem),,(mrem)5 ff fetime Exposure 52 52l 621 621 52 523=

, 'jLifetime Level . [ 1 _ 1 45000 [ _ _

Period Available NX2002INc 1Jj 20001 120001 400001 400001 I1 20001 2000! W I 2002fNRC Period Exposure S ° °lo[

l S' of 01 0 2 INRC Period Level .I 2000l 12000l 40000 40000 [ l 2000 2000 200 lnon SSES Exposure i[ _ 1 F ;_ -______

r 2002 SSES Exposure l °l ° [IJ ° 0

-- - --.... . . C. j- .....-.. . .  ;...

i7 3; > s 5 , Z i x;3 t F_ _> e S

8 w3S.2i Ee'.

vd4 vZ v<

- - ,  ? - - k1V.

- - 3 S

- l ,; ;, , I I Figure 1 EP-AD-000-135, Revision 6, Page 3 of 3