March 2003 Monthly Operating Report for Susquehanna, Units 1 & 2
ML031120337
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/07/2003
From: Richard Anderson
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-005614, R41-2A
Download: ML031120337 (7)


Text

i I I p I a I-

%% % a a

.4 If M

Richard L. Anderson Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570 542 3883 Fax 570 542 1504 RLAnderson~pplweb corn April 7, 2003 U. S Nuclear Regulatory Commission Attn: Document Control Desk Mail Station OP1-17 Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-3871NPF-14 and 50-388/NPF-22 PLA-005614 R41-2A The March 2003 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.

Very truly yours, Richard L. Anderson JJH/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. S. Hansell NRC Project Manager, Mr. R V. Guzman

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 04/07/2003 J. J. Hennings (570) 542-3747 OPERATING STATUS

1.

Unit Name:

Susquehanna Steam Electric Station (UW)

2.

Reporting Period:

March 2003

3.

Design Electrical Rating (Net MWe):

1115 4

Maximum Dependable Capacity (Net MWe):

1105

5.

Hours in Reporting Period

6.

Number of Hours Reactor Was Critical

7.

Hours Generator On-Line

8.

Unit Reserve Shutdown Hours

9.

Net Electrical Energy Generated (MWH)

This Month 744 744 744 0

827,869 Yr.-to-Date 2160 2160 2160 0

2,385,184 Cumulative 73,689 144,024.5 141,813.8 0

145,638,713 NOTES:

Page 1 of 1

UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 04/07/03 J. J. Hennings (570) 542-3747 REPORT MONTH March 2003 No.

Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 I

No Shutdowns this month.

Summary: On March 15, reactor power was reduced to 70% to perform a planned Control Rod Sequence Exchange. Full reactor power operation was resumed on March 16.

1.

F. Forced S. Scheduled 2.

Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction 3.

Method:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

Page 1 of 1

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:

50-387 Date:

04/07/03 Completed by:

J. J. Hennings Telephone:

(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 04/07103 J. J. Hennings (570) 542-3747 OPERATING STATUS

1.

Unit Name:

Susquehanna Steam Electric Station (U2)

2.

Reporting Period:

March 2003

3.

Design Electrical Rating (Net MWe):

1117

4.

Maximum Dependable Capacity (Net MWe):

1111

5.

Hours in Reporting Period

6.

Number of Hours Reactor Was Critical

7.

Hours Generator On-Line

8.

Unit Reserve Shutdown Hours

9.

Net Electrical Energy Generated (MWH)

This Month 744 168.55 168.02 0

151,217 Yr.-to-Date 2160 1584.6 1584.0 0

1,673,024 Cumulative 158,929 137,734.0 135,790.7 0

141,784,018 NOTES:

Page 1 of 1

UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 04/07/03 J. J. Hennings (570) 542-3747 REPORT MONTH March 2003 No.

Date Type Duration Reason Method of Cause & Corrective Action I

(Hours) 2 Shutting to Prevent Recurrence Down Reactor 3

1 3/8/03 S

575.45 C

2 Reactor Shutdown for planned Refueling outage on 3/8/03.

Summary: The core reached the end of its full power capability for fuel cycle 11 on 1/24/03. The reactor coasted down to 82% on March 7. A planned manual scram was inserted on March 8 from less than 20% power for the Unit 2 Cycle 11 Refueling Outage.

1.

2.

3.

F. Forced S. Scheduled Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction Method:

I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

Page 1 of 1

SUSOUEHANNA STEAM ELECTRIC STATION Docket Number:

50-388 Date:

04/07/03 Completed by: J. J. Hennings Telephone:

(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.