ML031120337
| ML031120337 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 04/07/2003 |
| From: | Richard Anderson Susquehanna |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| PLA-005614, R41-2A | |
| Download: ML031120337 (7) | |
Text
i I I p I a I-
%% % a a
.4 If M
Richard L. Anderson Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570 542 3883 Fax 570 542 1504 RLAnderson~pplweb corn April 7, 2003 U. S Nuclear Regulatory Commission Attn: Document Control Desk Mail Station OP1-17 Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-3871NPF-14 and 50-388/NPF-22 PLA-005614 R41-2A The March 2003 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.
Very truly yours, Richard L. Anderson JJH/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. S. Hansell NRC Project Manager, Mr. R V. Guzman
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 04/07/2003 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 1.
Unit Name:
Susquehanna Steam Electric Station (UW)
- 2.
Reporting Period:
March 2003
- 3.
Design Electrical Rating (Net MWe):
1115 4
Maximum Dependable Capacity (Net MWe):
1105
- 5.
Hours in Reporting Period
- 6.
Number of Hours Reactor Was Critical
- 7.
Hours Generator On-Line
- 8.
Unit Reserve Shutdown Hours
- 9.
Net Electrical Energy Generated (MWH)
This Month 744 744 744 0
827,869 Yr.-to-Date 2160 2160 2160 0
2,385,184 Cumulative 73,689 144,024.5 141,813.8 0
145,638,713 NOTES:
Page 1 of 1
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 04/07/03 J. J. Hennings (570) 542-3747 REPORT MONTH March 2003 No.
Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 I
No Shutdowns this month.
Summary: On March 15, reactor power was reduced to 70% to perform a planned Control Rod Sequence Exchange. Full reactor power operation was resumed on March 16.
1.
F. Forced S. Scheduled 2.
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction 3.
Method:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Page 1 of 1
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-387 Date:
04/07/03 Completed by:
J. J. Hennings Telephone:
(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 04/07103 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 1.
Unit Name:
Susquehanna Steam Electric Station (U2)
- 2.
Reporting Period:
March 2003
- 3.
Design Electrical Rating (Net MWe):
1117
- 4.
Maximum Dependable Capacity (Net MWe):
1111
- 5.
Hours in Reporting Period
- 6.
Number of Hours Reactor Was Critical
- 7.
Hours Generator On-Line
- 8.
Unit Reserve Shutdown Hours
- 9.
Net Electrical Energy Generated (MWH)
This Month 744 168.55 168.02 0
151,217 Yr.-to-Date 2160 1584.6 1584.0 0
1,673,024 Cumulative 158,929 137,734.0 135,790.7 0
141,784,018 NOTES:
Page 1 of 1
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 04/07/03 J. J. Hennings (570) 542-3747 REPORT MONTH March 2003 No.
Date Type Duration Reason Method of Cause & Corrective Action I
(Hours) 2 Shutting to Prevent Recurrence Down Reactor 3
1 3/8/03 S
575.45 C
2 Reactor Shutdown for planned Refueling outage on 3/8/03.
Summary: The core reached the end of its full power capability for fuel cycle 11 on 1/24/03. The reactor coasted down to 82% on March 7. A planned manual scram was inserted on March 8 from less than 20% power for the Unit 2 Cycle 11 Refueling Outage.
1.
2.
3.
F. Forced S. Scheduled Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction Method:
I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Page 1 of 1
SUSOUEHANNA STEAM ELECTRIC STATION Docket Number:
50-388 Date:
04/07/03 Completed by: J. J. Hennings Telephone:
(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.