E-mail from J. Hixon to D. Dawes, Regarding Besse Head Cladding
ML031110381
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/11/2002
From: Hixon J
Materials Engineering Branch
To: Dawes D
McDermott
References
FOIA/PA-2003-0018
Download: ML031110381 (1)


Text

I William Cullen - Besse head cladding .age From: Jeffrey Hixon / ' a To: Dhdawes mcdermott.com Date: Friday, October 11, 2002 5:16PM

Subject:

Besse head cladding Dave, Quick question: Roughly how big would the manual SMAW center section of the Besse head cladding be?

6", 1', 2'... diameter.

Nozzle three (the cavity is adjacent to nozzle 3 on the downhill side) may be on the border of where the 6-wire ends and the SMAW cladding begins. The center of Nozzle three is 12.15" from top dead center of the head. The diameter of the nozzle is 4". The cracking in cladding starts at about 2" from the OD of nozzle 3.

In other words, the cracking in the cladding in the cavity is about 16.15" from top dead center. Could this region be included in the SMAW cladding?

I would appreciate any input you could give.

Jeff Hixon U.S. Nuclear Regulatory Commission Office of Research/DET/MEB Welding Engineer - Nuclear Safety Intern Location: T10-E16 Mail Stop: T1 O-E10 Phone: (301) 415-0256 Fax: (301) 415-5074