Revisions to Confirmatory Action Letter Cooper Nuclear Station
ML031000740
Person / Time
Site: Cooper Entergy icon.png
Issue date: 03/14/2003
From: Coyle M
Nebraska Public Power District (NPPD)
To: Merschoff E
NRC Region 4
References
Download: ML031000740 (3)


Text

......

EN Nebraska Public Power District Nebraska's Energy Leader NLS2003017 March 14,2003 MAR 17 20 Ellis Merschoff Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-4005

Dear Mr. Merschoff:

Subject:

Revisions to Confirmatory Action Letter Cooper Nuclear Station, NRC Docket 50-298, DPR-46

References:

1. Letter to Clay C. Warren (Nebraska Public Power District) from Ellis W.

Merschoff (Nuclear Regulatory Commission), dated January 30, 2003, "Confirmatory Action Letter."

The purpose of this letter is to document revisions to the Confirmatory Action Letter (CAL) in Reference 1. In a phone conversation held March 5, 2003 between Kriss Kennedy, Chief, Branch F, Nuclear Regulatory Commission and Paul Fleming, Manager, Licensing and Regulatory Affairs, Nebraska Public Power District, the details of the revision were discussed. The revision was planned before publication of the CAL on January 30, 2003, but the CAL was issued before this revision could be incorporated into that document.

The revision concerns Action Plan 5.2.1.2, "Operability Determinations." The CAL currently includes Steps 1-9 of this Action Plan. The revised CAL should include Steps 1-10 of that Plan.

Since completion of Step 7 is scheduled for the third quarter of 2004, only the start and continued progress of activities in that step should be addressed as part of the CAL.

In the revision, Step 7 has been expanded to include a longer term monitoring function for the interim operability determination oversight group. Step 10 was added to the CAL to assure improvement in operability determination consistency and quality by those charged with performing the activity.

Cooper Nuclear Station P.O. Box 98/Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 http://www.nppd.com

NLS200301 7 Page 2 of 2 Should you have any questions concerning this matter, please contact me at telephone no. (402) 825-2770.

Michael T. Coyle Site Vice President

/jrs cc: U.S. Nuclear Regulatory Commission Att: Document Control Desk Washington, D.C. 20555-0001 Senior Project Manager USNRC - NRR Project Directorate IV-1 Senior Resident Inspector USNRC NPG distribution Records

I ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS Correspondence Number: NLS2003017 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the Licensing and Regulatory Affairs Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE Short-term improvements addressing the quality of Operability Determinations - Action Plan 5.2.1.2, improve the 1Q04 operations and shift review of OD's, provide a core group of engineering and operations personnel to perform and review OD's and improve the use of CAP data, Action Steps 1-10.

The start and continued progress of activities in Step 7 of 1Q04 Action Plan 5.2.1.2 will be implemented as scheduled.

I i

i i

PROCEDURE 0.42

}

REVISION 12 l

PAGE 13 OF 16