MONTHYEARML24296A0652024-10-22022 October 2024 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - Verbal Authorization of Relief Request for the Proposed Alternative ANO2-RR-24-001 ML24227A0072024-08-13013 August 2024 NRR E-mail Capture - LIC-109 Acceptance - ANO 2 - Proposed Alternative for Implementation of Extended Reactor Vessel In-Service Inspection Interval (ANO2-ISI-24-02) - EPID L-2024-LLR-0048 ML24218A0652024-08-0202 August 2024 NRR E-mail Capture - LIC-109 Acceptance Review - Arkansas Nuclear One, Unit 1 - License Amendment Request - Request for Review and Approval Changes to SAR and to a Confirmatory Order - Pzr Htr Emergency Power Supply - EPID L-2024-LLA-0092 ML24180A0022024-06-26026 June 2024 NRR E-mail Capture - LIC-109 Acceptance - ANO 1 and 2 - Proposed Alternatives for Examinations of SG Pressure Retaining Welds and Full Penetrations Nozzles - EPID L-2024-LLR-0038 ML24149A3672024-05-28028 May 2024 August 2024 Emergency Preparedness Exercise Inspection - Request for Information ML24117A0262024-04-26026 April 2024 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action License Amendment Request to Revise Typographical Errors in Technical Specifications ML24088A0082024-03-27027 March 2024 NRR E-mail Capture - ANO-2 -- TSTF-505 Post-Audit Final RAI (L-2023-LLA-0052) ML23269A0232023-09-22022 September 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - TSTF-505 Audit Questions ML23240A3412023-08-28028 August 2023 NRR E-mail Capture - ANO-2, Grand Gulf, and River Bend - Acceptance Review of LAR Revising TSs to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23194A1752023-07-13013 July 2023 NRR E-mail Capture - ANO-1 - Acceptance Review of Alternative Request ANO1-ISI-037 ML23187A0432023-07-0303 July 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Agenda ML23166A0132023-06-14014 June 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Questions ML23130A2752023-05-10010 May 2023 NRR E-mail Capture - ANO Unit 2- Acceptance of Requested Licensing Action LAR to Adopt TSTF-505 Revision 2 ML23118A0692023-04-28028 April 2023 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to Modify ANO-1 TS 3.3.1, Reactor Protection System Instrumentation (L-2023-LLA-0048) ML23104A1052023-03-10010 March 2023 NRR E-mail Capture - ANO-2 Final RAI Alternative Request for Life-of-Repair of RVCH Pen. 46 ML23072A3672023-03-0909 March 2023 NRR E-mail Capture - Entergy Fleet - Acceptance Review of Quality Assurance Program Manual Reduction in Commitment ML23039A0872023-02-0808 February 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - Acceptance Review of Relief Request ANO2-RR-23-001, Half-Nozzle Repair of RVCH Penetration 46 (L-2023-LLR-0000) ML23026A1322023-01-26026 January 2023 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to Adopt TSTF-505 Revision 2 ML22354A0122022-12-19019 December 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Acceptance Review of Request for Alternative ANO-CISI-002 Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (L-2022-LLR-0080) ML22349A0112022-12-14014 December 2022 NRR E-mail Capture - Final RAI Relief Request ANO1-ISI-035 ML22341A1202022-12-0707 December 2022 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation (L-2022-LLA-0161) ML22273A0982022-09-30030 September 2022 NRR E-mail Capture - ANO Units 1 and 2 - Acceptance of Requested Licensing Action Emergency Plan Staffing Requirements ML22265A2012022-09-22022 September 2022 NRR E-mail Capture - ANO-1 - Acceptance Review of Relief Request ANO1-ISI-036 ML22188A1782022-07-0707 July 2022 NRR E-mail Capture - ANO-1 - Acceptance Review of Relief Request ANO1-ISI-035 ML22174A1362022-06-23023 June 2022 NRR E-mail Capture - ANO-2 Final RAI Relief Requests ANO2-ISI-023 Through -028 (EPIDs L-2022-LLR-0022 Through -0027) ML22151A3262022-05-31031 May 2022 August 2022 Emergency Preparedness Exercise Inspection - Request for Information ML22124A2452022-05-0404 May 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI 2 License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22108A1642022-04-18018 April 2022 NRR E-mail Capture - ANO-1: Final RAI License Amendment Request Concerning TS Changes Due to Revised Dose Calculations (L-2021-LLA-0181) ML22081A3902022-03-22022 March 2022 NRR E-mail Capture - ANO-2 - Acceptance Review of Relief Requests ANO2-ISI-023, -024, -025, -026, -027, and -028 (Epids: L-2022-LLR-022, -023, -024, -025, -026, and -027) ML22034A5482022-02-0303 February 2022 NRR E-mail Capture - Final RAI License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22020A0822022-01-19019 January 2022 NRR E-mail Capture - ANO-1 and 2 - Final RAI 2 License Amendment Requests to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML22020A0742022-01-13013 January 2022 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action Alternative ANO2-PT-003 ML21314A1212021-11-0909 November 2021 Verbal Authorization of Relief Request ANO2-RR-21-002 ML21312A0382021-11-0505 November 2021 NRR E-mail Capture - ANO-2 RAI Relief Request ANO2-RR-21-002 ML21312A4792021-11-0505 November 2021 Email: NRC Staff Preliminary Questions Regarding X Energy LLC Xe-100 Topical Report: Risk-Informed Performance-Based Licensing Basis Development ML21308A5602021-11-0404 November 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, Grand Gulf, River Bend, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML21292A0112021-10-18018 October 2021 NRR E-mail Capture - ANO, 1 and 2, Grand Gulf, River Bend, Waterford, 3 - Acceptance Review of LAR to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21287A1692021-10-13013 October 2021 Record of 10-13-21 Verbal Authorization of ANO2-R&R-012 (L-2021-LLR-0082) ML21298A1562021-10-11011 October 2021 NRR E-mail Capture - ANO-2 Final RAI Relief Request ANO2-R&R-012 Concerning Rv Closure Head Penetration 46 ML21273A0672021-09-29029 September 2021 NRR E-mail Capture - ANO-2 Final RAI 2 License Amendment Request to Adopt a Safety Function Determination Program ML21238A3742021-08-23023 August 2021 RFI Email - Cyber PI&R Inspection (ANO) ML21252A0052021-08-20020 August 2021 NRR E-mail Capture - ANO-1 and 2 Final RAI License Amendment Request to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML21217A3302021-08-0505 August 2021 (ANO) Problem Identification and Resolution (PIR) Request for Information Combined ML21202A1662021-07-20020 July 2021 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action Alternative ANO2-PT-003 ML21201A0062021-07-19019 July 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21197A0372021-07-16016 July 2021 NRR E-mail Capture - ANO-1 and 2 - Final RAI Final Response to GL 2004-02 ML21179A0052021-06-25025 June 2021 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action License Amendment Request to Adopt 10 CFR 50.69 ML21179A0042021-06-25025 June 2021 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action License Amendment Request to Adopt 10 CFR 50.69 ML21174A0342021-06-22022 June 2021 NRR E-mail Capture - Entergy Fleet (ANO, Ggulf, Rbend, & Waterford) - Acceptance Review for Relief Request to Use a Provision of a Later Edition of the ASME Code, Section XI for Periodic System Pressure Tests Exemptions ML21116A1092021-04-26026 April 2021 NRR E-mail Capture - ANO-1 and ANO-2: Final Supplemental RAI Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of ECP Supply Piping 2024-08-02
[Table view] |
Text
--- ..... t I Michelle Honcharik - RAI ON INCREASE IN HANDLING HEAVY LOADS FOR SPENT FUEL CRANE no-Page I i a
From: Michelle Honcharik To: SBENNE2@entergy.com Date: 3/10/03 9.54AM
Subject:
RAI ON INCREASE IN HANDLING HEAVY LOADS FOR SPENT FUEL CRANE Steve, See the attached.
Michelle Honcharik NRR/DLPM/PDIV-1 415-1774 CC: Thomas Alexion
I Michelle HonchanK - KAI spent Tuei crane.wpa Page 1 Il
_~isetrnicaewa i-ocai _vcnu REQUEST FOR ADDITIONAL INFORMATION RE: EXIGENT AMENDMENT REQUEST FOR INCREASE IN HANDLING HEAVY LOADS FOR SPENT FUEL CRANE ARKANSAS NUCLEAR ONE, UNITS 1 AND 2
- 1. Methodologies from two different standards have been used for computing the vertical and horizontal impact loads. (CMAA Specification No. 70 methodology for the vertical impact load and ACI 318-89 standard for the horizontal impact load ) Provide the rationale and justification for using two different standards for determining impact loads
- 2. Provide calculations to support the statement in Attachment 6 of the amendment request that, "The period of oscillation of the lifted load in pendulum motion during a seismic event is long Therefore, the horizontal seismic effect due to lifted load is very small and will be neglected." In the case when loads are lifted to higher elevations, it seems feasible that the period of oscillation in pendulum motion could interact with the motion of the crane and support structure during a seismic event.
- 3. The calculations to evaluate the adequacy of the bent frame and the columns to the upgraded crane loads indicate that the OBE seismic load case has not been evaluated.
Since the allowable limits for the OBE seismic load case are more restrictive than the DBE loading case, we request that you demonstrate compliance with your design code limits for the OBE condition as well. The interaction coefficient for the DBE case relating to the girder in Unit 1 is slightly greater than one. Compliance for this case needs to be demonstrated.
- 4. The analysis of the frame structure and columns for the revised crane loads in Section 8.0 of Attachment 6, indicates that only the following loading combinations will be evaluated:
- 1. DL+LL+IL+WL (with AISC allowable)
- 2. DL+LL+DBE (with 1.5 times AISC allowables not to exceed 0 9 Fy)
Please define the acronyms in the above equations. You also stated that the crane will not be used to lift the maximum load during plant operation. Discuss the lifted loads and provide their magnitude for the evaluation of the frame structure considering the above loading combinations.
- 5. Provide confirmation that the loading combinations and allowables used in the revised analysis with the upgraded loads are in compliance with the requirements in the UFSAR for the normal/upset, emergency and faulted loading conditions. If deviations from the UFSAR requirements exist, discuss the nature of the deviation and provide justification for noncompliance.
- 6. In response to RG 1.104, position C.1.d, you state in Attachment 4 to the amendment request that the weld geometries used in the existing bridge structure are not considered susceptible to lamellar tearing. Describe the screening criteria used to make this determination
- 7. In response to RG 1.104, positions C.1.b(3), C.1.b(4), C.4.d, and C.3.1, you state in Attachment 4 to the license amendment request, that a commercial grade dedication plan and various nondestructive testing will be implemented. Describe the current status of implementation and available results of nondestructive examinations and fatigue life evaluations
Page Page III IC-ATEMPGVV}00001'.TMP-I C:\TEMP\GWIOOOO1 .TMP Mail Envelope Properties (3E6CA725.673 :11: 19583)
Subject:
RAI ON INCREASE IN HANDLING HEAVY LOADS FOR SPENT FUEL CRANE Creation Date: 3/10/03 9:54AM From: Michelle Honcharik Created By: MCH3@nrc.gov I Recipients Action Date & Time entergy.com Transferred 03/10/03 09:54AM SBENNE2 (SBENNE2),entergy.com) nrc.gov owf4_po.OWFNDO Delivered 03/10/03 09:54AM TWA CC (Thomas Alexion)
Post Office Delivered Route entergy.com owf4_po.OWFNDO 03/10/03 09:54AM nrc.gov Files Size Date & Time RAI spent fuel crane.wpd 7418 03/10/03 09:50AM MESSAGE 859 03/10/03 09:54AM Options Auto Delete: INo Expiration Date: 1None Notify Recipients: Yes Priority: L Standard Reply Requested: INo Return Notification:
Send Notification when Opened Concealed
Subject:
INo Security: Standard To Be Delivered: I Immediate Status Tracking: I)elivered & Opened