|
---|
Category:Meeting Summary
MONTHYEARML24177A1892024-06-28028 June 2024 Summary of Information Meeting with Question and Answer Session to Discuss the 2023 Annual Assessment of Safety Performance at Columbia Generating Station ML24142A4982024-05-22022 May 2024 Summary of April 17, 2024, Partially Closed Pre-Application Meeting with Energy Northwest Regarding an Extended Power Uprate Combined with Maximum Load Line Limit Analysis Plus for Columbia Generating Station ML23297A2642023-11-0606 November 2023 October 5, 2023, Summary of Teleconference with Energy Northwest Regarding Proposed License Amendment Request to Revise the Emergency Plan for Columbia Generating Station ML23156A2822023-06-0505 June 2023 Summary of Meeting with Q & a Session to Discuss the 2022 Annual Assessment of Safety Performance at CGS ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22067A1832022-03-10010 March 2022 Summary of Energy Northwest Regulatory Conference Columbia Generating Station, Airborne Radioactivity Event Resulting in Preliminary White Finding, March 1, 2022 ML21321A0422021-12-13013 December 2021 Summary of October 22, 2021, Teleconference Meeting with Energy Northwest Regarding Proposed License Amendment Requests to Adopt Technical Specifications Task Force (TSTF)-505, and 10 CFR 50.69 Categorization Program ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21112A3512021-05-0303 May 2021 Summary of March 31, 2021, Pre-Application Teleconference with Energy Northwest to Discuss a Planned LAR Deletion of Certain License Conditions Relating to License Renewal Commitments for Columbia Generating Station ML20322A0362020-11-19019 November 2020 Summary of October 19, 2020, Presubmittal Teleconference with Energy Northwest Regarding Proposed COVID-19 Related Biennial Emergency Preparedness Exercise Exemption Request for Columbia Generating Station ML20314A0462020-11-0909 November 2020 Summary of November 4, 2020, NRC-NMFS Teleconference on Columbia Entrainment Study ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML20101L5352020-04-14014 April 2020 Summary of April 6, 2020, Presubmittal Teleconference Meeting with Energy Northwest, to Discuss a Technical Specification Change License Amendment Request for the Columbia Generating Station ML19030A2152019-02-12012 February 2019 1/24/19, Summary of Presubmittal Teleconference Meeting with Energy Northwest, to Discuss a Shield Wall Deferral License Amendment Request for the Columbia Generating Station ML19030A3192019-02-12012 February 2019 1/17/2019, Summary of Presubmittal Meeting with Energy Northwest, to Discuss an Emergency Control Room Chiller License Amendment Request at Columbia Generating Station ML18354B0992019-01-0303 January 2019 Summary of Pre-Submittal Meeting with Energy Northwest, to Discuss an Emergency Control Room Chiller License Amendment Request for the Columbia Generating Station ML16266A3712016-09-29029 September 2016 Summary of Public Meeting with Energy Northwest to Discuss Upcoming License Amendment Request Regarding Change in Completion Time for Residual Heat Removal Pump a Repair for Columbia Generating Station ML16167A4602016-08-23023 August 2016 Summary of Closed Meeting with Representatives of the Us Army Corps of Engineers, Bureau of Reclamation, and Energy Northwest to Discuss the Flood Analysis Associated with Columbia Generating Station ML16193A0162016-07-14014 July 2016 Summary of 6/30/16 Prelicensing Meeting with Energy Northwest to Discuss License Amendment Request to Revise Emergency Action Levels Based on Nuclear Energy Institute (NEI) 99-01, Revision 6 at Columbia Generating Station ML16138A3762016-05-25025 May 2016 Summary of 5/3/2016 Prelicensing Meeting with Energy Northwest to Discuss License Amendment Request Regarding Emergency Control Room Chiller System at Columbia Generating Station ML16138A3292016-05-24024 May 2016 Summary of 5/2/2016 Prelicensing Meeting with Energy Northwest to Discuss Measurement Uncertainty Recapture Power Uprate License Amendment Request at Columbia Generating Station ML16126A4822016-05-17017 May 2016 Summary of Prelicensing Meeting with Energy Northwest to Discuss License Amendment Request Concerning Portional Reclassification of Reactor Water Cleanup System at Columbia Generating Station ML16138A1682016-05-0202 May 2016 Licensee Presentation Regarding Mur Power Uprate for Columbia Generating Station, Pending LAR ML15187A4442015-07-0606 July 2015 Summary of a Regulatory Conference to Discuss the Safety Significance of a Columbia Finding Emergency Plan Implementing Procedures Did Not Implement Some Protective Action Recommendations Required by the Emergency Plan ML15173A2732015-06-30030 June 2015 Summary of June 4, 2015, Category 1 Public Meeting with Energy Northwest to Discussion Columbia Generating Station Seismic Hazard Reevaluation Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1, ML15069A5162015-03-17017 March 2015 2/24/2014 Summary of Presubmittal Meeting with Energy Northwest to Discuss Relief Request for Radwaste Cleanup Piping for Columbia Generating Station ML14168A0452014-07-0808 July 2014 Summary of 6/10/14 Closed Meeting Between U.S. Army Corps of Engineers, U.S. Dept of Interior Bureau of Reclamation, and Energy Northwest to Discuss Flooding Analysis for Columbia Generating Station ML13339B1452013-12-0505 December 2013 Meeting Summary for Public Meeting with Energy Northwest Regarding Columbia Generating Station ML12306A3332012-11-16016 November 2012 Summary of 10/18/12 Pre-licensing Meeting to Discuss Future License Amendment Request to Address Impacts of Remediation Activities Undertaken by Department of Energy in the Owner-Controlled Area at Columbia Generating Station ML12293A0592012-10-18018 October 2012 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance Improvement Initiatives ML12157A2722012-06-11011 June 2012 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a ML1201201102012-01-12012 January 2012 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance Improvement Initiatives ML11350A0562011-12-21021 December 2011 12/15/11, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Metal Fatigue and Operating Experience Open Items in the Columbia License Renewal Safety Evaluation Repo ML11339A0872011-12-12012 December 2011 Summary of Telephone Conference Call Held on November 28, 2011, Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Upper Shelf Energy Open Item in the Columbia License Renewal Safety Evaluation Report with O ML11339A0852011-12-12012 December 2011 November 8, 2011, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Metal Fatigue Open Item in the Columbia License Renewal Safety Evaluation Report with Open Items ML11336A1502011-12-12012 December 2011 Summary of Telephone Conference Call Held on November 14, 2011, Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Metal Fatigue Open Item in the Columbia License Renewal Safety Evaluation Report with Open I ML11249A0132011-11-21021 November 2011 08/29/2011-Summary of Tele Conf Call Between the USNRC and Energy Northwest, Concerning the Response to the Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Application ML11311A2662011-11-10010 November 2011 Summary of Tele Conf Call Held on 11/2/11, Between the USNRC and Energy Northwest, Concerning the Core Plate Hold-Down Bolts Open Item in the Columbia License Renewal Safety Evaluation with Open Items ML11305A1762011-11-0303 November 2011 Summary of Tele Conf Call Held on 10/27/11, Between the USNRC and Energy Northwest, Concerning the Metal Fatigue Open Item in the Columbia License Renewal Safety Evaluation with Open Items ML11291A0792011-11-0101 November 2011 09/27/2011 Summary of Public Meetings Conducted to Discuss the Dseis Related to the Review of the Columbia Generating Station License Renewal Application (Tac No. ME3121) ML11273A0012011-10-0404 October 2011 Summary of Teleconf Call Held on Sept. 28, 2011, Between the USNRC and Energy Northwest, Concerning the Draft Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Application ML11273A0662011-10-0404 October 2011 Summary of the Telephone Conference Call Held on September 29, 2011, Concerning the Inspection Report Pertaining to the Columbia Generating Station, License Renewal Application ML11256A3002011-09-23023 September 2011 Summary of Telephone Conference Call Held on September 12, 2011, Concerning the Draft Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Application ML11238A1582011-09-14014 September 2011 8/25/11 - Summary of Telephone Conference Call Between NRC and Energy Northwest Concerning Drais Pertaining to the SAMA Review of the Columbia Generating Station License Renewal Application ML11250A0152011-09-0808 September 2011 Summary of Tele Conf Call Held on August 22, 2011, Btw the USNRC and Energy Northwest, Concerning Topics Pertaining to the Columbia Generating Station, License Renewal Application ML11223A3512011-08-23023 August 2011 Summary of Telephone Conference Call Held on August 11, 2011, Between the NRC and Energy Northwest, Concerning the Response to the Request for Additional Information Pertaining to the Columbia Generation Station, LRA ML11230B0892011-08-23023 August 2011 August 17, 2011, Summary of Conference Call Held, Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Response to the Request for Additional Information Pertaining to the Columbia Generating Station, LRA ML11216A2532011-08-11011 August 2011 August 3, 2011, Summary of Telephone Conference Call Held Between the NRC and Energy Northwest, Concerning the Response to the Request for Additional Information Pertaining to the Columbia Generating Station, LRA ML11217A0222011-08-11011 August 2011 8/3-4/11, Summary of Telephone Conference Call Held Between Nuclear Regulatory Commission and Energy Northwest, Concerning the Response to the Request for Additional Information Pertaining to the Columbia Generating Station, LRA ML11220A0102011-08-11011 August 2011 February 3, 2011, Summary of Telephone Conference Call Held Between NRC and Energy Northwest, Concerning the Responses to the RAI Pertaining to the Columbia Generating Station, LRA 2024-06-28
[Table view] |
Text
April 7, 2003 LICENSEE: Energy Northwest FACILITY: Columbia Generating Station
SUBJECT:
SUMMARY
OF MEETING HELD ON APRIL 1, 2003, REGARDING RECENT STATION PERFORMANCE ISSUES AND ALTERNATE SOURCE TERM (AST)
SUBMITTAL PROGRESS On April 1, 2003, representatives of Energy Northwest met with the NRC staff to discuss recent station performance issues and AST submittal progress. The discussion covered responses to recent Davis-Besse lessons learned, the accuracy and completeness of submittals to the NRC, preliminary findings by the licensees evaluation team regarding the AST submittal, and future submittals to the NRC.
Energy Northwest gave an overview of how they were addressing the Davis-Besse issues, to include the development of a review team that identifies, reviews, screens and evaluates abnormal conditions. Energy Northwest also explained their integration of the Institute of Nuclear Power Operations guidance into existing audit programs. The discussion continued with the AST submittal root cause evaluation. The staff emphasized that it was important to show results from the lessons-learned and to provide a quality product. Finally, Energy Northwest discussed station successes.
Energy Northwest thanked the staff for their recommendations and the opportunity to discuss the AST resubmittal. At the conclusion of the meeting, the staff expressed their appreciation to Energy Northwest. An attendance list is provided in the attachment. The slides used during the meeting are available in ADAMS under accession number ML030910242.
/RA/
Brian J. Benney, Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-397
Attachment:
Meeting Attendees cc w/att: See next page
ML030970484 NRC-001 OFFICE PDIV-2/PM PDIV-2/LA PDIV-2/SC NAME BBenney EPeyton SDembek DATE 4/7/03 4/7/03 4/7/03 DOCUMENT NAME: G:\PDIV-2\Columbia Generating\Mtg Summary 4-1.wpd MEETING ATTENDEES MEETING WITH ENERGY NORTHWEST REGARDING RECENT STATION PERFORMANCE ISSUES AND ALTERNATE SOURCE TERM SUBMITTAL PROGRESS APRIL 1, 2003 ENERGY NORTHWEST Dale Atkinson Doug Coleman Mike Humphreys NRC Stephen Dembek Brian Benney Herb Berkow Leta Brown Mark Blumberg Rich Lobel Jim Bongarra Peter Hearn
Columbia Generating Station cc:
Mr. Greg O. Smith (Mail Drop PE04) Mr. Rodney L. Webring (Mail Drop PE08)
Vice President, Generation Vice President, Operations Support/PIO Energy Northwest Energy Northwest P.O. Box 968 P.O. Box 968 Richland, WA 99352-0968 Richland, WA 99352-0968 Mr. Albert E. Mouncer (Mail Drop 1396) Thomas C. Poindexter, Esq.
Vice President, Chief Counsel Winston & Strawn Energy Northwest 1400 L Street, N.W.
P.O. Box 968 Washington, DC 20005-3502 Richland, WA 99352-0968 Mr. Bob Nichols Chairman Executive Policy Division Energy Facility Site Evaluation Council Office of the Governor P.O. Box 43172 P.O. Box 43113 Olympia, WA 98504-3172 Olympia, WA 98504-3113 Mr. D. W. Coleman (Mail Drop PE20) Ms. Lynn Albin Manager, Performance Assessment Washington State Department of Health and Regulatory Programs P.O. Box 7827 Energy Northwest Olympia, WA 98504-7827 P.O. Box 968 Richland, WA 99352-0968 Mr. J. V. Parrish Chief Executive Officer Ms. Christine Perino (Mail Drop PE20) Energy Northwest Manager, Licensing P.O. Box 968 (Mail Drop 1023)
Energy Northwest Richland, WA 99352-0968 P.O. Box 968 Richland, WA 99352-0968 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Chairman Benton County Board of Commissioners P.O. Box 69 Prosser, WA 99350-0190 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 69 Richland, WA 99352-0069