Miscellaneous Correspondence for the Fermi Initial Examination - March 2003
ML030970242
Person / Time
Site: Fermi 
(NPF-043)
Issue date: 03/10/2003
From: O'Connor W
Detroit Edison
To:
Office of Nuclear Reactor Regulation
References
50-341/03-301 50-341/03-301
Download: ML030970242 (14)


Text

MISCELLANEOUS CORRESPONDENCE FOR THE FERMI INITIAL EXAMINATION - MARCH 2003

William T. O'Connor, Jr.

Vice President, Nuclear Generation Ks

( b, c~

Fermi 2 6400) North Dixie Hwy., Newport, Michigan 481366 Tel: 734.686.6201 Fax: 734.686.4172 October 13, 2000 NRC-00-0089 Detroit Edison A DTE1.nergy Company D~

Regional Administrator Region III U.S. Nuclear Regulatory Commission 801 Warrenville Rd.

Lisle, IL 60532-4351

References:

Subject:

Fermi 2 NRC Docket No. 50341 NRC License No. NPF-43 Initial License Operator Examination Dates This letter is to inform you that Fermi 2 has set the dates for its next two (2) Initial Licensed Operator training classes.

In a phone conversation between Mr. Kirk Snyder, Fermi 2 Operations Training Supervisor, and Dell McNeil, we requested that the NRC conduct an Initial License Examination on the following dates:

S Examination preparation week:

Examination administration weeks:

February 24, 2003 March 17 & March 24, 2003 Current plans are to have six (6) reactor operator candidates, four (4) upgrade senior reactor operator candidates, and two (2) instant senior reactor operator candidates participate in the exam.

In addition to the March 2003 examination dates, we request that the NRC schedule an additional Initial Licensed Operator Examination on the following dates:

  • Examination preparation week:
  • Examination administration weeks:

August 24, 2004 September 13 & September 20, 2004 If you have any questions in this matter please contact Mr. Kirk Snyder at (734) 586-4896.

Sincerely, (I iC cc:

S. Campbell D. Hood Document Control Desk

William T. O'Connor, Jr.

Vice President, Nuclear Generation Fermi 2 6400 North Dixie Hwy., Newport, Michigan 48166 Tel: 734.586.5201 Fax: 734.586.4172 Detroit Edison A DTF Energy Company

/21, RI March 26, 2001 NRC-01-0033 Regional Administrator Region III U. S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351

References:

1) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
2) Detroit Edison letter to NRC (NRC-00-0089),

Initial License Operator Examination Dates, dated October 13, 2000

Subject:

Initial License Operator Examination Dates Revision to NRC-00-0089 This letter is to request a change in the Initial License Operator Examination dates provided in NRC letter 00-0089 dated October 13, 2000 for Fermi 2. Following are the original dates requested:

0 0

Examination preparation week:

Examination administration weeks:

February 24, 2003 March 17 & March 24, 2003 We are requesting the examination preparation and administration weeks for the above be changed to:

0 0

Examination preparation week:

Examination administration weeks:

February 17, 2003 March 10 & March 17, 2003 BAR Z b 2bDU

USNRC NRC-01-0033 Page 2 This change is requested due to the change in the start date of the Fermi Refueling Outage 09 from April 18, 2003 to March 28, 2003.

If you have any questions in this matter please contact Mr. Kirk Snyder at (734) 586-4896.

Sincerely, cc:

NRC Resident Office M. A. Shuaibi Document Control Desk

William T. O'Connor, Jr.

Vice President, Nuclear Generation Fermi 2 6400 North Dixie Hwy., Newport, Michigan 48166 Tel: 734.686.6201 Fax: 734.686.4172 Detroit Edison A

h A DTE Energy Company September 4, 2001 NRC-01-0064 Regional Administrator Region III U. S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351

Reference:

Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43

Subject:

Initial License Operator Examination Dates This letter is in response to NRC RIS 2001-17 dated August 22, 2001. Fermi 2 has set the dates for its next two (2) Initial Licensed Operator training classes (see attached NRC Form 536, Operator Licensing Examination Data). These dates have been tentatively agreed upon with Region III.

If you have any questions in this matter please contact Mr. Kirk Snyder at (734) 586-4896.

Sincerely, Attachment cc:

T. J. Kim Document Control Desk NRC Resident Office

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 07131/2002 (8-2000)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

his information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records Management Branch T6 E6) U.S. Nucear Regulatory OPERTORLICNSIG Cmmision Wahinton DC 055-0q0-1 orby internet e-mail to EXAMINATION DATA bjs1@nrc.Wov, and to the Desk Officer, Office of Information and Regulato EXAMIATIONDATAAffairs, NOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collecion does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Fermi 2 III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CYYMn 2 Cy-2D3 Cy 4

Cy205 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 0

1 1

0 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0

0 0

0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2o0 2 CYjo3 CY 2 004 CY2005 NUMBER OF REACTOR OPERATORS 0

6 6

0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0

4 3

0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0

3 3

0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0

0 0

0 PROPOSED DATES PRIMARYDATE 0

3/10-3/21 9/13-9/24 0

ALTERNATE DATE 0

3/3-3/14 9/6-9/17 0

C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2002 CY 2003 PROPOSED NUMBER FIRST SECOND THIRD FIRST SECOND THIRD ESTIMATED NUMBER OF090009 CANDIDATES O

9 0

0 D

9 NIRC FORM 536 (8-2000)

PRINTED ON RECYCLED PAPER This form was designed using InForms

February 18, 2002 Mr. William O'Connor, Jr.

Vice President Nuclear Generation Detroit Edison Company 6400 North Dixie Highway Newport, Ml 48166

Dear Mr. O'Connor:

In response to your facility management letter dated September 4, 2001, and as augmented by discussions with Roy Duke of your staff on January 24, 2002, we have tentatively scheduled an initial licensing examination for your operator license applicants at the Fermi Power Plant during the weeks of March 10 and March 17, 2003. Validation of the examination will occur at the station during the week of February 10, 2003. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

As stated in your letter, your staff will develop the examination. To support the examination administration date, we have tentatively scheduled the date of January 27, 2003, to begin our review of your submitted examination.

Your letter indicated you are training approximately 13 candidates for the examination. Please inform us if the number of candidates declines below 10 as this will impact the examination schedule. Please also inform us at your earliest opportunity if you discover you are unable to support the examination on the scheduled dates.

Once your staff has determined a schedule for examination development, please have them contact the Chief Examiner to arrange for a suitable examination outline submittal date for NRC review. The intent is for the examination outline to be submitted early in the examination development process. This is to preclude the need to make significant changes to developed examination material as a result of the NRC review of the outline.

Del R. McNeil has been tentatively assigned as the Chief Examiner and can be reached at 630-829-9737.

A supplementary letter will be sent to the training department approximately 120 days prior to the examination outlining examination security expectations, listing the materials required by the NRC to conduct the examination, reconfirming the examination dates, and reconfirming the number of candidates you have in the training program. If you have any questions concerning this information, please contact Michael E. Bielby of my staff at 630-829-9762.

fIj Od9 1 /5-0, V

W. O'Connor In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).

Since rely David E. Hills, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 cc:

N. Peterson, Director, Nuclear Licensing P. Marquardt, Corporate Legal Department Compliance Supervisor R. Whale, Michigan Public Service Commission Michigan Department of Environmental Quality Monroe County, Emergency Management Division Emergency Management Division Ml Department of State Police L. Sanders, Training Department ADAMS Distribution:

WDR DFT MAS4 RidsNrrDipmlipb GEG HBC SJC4 DRPIII DRSIII PLB1 JRK1 DCT M. A. Bies, DRS DOCUMENT NAME: G:\\DRS\\FER02LdO2drs.wpd To receive a copy of this document, indicate in the box "C" = copy w/o attach/enc "E" = Copy with attach/end "N"

= No copy OFFICE RIIl:DRS Q(7 Rill:DRS I

RIll:DRS I t RlIl:DRS NAME MABies:sd, EggsMEBielby -1i I DEHills P DATE 02/ /02 02/ t/02 02/ '02 OFFICIAL RECORD COPY

Wifliam T. O'Connor, Jr.

A, Vice President, Nuclear Generation Fermi 2 6400 North Dixie Hwy., Newport, Michigan 48166 Tel: 734.586.5201 Fax: 734.586.4172 Detroit Edison

~

A DTE Energy Company July 10, 2002 NRC-02-0059 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555-0001

Reference:

Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43

Subject:

Preparation and Scheduling of Operator Licensing Examinations Attached is a completed NRC Form 536 for the Fermi 2 station. This form is being submitted in response to NRC Regulatory Issue Summary 2002-09 "Preparation and Scheduling of Operator Licensing Examinations".

A change of examination dates is being requested for CY 2004. Due to outage scheduling, we are requesting that our CY 2004 alternate dates become our primary dates, and the primary dates become the alternate. This would move our examination date to a period two (2) weeks sooner than previously requested. Your consideration in this matter would be appreciated.

If you have any questions in this matter please contact Mr. Greg Strobel, General Supervisor, Operations Training, at (734) 586-4067.

Sincerely, Attachment cc:

T. J. Kim M. A. Ring NRC Resident Office Regional Administrator, Region III Region III

r Attachment to NRC-02-0059 Page 1 of I lXAMIN0lION DACA NOW

.~

~

Eh,*;

Fermi 2 Region m

.~~l i

A. PROPOSED MINTIN PO SCHE>

tic F~

w-f

_.9i,.

.W......

1 IO PROPOSED -NWIR 2003 C:Y 2004 C2005

-£r 2006 uCtErlsEF~pRE D 1

1 0

1 M.INNOEN DAAMINA INS 5

6 0

6O B.

1NRegion SE

_,,,=,,................,_.

PRO SE UMBE 2

320

-26 2

0 2

ESTIMATED FMSER F

OP/RATOR_-UT1GR 3

4 0

4 tw~kpmb0 0

00 5P M

6 UIII6E CPE RATORS L4TE PR r

Sche0uled 8/30-9/10

.2/06

-2/13 SENIOR_______

Sc e u e RALTRNE WTR 9/13-9/24 2/20 - 2/27

>~~~~~~

C.PROPOSED GENERIC FUNDAMENTALZ EXAMIN!A1ON (GE CHEDULE Cy 2003 CY 2004 PROPOSED NUMBER

=

FIRT CO FIRST

-SE X THI E"IEi 0

O O

8 O

0 0O

.~~oa

__ii::::::::::::.

fn REGO UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III

&3801 WARRENVILLE ROAD LISLE, ILLINOIS 60532-4351 November 25, 2002 Mr. William O'Connor, Jr.

Vice President Nuclear Generation Detroit Edison Company 6400 North Dixie Highway Newport, Ml 48166

Dear Mr. O'Connor:

In a telephone conversation on November 13, 2002, between Mr. S. Bollinger and Mr. D.

McNeil, arrangements were made for the administration of licensing examinations at the Fermi 2 Nuclear Power Plant the weeks of March 10 and March 17, 2003. In addition, the NRC will make an examination validation visit to your facility the week of February 10, 2003.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 8, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by December 16, 2002 The written examinations, operating tests, and the supporting reference materials identified in Attachment 2 of ES-201 will be due by January 27, 2003.

Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first ML023300443

W. O'Connor examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on April 30, 2003.

The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Bollinger has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Dell McNeil at 630-829-9737, or me at 630-829-9631.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.ciov/readinc-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/0/

Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 See Attached Distribution DOCUMENT NAME: G\\:DRS\\FER1 Jfi02DRS.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE Rill I

zRill II H

NAME DMcNeil:aai-j RLanksbury Q5 DATE 111*/02 11tSl/02 OFFICIAL RECORD COPY

W. O'Connor cc:

N. Peterson, Director, Nuclear Licensing P. Marquardt, Corporate Legal Department Compliance Supervisor R. Whale, Michigan Public Service Commission Michigan Department of Environmental Quality Monroe County, Emergency Management Division Emergency Management Division Ml Department of State Police L. D. Sanders, Training Department ADAMS Distribution:

WDR DCT DFT MAS4 RidsNrrDipmlipb GEG HBC SJC4 DRPI II DRSIII PLB1 JRK1 M. A. Bies, DRS

Fermi 2 6400 North Dixie Hwy., Newport, MI 48166 Detroit Edison January 23, 2003 NANT-03-0014 0801.26 Mr. Keith Walton Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351

Dear Mr. Walton:

Enclosed please find the following examination materials submitted to the NRC in preparation for the upcoming Fermi-2 initial license examination scheduled to occur during the week of March 10, 2003:

  • Modified examination outlines (modified during the examination development process) 125 written examination items (25 specific to Senior Reactor Operators, 25 specific to Reactor Operators, and 75 common) and associated developmental references
  • Administrative topic evaluation items
  • Two (2) simulator scenarios.
  • Appropriate quality verification checklists from Revision 8, Supplement 1 of NUREG 1021
  • A complete set of Fermi-2 EOP flow charts The examination materials were developed using the appropriate guidance contained in Revision 8, Supplement 1 of NUREG 1021. These materials shall be withheld from public disclosure until after the examinations are complete.

We look forward to working with you and your examination team during the examination development and administration process. If you have any questions or comments regarding the contents of the items listed above please contact Mr. Greg Strobel at 734-586-4067.

Sincerely, Larry D. Sanders Manager, Nuclear Training Fermi 2 Enclosure A DTE Energy Company