License Amendment Request 187 to Kewaunee Nuclear Power Plant TS, Confirmation of Use of WCAP-12488, Addendum 2
ML030930532
Person / Time
Site: Kewaunee 
Issue date: 03/21/2003
From: Coutu T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-03-032, WCAP-12488, Add 2
Download: ML030930532 (2)


Text

Committed to Nuclear Excelle5,

Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC NRC-03-032 10 CFR 50.90 March 21, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR-43 LICENSE AMENDMENT REQUEST 187 TO THE KEWAUNEE NUCLEAR POWER PLANT TECHNICAL SPECIFICATIONS, CONFIRMATION OF USE OF WCAP-12488, ADDENDUM 2 (TAC NO. MB5718).

Reference Letter from Mark E. Warner (NMC) to Document Control Desk (NRC), "License Amendment Request 187 to the Kewaunee Nuclear Power Plant Technical Specifications, Conforming Technical Specification Changes for Use of Westinghouse VANTAGE+ Fuel," dated July 26, 2002.

The Nuclear Management Company (NMC) in accordance with 10 CFR 50.90 requested to amend Facility Operating License DRP-43 for Kewaunee Nuclear Power Plant. The purpose of this license amendment request (LAR) was to implement the changes necessary to accommodate Westinghouse 422 VANTAGE + nuclear fuel with PERFORMANCE + features (422V+).

In the NMC submittal (referenced letter) NMC made the statement that as discussed in the Westinghouse report, fuel rod evaluations for the 422V+ fuel were performed using NRC approved models and methods to demonstrate that all fuel rod design criteria are satisfied and documented. One analysis, however, remained to be completed. Westinghouse has forwarded the NRC WCAP-12488, Addendum 2 for review and approval. Following NRC approval of Addendum 2, the stress values were to be re-evaluated to confirm that the proposed clad stress criterion is met. Thus the NMC made the following commitment:

Upon NRC approval of WCAP 12488, Addendum 2, "Revision to Design Criteria," confirmation of meeting the criterion will be submitted.

Prior to the NRC staff's approval of WCAP 12488, Addendum 2, "Revision to Design Criteria,"

the NRC and Westinghouse had discussions on the WCAP 12488, Addendum 2, and it was agreed to renumber the report as WCAP-1 0125-P Addendum 1, "Revision to Design Criteria" without change, at the request of the NRC.

P

N490 Highway 42

  • Kewaunee, Wisconsin 54216-9510 Telephone 920.388.2560

Docket 50-305 NRC-03-032 March 21, 2003 Page 2 Subsequently, Westinghouse has re-evaluated the stress values using WCAP-1 01 25-P Addendum 1, "Revision to Design Criteria," and confirmed that the proposed clad stress criterion is met. This letter fulfills the NMC commitment to confirm to the NRC that the clad stress criterion has been evaluated with the methodology in WCAP-10125-P, Al (formerly WCAP-12488, A2) and has been shown to met the applicable limits.

Although NMC's commitment was to perform a re-evaluation after NRC approval of WCAP 10125, Addendum 1, this re-evaluation has been performed prior to NRC approval of WCAP 10125, Addendum 1. The timing of the re-evaluation was discussed and deemed acceptable in a telecom between Mr. Gerald Riste (NMC) and Mr. John Lamb (NRC).

I declare under penalty of perjury that the foregoing is true and correct.

Executed on March 21, 2003.

Thomas Coutu Site Vice-President, Kewaunee Plant GOR cc-US NRC, Region IlIl US NRC Senior Resident Inspector Electric Division, PSCW