ML030920346

From kanterella
Jump to navigation Jump to search

Correction to Amendment No. 153 Regarding a One-Time Deferral of the Primary Containment Integrated Leak Rate Test
ML030920346
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/01/2003
From: Stang J
NRC/NRR/DLPM/LPD3
To: O'Connor W
Detroit Edison
References
TAC MB5171
Download: ML030920346 (5)


Text

April 1, 2003 Mr. William T. OConnor, Jr.

Vice President - Nuclear Generation Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166

SUBJECT:

FERMI 2 - CORRECTION TO AMENDMENT NO. 153 REGARDING A ONE-TIME DEFERRAL OF THE PRIMARY CONTAINMENT INTEGRATED LEAK RATE TEST (TAC NO. MB5171)

Dear Mr. OConnor:

On March 27, 2003, the Commission issued Amendment No. 153 to Facility Operating License No. NPF-43 for Fermi 2 to change the Technical Specifications (TSs) in response to your application dated May 23, 2002, as supplemented December 20, 2002, and February 27, 2003. The changes revised the TSs to allow a one-time deferral of the Type A primary containment integrated leak rate test.

The purpose of this letter is to correct three typographical errors on TS Page 5.0-18, which was issued in Amendment No. 153. In TS 5.5.12.a., the phrase "Rev. O" should have been "Rev. 0," and the word "test" should have been inserted after the words "Type A." Additionally, in TS 5.5.12.d.1.(ii), the word "te" is misspelled (it should have been "the"). Enclosed is corrected TS Page 5.0-18, which reflects these corrections.

This correction letter is consistent with the licensees May 23, 2002, application and the NRC staffs intent. Please replace TS Page 5.0-18 that was issued with Amendment No. 153 with the enclosed corrected page.

Sincerely,

/RA/

John F. Stang, Senior Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

Corrected TS Page 5.0-18 cc w/encl: See next page

ML030920346 OFFICE PDIII-1/PM PDIII-1/LA PDIII-1/SC NAME JStang RBouling LRaghavan DATE 04/01/03 04/01/03 04/01/03 Fermi 2 cc:

Mr. Peter Marquardt Legal Department 688 WCB Detroit Edison Company 2000 2nd Avenue Detroit, MI 48226-1279 Drinking Water and Radiological Protection Division Michigan Department of Environmental Quality 3423 N. Martin Luther King Jr Blvd P. O. Box 30630 CPH Mailroom Lansing, MI 48909-8130 U.S. Nuclear Regulatory Commission Resident Inspectors Office 6450 W. Dixie Highway Newport, MI 48166 Monroe County Emergency Management Division 963 South Raisinville Monroe, MI 48161 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Norman K. Peterson Director, Nuclear Licensing Detroit Edison Company Fermi 2 - 280 TAC 6400 North Dixie Highway Newport, MI 48166 March 2002