March 28, 2003 Mr. Steve Redeker Manager, Plant Closure and Decommissioning Sacramento Municipal Utility District Rancho Seco 14440 Twin Cities Road Herald, CA 95638
SUBJECT:
RESPONSE TO ORDER FOR INTERIM SAFEGUARDS AND SECURITY COMPENSATORY MEASURES FOR RANCHO SECO NUCLEAR GENERATING STATION
Dear Mr. Redeker:
On October 16, 2002, the U.S. Nuclear Regulatory Commission (NRC) issued Orders to dry storage independent spent fuel storage installations (ISFSIs) for the implementation of interim safeguards and security compensatory measures (ICMs). As a dry storage ISFSI, one of these Orders was issued to the Rancho Seco Nuclear Generating Station. On November 4, 2002, Sacramento Municipal Utility District, the licensee for the Rancho Seco Nuclear Generating Station, submitted its written response to the Order.
In your November 4, 2002, response, you stated that Sacramento Municipal Utility District, had implemented all the required interim compensatory measures for the ISFSI or has provided a schedule by which necessary actions will be completed. Based on our review, the NRC staff finds that your response to the October 16, 2002, Order for the Rancho Seco Nuclear Generating Station is acceptable and responsive to the Order.
Please remember, pursuant to Section III.C.2, you are to report to the Commission, in accordance with 10 CFR 72.4, when you have achieved full compliance with the requirements described in Attachment 2 to the Order. The NRC will determine the effectiveness of your implementation of the ICMs through on-site inspections.
If you have any questions about this letter, please call me at 301-415-8500.
Sincerely,
/RA/ original signed by /s/
Mary Jane Ross-Lee, Senior Project Manager Licensing Section Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards Docket No. 72-11 cc: Mailing List
Mr. Steve Redeker March 28, 2003 Manager, Plant Closure and Decommissioning Sacramento Municipal Utility District Rancho Seco 14440 Twin Cities Road Herald, CA 95638
SUBJECT:
RESPONSE TO ORDER FOR INTERIM SAFEGUARDS AND SECURITY COMPENSATORY MEASURES FOR RANCHO SECO NUCLEAR GENERATING STATION
Dear Mr. Redeker:
On October 16, 2002, the U.S. Nuclear Regulatory Commission (NRC) issued Orders to dry storage independent spent fuel storage installations (ISFSIs) for the implementation of interim safeguards and security compensatory measures (ICMs). As a dry storage ISFSI, one of these Orders was issued to the Rancho Seco Nuclear Generating Station. On November 4, 2002, Sacramento Municipal Utility District, the licensee for the Rancho Seco Nuclear Generating Station, submitted its written response to the Order.
In your November 4, 2002, response, you stated that Sacramento Municipal Utility District, had implemented all the required interim compensatory measures for the ISFSI or has provided a schedule by which necessary actions will be completed. Based on our review, the NRC staff finds that your response to the October 16, 2002, Order for the Rancho Seco Nuclear Generating Station is acceptable and responsive to the Order.
Please remember, pursuant to Section III.C.2, you are to report to the Commission, in accordance with 10 CFR 72.4, when you have achieved full compliance with the requirements described in Attachment 2 to the Order. The NRC will determine the effectiveness of your implementation of the ICMs through on-site inspections.
If you have any questions about this letter, please call me at 301-415-8500.
Sincerely,
/RA/ original signed by /s/
Mary Jane Ross-Lee, Senior Project Manager Licensing Section Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards Docket No. 72-11 cc: Mailing List DISTRIBUTION:
Docket NRC File Center PUBLIC NMSS r/f SFPO r/f EWBrach LCamper WHodges GSmith, NSIR RManili, NSIR JHickman, NRR VEverett, RIV BSpitzberg, RIV (closes TAC no. L23549)
C:\\ORPCheckout\\FileNET\\ML030870927.wpd
- see previous concurrences OFFICE SFPO E
SFPO:LA E
SFPO: SC E
NAME MJRoss-Lee*
EZiegler*
JMonninger DATE 03/27 /03 03/28 /03 03/28/03 OFFICIAL RECORD COPY
Rancho Seco Nuclear Generating Station Docket 72-11 cc:
Mr. James Shetler AGM, Energy Supply Sacramento Municipal Utility District 6201 S Street P.O. Box 15830 Sacramento, CA 95852 Thomas A. Baxter, Esq.
Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.
Washington, D.C. 20037 Mr. Jerry Delezenski Quality & Compliance Superintendent Sacramento Municipal Utility District Rancho Seco Nuclear Station 14440 Twin Cities Road Herald, CA 95638-9799 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Sacramento County Board of Supervisors 700 H Street, Suite 2450 Sacramento, CA 95814 Ms. Dana Appling, General Counsel Sacramento Municipal Utility District P. O. Box 15830 Sacramento, CA 95852-1830 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P. O. Box 942732 Sacramento, CA 94327-7320 Mr. Ed Bailey, Radiation Program Director Radiologic Health Branch State Department of Health Services P. O. Box 942732 (MS 178)
Sacramento, CA 94327-7320 Mr. Robert A. Laurie, Commissioner California Energy Commission 1516 Ninth Street (MS 31)
Sacramento, CA 95814 Cindy Buchanan, Site Document Control Supervisor Sacramento Municipal Utility District Rancho Seco Nuclear Generating Station 14440 Twin Cities Road Herald, CA 95638-9799