VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 March 25, 2003 Re: 10 CFR 2.202 10 CFR 50.4 U.S. Nuclear Regulatory Commission Serial No.:
03-066A Attention: Document Control Desk NL&OS/MAE:
R1 Washington, D.C. 20555-0001 Docket Nos.:
50-338 50-339 License Nos.:
NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 ADDITIONAL INFORMATION PROVIDED FOR THE ORDER FOR COMPENSATORY MEASURES RELATED TO ACCESS AUTHORIZATION DATED JANUARY 7, 2003 On January 7, 2003, the Nuclear Regulatory Commission (NRC) issued an Order requiring compensatory measures (CMs) related to access authorization for all operating nuclear power reactor licensees.
Virginia Electric and Power Company (Dominion) submitted an answer to the Order on January 27, 2003 (Serial No.03-066).
Dominion's responses to CMs C.1.1, C.1.2, and C.1.3 required that Dominion provide the NRC with additional information. Attached is that information.
Additional information related to CMs C.1.4 and C.1.5 is also included in the attachment.
This additional information is provided in response to a telephone conversation on March 13, 2003 with Mr. Micheal Burrell, Mr. Bradley Baxter and Mr.
Christopher Gratton of the NRC. Schedule changes for CMs B.1.2, B.1.3 c), B.1.4, B.1.5, and B.1.7, C.1.6, and C.1.10 are also included in the attachment.
The attachment to this letter contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.
If you have any questions, please contact us.
Very truly yours, i
6 lý Eugene S. Grecheck Vice President - Nuclear Support Services Attachment-Additional Information Provided For CMs (Safeguards Information)
ATTACHMENT CONTAINS SAFEGUARDS INFORMATION.
UPON SEPARATION THIS PAGE IS DECONTROLLED.
Commitments made by this letter:
- 1. As described in the Attachment.
cc:
U. S. Nuclear Regulatory Commission ATTN: Mr. Glenn Tracy Mail Stop T-4A9 Two White Flint North 11545 Rockville Pike Rockville, MD 20852-2738 Secretary, Office of the Secretary of the Commission (w/o Att.)
U. S. Nuclear Regulatory Commission ATTN: Rulemakings and Adjudications Staff Washington, D. C. 20555 Mr. Samuel J. Collins, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Assistant General Counsel for Materials Litigation and Enforcement (w/o Att.)
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 U. S. Nuclear Regulatory Commission Region II Regional Administrator P. 0. Box 2257 Atlanta, Georgia 30303-3415 Mr. S. R. Monarque (w/o Att.)
NRC Project Manager North Anna Power Station Mr. M. J. Morgan (w/o Att.)
NRC Senior Resident Inspector North Anna Power Station ATTACHMENT CONTAINS SAFEGUARDS INFORMATION.
UPON SEPARATION THIS PAGE IS DECONTROLLED.
SN: 03-066A Docket Nos.: 50-338/339
Subject:
Add. Info. For Acc. Sec. Order COMMONWEALTH OF VIRGINIA
) )
COUNTY OF HENRICO
)
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Eugene S. Grecheck who is Vice President-Nuclear Support Services of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me thisq3Thday of rD4h,_
,2003.
My Commission Expires:
3 31-L_
NoayPub flc (S EAL)-.
ATTACHMENT CONTAINS SAFEGUARDS INFORMATION.