Ltr D. Christian, (Surry) Virginia Electric Power Co, Response to Order for Interim Safeguards and Security Compensatory Measures (Icms) for Surry Power Station (72-02) (TAC No. L23552)
ML030860283
Person / Time
Site: Surry, 07200002  Dominion icon.png
Issue date: 03/26/2003
From: Ross-Lee M
NRC/NMSS/SFPO
To: Christian D
Virginia Electric & Power Co (VEPCO)
Ross-Lee M NMSS/SFPO (301) 415-3781
References
-RFPFR, TAC L23552
Download: ML030860283 (3)


Text

March 26, 2003 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Virginia Electric and Power Company Surry Power Station 5000 Dominion Boulevard Glen Allen, VA 23060

SUBJECT:

RESPONSE TO ORDER FOR INTERIM SAFEGUARDS AND SECURITY COMPENSATORY MEASURES FOR SURRY POWER STATION

Dear Mr. Christian:

On October 16, 2002, the U.S. Nuclear Regulatory Commission (NRC) issued Orders to dry storage independent spent fuel storage installations (ISFSIs) for the implementation of interim safeguards and security compensatory measures (ICMs). As a dry storage ISFSI, one of these Orders was issued to the Surry Power Station. On November 1, 2002, Virginia Electric and Power Company (Dominion), the licensee for the Surry Power Station, submitted its written response to the Order.

In your November 1, 2002, response, you stated that Dominion had implemented all the required interim compensatory measures for the ISFSI or has provided a schedule by which necessary actions will be completed. Based on our review, the NRC staff finds that your response to the October 16, 2002, Order for the Surry Power Station is acceptable and responsive to the Order.

Please remember, pursuant to Section III.C.2, you are to report to the Commission, in accordance with 10 CFR 72.4, when you have achieved full compliance with the requirements described in Attachment 2 to the Order. The NRC will determine the effectiveness of your implementation of the ICMs through on-site inspections.

If you have any questions about this letter, please call me at 301-415-8500.

Sincerely,

/RA/ original signed by /s/

Mary Jane Ross-Lee, Senior Project Manager Licensing Section Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards Docket No. 72-02 cc: Mailing List

Mr. David A. Christian March 26, 2003 Sr. Vice President and Chief Nuclear Officer Virginia Electric and Power Company Surry Power Station 5000 Dominion Boulevard Glen Allen, VA 23060

SUBJECT:

RESPONSE TO ORDER FOR INTERIM SAFEGUARDS AND SECURITY COMPENSATORY MEASURES FOR SURRY POWER STATION

Dear Mr. Christian:

On October 16, 2002, the U.S. Nuclear Regulatory Commission (NRC) issued Orders to dry storage independent spent fuel storage installations (ISFSIs) for the implementation of interim safeguards and security compensatory measures (ICMs). As a dry storage ISFSI, one of these Orders was issued to the Surry Power Station. On November 1, 2002, Virginia Electric and Power Company (Dominion), the licensee for the Surry Power Station, submitted its written response to the Order.

In your November 1, 2002, response, you stated that Dominion had implemented all the required interim compensatory measures for the ISFSI or has provided a schedule by which necessary actions will be completed. Based on our review, the NRC staff finds that your response to the October 16, 2002, Order for the Surry Power Station is acceptable and responsive to the Order.

Please remember, pursuant to Section III.C.2, you are to report to the Commission, in accordance with 10 CFR 72.4, when you have achieved full compliance with the requirements described in Attachment 2 to the Order. The NRC will determine the effectiveness of your implementation of the ICMs through on-site inspections.

If you have any questions about this letter, please call me at 301-415-8500.

Sincerely,

/RA/ original signed by /s/

Mary Jane Ross-Lee, Senior Project Manager Licensing Section Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards Docket No. 72-02 cc: Mailing List DISTRIBUTION:

Docket NRC File Center PUBLIC NMSS r/f SFPO r/f EWBrach LCamper WHodges GSmith, NSIR RManili, NSIR CGratton, NRR WGloersen, RII Dayres, RII (closes TAC no. L23552)

C:\\ORPCheckout\\FileNET\\ML030860283.wpd OFFICE SFPO E

SFPO:LA E

SFPO: SC E

NAME MJRoss-Lee EZiegler JMonninger DATE 03/24 /03 03/25/03 03/26/03 OFFICIAL RECORD COPY

Surry Power Station Docket 72-02 cc:

Ms. Lillian M.Cuoco, Esq.

Senior Nuclear Counsel Dominion Nuclear Connecticut, Inc.

Millstone Power Station Building 475, 5th Floor Rope Ferry Road Rt. 156 Waterford, Connecticut 06385 Senior Resident Inspector Surry Power Station U. S. Nuclear Regulatory Commission 5850 Hog Island Road Surry, Virginia 23883 Chairman Board of Supervisors of Surry County Surry County Courthouse Surry, Virginia 23683 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation P. O. Box 1197 Richmond, Virginia 23209 Robert B. Strobe, M.D., M.P.H.

State Health Commissioner Office of the Commissioner Virginia Department of Health P.O. Box 2448 Richmond, Virginia 23218 Office of the Attorney General Commonwealth of Virginia 900 East Main Street Richmond, Virginia 23219 Mr. Stephen P. Sarver, Director Nuclear Licensing & Operations Support Innsbrook Technical Center Virginia Electric and Power Company 5000 Dominion Blvd.

Glen Allen, Virginia 23060-6711 Mr. David A. Heacock Site Vice President North Anna Power Station Virginia Electric and Power Company P. O. Box 402 Mineral, Virginia 23117-0402 Mr. William R. Matthews Vice President - Nuclear Operations Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, Virginia 23060-6711 Mr. Richard H. Blount, II Site Vice President Surry Power Station Virginia Electric and Power Company 5570 Hog Island Road Surry, Virginia 23883-0315