ML030860159
| ML030860159 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 05/31/2002 |
| From: | Marshall M Office of Nuclear Reactor Regulation |
| To: | Grobe J, Hackett E, Allen Hiser, Matthew Kirk, Albert Lee NRC/RGN-III |
| References | |
| FOIA/PA-2003-0018 | |
| Download: ML030860159 (5) | |
Text
.
Steveon Long-.Another Revised Agenda for June 5th ACRS Meeting P
From:
Michael Marshall To:
K Grobe, John; Hackett, Edwin; Hiser, Allen, Kirk, Mark; Lee, Andrea Date:
5/31/02 8:52AM
Subject:
Another Revised Agenda for June 5th ACRS Meeting Hello Attached is a revised agenda for the June 5, 2002 ACRS subcommittee and June 6, 2002 full committee meeting. I do not expect any additional changes to the agendas Also, attached is a condensed version of the agenda that the ACRS will be work from because they wanted an agenda the was only one page long The changes are highlighted in yellow REMINDER: Please email me your slides by COB, today.
NOTE: The MRP presenters may change Cordially, Michael Marshall 301-415-2734 CC:
Barrett, Richard, Bateman, Bill; Bloom, Steven; Casto, Charles; Chan, Terence; Chokshi, Nilesh; Coffin, Stephanie; Holmberg, Melvin; Howell, Art, Jacobson, John; Long, Steven; Mayfield, Michael, Mendiola, Anthony; Norris, Wallace; Pickett, Douglas
I.Steven Long - 2002-06-05 Agenda for ACRS Meeting, Rev04a.wpd ADVISORY COMMITTEE ON REACTOR SAFEGUARDS MATERIALS & METALLURGY AND PLANT OPERATIONS SUBCOMMITTEES VESSEL HEAD PENETRATION CRACKING AND VESSEL HEAD DEGRADATION ROOM T-2B3, 11545 ROCKVILLE PIKE June 5, 2002
-AGENDA -
SUBJECT I
Introductory Remarks I1.
Status of NRC Bulletin 2001-01 Reviews Status of NRC Bulletin 2002-01 Reviews I1l.
Status of MRP Work on Technical Issues
- BREAK***
Status of MRP Work on Technical Issues
- LUNCH***
IV.
NRC Assessment of Margin Available at Davis Besse V.
Status of Activities at Davis Besse
- BREAK***
VI.
Technical Assessment of RPV Head Degradation Vii Overview of Ongoing NRC
- 0350 Panel
- Lessons Learned Task Force
- Management by Leakage Detection VIII Proposed Industry Inspection Plan IX.
General Discussion and Adjournment PRESENTER F.P. Ford, ACRS Allen Hiser, NRR Andrea Lee, NRR Larry Mathews, MRP Larry Mathews, MRP Mark Kirk, RES Jim Powers, FENOC Glenn White, MRP Jack Grobe, Rill Edwin Hackett, RES Allen Hiser, NRR Larry Mathews, MRP MRP - Electric Power Research Institute Material Reliability Program FENOC - First Energy Nuclear Operating Co.
Note-Number of copies of presentation materials to be provided to the ACRS - 40 TIME 8.30a - 9:00a 9 00a - 9:15a 9 15a - 9.30a 9:30a - 10:00p 10.00a - 10:15a 10 15a - 12:00p 12.00p - l:00p 1:00p - 1:45p 1:45p - 3.45p 3:45p -4:00p 4.00p - 4:30p 4.30p - 5:30p 5:30p - 6:30p 6 30p ACRS CONTACT Maggalean W. Weston, mww@nrc gov or (301) 415-3151.
ý - ---
Pýa-66 I'
vel St6iL g - 2002:06:05 Ag--dihdfoKACRS*Meetingf, Rv~~
ADVISORY COMMITTEE ON REACTOR SAFEGUARDS ROOM T-2B3, 11545 ROCKVILLE PIKE June 6, 2002
-AGENDA -
SUBJECT Introductory Remarks Summary of Activities at Davis Besse Summary of MRP Work Summary of NRC's Activities PRESENTER George Apostolakis, ACRS Jim Powers, FENOC Larry Mathews, MRP Bill Bateman, NRC TIME 8,35a 45a 8 45a - 9"15a 9.15a - 9"45a 9:45a - 10.30a Pa -e 2 I.
II.
III IV.
-[ Steven Long - 2002-06-05 Agenda for ACRS Meeting, Rev04.wpd ADVISORY COMMITTEE ON REACTOR SAFEGUARDS MATERIALS & METALLURGY AND PLANT OPERATIONS SUBCOMMITTEES VESSEL HEAD PENETRATION CRACKING AND VESSEL HEAD DEGRADATION ROOM T-2B3, 11545 ROCKVILLE PIKE June 5, 2002
-AGENDA SUBJECT I.
Introductory Remarks II.
Status of NRC Bulletin 2001-01 Reviews Status of NRC Bulletin 2002-01 Reviews I1l.
Status of MRP Work on Technical Issues
"* Introductory Remarks
"* Crack Growth Database
- BREAK***
Status of MRP Work on Technical Issues
- Crack Growth Curve and Sensitivity Analysis
- Probabilistic Fracture Mechanics
- Collateral Damage
- Concluding Remarks
- LUNCH***
IV.
NRC Assessment of Margin Available at Davis Besse V.
Status of Activities at Davis Besse
- Introductory Remarks
- Reactor Pressure Vessel Head Field Activities Update
- Root Cause Analysis
- Reactor Pressure Vessel Head Replacement
- Concluding Remarks
- BREAK***
VI.
Technical Assessment of RPV Head Degradation VII.
Overview of Ongoing NRC
- 0350 Panel
- Lessons Learned Task Force
- Management by Leakage Detection Proposed Industry Inspection Plan General Discussion and Adjournment PRESENTER F.P. Ford, ACRS Allen Hiser, NRR Andrea Lee, NRR Larry Mathews, MRP Larry Mathews, MRP Larry Mathews, MRP P. Riccardella, MRP Larry Mathews, MRP Larry Mathews, MRP Mark Kirk, RES Jim Powers, FENOC Mark McLaughlin, FENOC Steve Loehlein, FENOC Bob Schrauder, FENOC Jim Powers, FENOC Glenn White, MRP Jack Grobe, Rill Edwin Hackett, RES Allen Hiser, NRR M Lashley, MRP TIME 8:30a - 9:00a 9.00a - 9.15a 9:15a - 9.30a 9:30a - 10.00p 10 00a - 10"15a 10"15a - 12.00p 12:00p-1:00p 1:00p - 1:45p 1:45p - 3:45p 3:45p - 4,00p 4:00p - 4:30p 4:30p - 5:30p 5:30p - 6:30p 6:30p MRP - Electric Power Research Institute Material Reliability Program FENOC - First Energy Nuclear Operating Co Note:
Number of copies of presentation materials to be provided to the ACRS - 40.
ACRS CONTACT: Maggalean W. Weston, mww@nrc.gov or (301) 415-3151.
VIII.
IX.
Page 11
-[-Stei
-og -2002--06:05 "A*-nd5f6r ACRS-M6itintnRe*v04.-wp-d ADVISORY COMMITTEE ON REACTOR SAFEGUARDS ROOM T-2B3, 11545 ROCKVILLE PIKE June 6, 2002
- AGENDA -
SUBJECT I.
Introductory Remarks II.
Summary of Activities at Davis Besse III Summary of MRP Work IV.
Summary of NRC's Activities PRESENTER George Apostolakis, ACRS Jim Powers, FENOC Larry Mathews, MRP Bill Bateman, NRC TIME 8:35a - 8"45a 8"45a - 9:15a 9 15a - 9:45a 9:45a - 10:30a