E-mail D. Pickett to DB Daily Call; DB0350, Et Al, Fwd: Draft Preliminary Responses to NRC RAI on Safety Significance Assessment
ML030860144
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/31/2002
From: Pickett D
Office of Nuclear Reactor Regulation
To: Matthew Kirk, Norris W
Office of Nuclear Reactor Regulation
References
FOIA/PA-2003-0018
Download: ML030860144 (2)


Text

SISt-L-orlg

--Fwd: Draft Preliminary Responses to NRC RAI on Safety Significance Assessment Page

[SL f~n From:

Douglas Pickett To:

DB Daily Call, DB0350; Mark Kirk; Wallace Norrs Date:

5/31/02 5.08PM

Subject:

Fwd: Draft Preliminary Responses to NRC RAI on Safety Significance Assessment Something else....

q 57

F-Steven Long - Draft Preliminary Responses to NRC RAI on Safety Significance Assessment.

From:

<drwuokko@firstenergycorp.com>

To:

<dvpl @nrc.gov>

Date:

5/31/02 5:06PM

Subject:

Draft Preliminary Responses to NRC RAI on Safety Significance Assessment Doug I also meant to specifically tell you that the calculation is not proprietary information and can be forwarded on to the NRC staff contractors

-Dale Wuokko

-. Forwarded by Dale R. WuokkolTE/FirstEnergy on 05/31/2002 05:00 PM Dale R. Wuokko To:

dvpl@nrc gov 05/31/2002 cc:

ajm@nrc.gov, spsl@nrc.gov, Theo S.

04:58 PM SwimlTE/FirstEnergy@FirstEnergy, Michael K.

Leisure/TE/FirstEnergy@FirstEnergy, James J.

Powers/CEI/FirstEnergy@FirstEnergy, Patrick J.

McCloskey/TE/FirstEnergy@FirstEnergy, David L Eshelman/TE/FirstEnergy@FirstEnergy, Kendall W.

Byrd/TE/FirstEnergy@FirstEnergy, Dennis R.

Blakely/TE/FirstEnergy@FirstEnergy, Mark A.

Riemer/FirstEnergy@FirstEnergy, ncofie@structint com, priccard@structint.com

Subject, Draft Preliminary Responses to NRC RAI on Safety Significance Assessment Doug Aa discussed on yesterday's conference call, attached are the draft, preliminary responses to the NRC staff questions on the April 8, 2002, Davis-Besse RPV Head Degradation Safety Significance Assessment (letter Serial No. 1-1268). Please note that Appendix B (ASME paper) to the Structural Integrity calculation was provided to the NRC staff yesterday and is not included here in order to reduce the size of the e-mail Since Mark Kirk-NRC/RES is scheduled to speak at the June 5 ACRS subcommittee meeting on the assessment of margin available, you may want to ensure he, in particular, is aware of this information attached below.

As always, please let me know if we need to hold a conference call with the NRC staff to discuss this information further.

-Dale Wuokko (See attached file: Preliminary SSA RAI Response PDF)

CC:

<ajm@nrc.gov>, <spsl@nrc gov>, <tsswim@firstenergycorp com>,

<mkleisure@firstenergycorp.com>