March 26, 2003
Tennessee Valley Authority
ATTN: Mr. J. A. Scalice
Chief Nuclear Officer and
Executive Vice President
6A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
SUBJECT:
SENIOR REACTOR OPERATOR INITIAL RE-TAKE EXAMINATION - BROWNS
FERRY NUCLEAR PLANT 50-259/2003-301, 50-260/2003-301 AND 50-
296/2003-301
Dear Mr. Scalice:
In a telephone conversation on March 24, 2003, between Mr. Randy Knight, Operations Lead
Instructor, of your staff and Mr. Edwin Lea, Senior Operations Engineer of my staff,
arrangements were made for the administration of a re-take licensing examination at the
Browns Ferry Nuclear Power Plant on May 8, 2003. The administrative section of the operating
test will be administrated to a senior operator applicant.
As agreed during the conversation, your staff will prepare the examination based on the
guidelines in Revision 8, Supplement 1, of NUREG-1021, "Operator Licensing Examination
Standards for Power Reactors." The NRC regional office will discuss with your staff any
changes that might be necessary before the examination is administered.
To meet the above schedule, it will be necessary for your staff to furnish the administrative
section of the operating test, and the supporting reference materials by April 11, 2003.
Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall
approve the outline, examination, and test before they are submitted to the NRC for review and
approval. All materials shall be complete and ready-to-use. Any delay in receiving the required
examination and reference materials, or the submittal of inadequate or incomplete materials,
may cause the examination to be rescheduled.
In order to conduct the administrative section of the operating test, it will be necessary for your
staff to make the simulation facility available on May 8, 2003.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit a preliminary senior
reactor operator license application (Office of Management and Budget (OMB) approval
number 3150-0090), medical certification (OMB approval number 3150-0024), and waiver
requests (OMB approval number 3150-0090) at least 30 days before the first examination date.
If the application is not received at least 30 days before the examination date, a postponement
2
may be necessary. Signed application certifying that all training has been completed should be
submitted at least 7 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number 3150-0018, which expires on April 30, 2003. The
public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per
response, including the time for reviewing instructions, gathering and maintaining the data
needed, writing the examinations, and completing and reviewing the collection of information.
Send comments on any aspect of this collection of information, including suggestions for
reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at
BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs,
NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB control number.
Thank you for your cooperation in this matter. Mr. Knight has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRCs examination
procedures and guidelines, please contact Edwin Lea at (404) 562-4567, (Internet E-mail:
EXL2@NRC.GOV), or myself at (404) 562-4638, (Internet E-mail: MEE@NRC.GOV).
Sincerely,
/RA/
Michael E. Ernstes, Chief
Operator Licensing and
Human Performance Branch
Division of Reactor Safety
Docket Nos. 50-259, 50-260, 50-296
License Nos. DPR-33, DPR-52, DPR-68
cc: (See page 3)
3
cc contd:
Karl W. Singer
Senior Vice President
Nuclear Operations
Tennessee Valley Authority
Electronic Mail Distribution
James E. Maddox, Acting Vice President
Engineering and Technical Services
Tennessee Valley Authority
Electronic Mail Distribution
Ashok S. Bhatnagar
Site Vice President
Browns Ferry Nuclear Plant
Tennessee Valley Authority
Electronic Mail Distribution
General Counsel
Tennessee Valley Authority
Electronic Mail Distribution
Robert J. Adney, General Manager
Nuclear Assurance
Tennessee Valley Authority
Electronic Mail Distribution
Robert G. Jones, Plant Manager
Browns Ferry Nuclear Plant
Tennessee Valley Authority
Electronic Mail Distribution
Mark J. Burzynski, Manager
Nuclear Licensing
Tennessee Valley Authority
Electronic Mail Distribution
Timothy E. Abney, Manager
Licensing and Industry Affairs
Browns Ferry Nuclear Plant
Tennessee Valley Authority
Electronic Mail Distribution
State Health Officer
Alabama Dept. of Public Health
RSA Tower - Administration
Suite 1552
P. O. Box 303017
Montgomery, AL 36130-3017
Chairman
Limestone County Commission
310 West Washington Street
Athens, AL 35611
David Matherly
Training Manager
Browns Ferry Nuclear Plant
P. O. Box 2000
Decatur, AL 35609-2000
4
Distribution:
K. Jabbour, NRR
C. Evans (Part 72 Only)
L. Slack, RII EICS
RIDSRIDSNRRDIPMLIPB
PUBLIC
OFFICE
RII:DRS
RII:DRS
RII:DRP
SIGNATURE
/RA/
/RA By LMiller Acting for/
/RA/
NAME
ELea:pmd
MErnstes
SCahill
DATE
3/24/03