V C Summer - 20 Day Response to 02/11/2003 Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors
ML030840613
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 02/28/2003
From: Byrne S
South Carolina Electric & Gas Co
To:
NRC/SECY/RAS
References
BL-02-002, EA-03-009
Download: ML030840613 (1)


Text

Stephen A Byrne Senior Vice President, Nuclear Operations 803 345 4622 February 28, 2003 A SCANA COMPANY Secretary, Office of the Secretary of the Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTN: Rulemakings and Adjudications Staff Ladies and Gentlemen:

SUBJECT:

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS)

DOCKET NO. 50/395 LICENSE NO. NPF-12 FEBRUARY 11, 2003 ORDER ESTABLISHING INTERIM INSPECTION REQUIREMENTS FOR REACTOR PRESSURE VESSEL HEADS AT PRESSURIZED WATER REACTORS (EA-03-009)

REFERENCE:

1. S. A. Byrne (SCE&G) letter, RC-02-0160, dated September 12, 2002, to Document Control Desk (NRC), Response to NRC Bulletin 2002-02.
2. K. R. Cotton (NRC) Letter to S. A. Byrne (SCE&G), Response to NRC Bulletin 2002-02, "Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection Programs" (TAC MB5928), December 23, 2002.

On February 11, 2003, the Nuclear Regulatory Commission (NRC) issued an Order in accordance with 10 CFR 2.202 that established interim inspection requirements for pressurized water reactor (PWR) vessel heads. Licensees are required by Section V of the Order to submit an answer in accordance with 10 CFR 2.202 within twenty (20) days of date of the Order.

South Carolina Electric & Gas Company (SCE&G) has previously proposed inspections in response (Reference 1) to NRC Bulletin 2002-02. The NRC (Reference 2) approved this inspection schedule for short-term inspections. SCE&G intends to implement the short-term inspection schedule and techniques as approved by the NRC in the referenced letter and as authorized by footnote 2 of IV.C of the Order. This Inspection will be in full compliance with the Order.

SCE&G commits to implementing the long-term inspections prescribed by the Order.

Implementation of these two actions will assure compliance with the Order.

I certify under penalty of perjury that the foregoing is true and correct.

?-& el,/o S Executed on JT/SAB/dr c:

Mr. N. 0. Lorick Mr. N. S. Cams Mr. T. G. Eppink Mr. R. J. White Document Control Desk Stephen A. Byrne Senior Vice President, Nuclear Plant Operations Mr. S. J. Collins Mr. D. C. Dambly Mr. L. A. Reyes Ms. K. R. Cotton Ms. K. M Sutton NSRC File (815.07)

RTS: (0-C-03-0447)

DMS (RC-03-0048)

SCE&G I Trgil (.Summer Nuclear Station. P 0. Box 88 *Jenkinsv:ile, South (orolino 29065 °T (803) 345 5209 °www scono corn J