February 2003 Monthly Operating Report for Susquehanna, Units 1 and 2
ML030840580
Person / Time
Site: Susquehanna  
(NPF-014, NPF-022)
Issue date: 03/14/2003
From: Richard Anderson
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-005609, R41-2A
Download: ML030840580 (7)


Text

Richard L. Anderson Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3883 Fax 570.542.1504 RLAnderson @ pplweb com a

4 j I Ia' In

+m6k-TM March 14,2003 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station OPI-17 Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA-005609 R4 I-2A The February 2003 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.

Very truly yours, Richard L. Anderson JJH~cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. S. Hansell NRC Project Manager, Mr. R V. Guzman

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 03/14/2003 J. J. Hennings (570) 542-3747 OPERATING STATUS Unit Name:

Susquehanna Steam Electric Station (U1)

Reporting Period:

February 2003 Design Electrical Rating (Net MWe):

1115 Maximum Dependable Capacity (Net MWe):

1105 Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 672 672 672 0

738,234

1.
2.
3.
4.
5.
6.
7.
8.

9.

Yr.-to-Date 1416 1416 1416 0

1,557,315 Cumulative 72,945 143,280.5 141,069.8 0

144,810,844 NOTES:

Page 1 of 1

UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 03/14/03 J. J. Hennings (570) 542-3747 REPORT MONTH February 2003 No.

Date Type Duration Reason Method of Cause & Corrective Action I

(Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 No Shutdowns this month.

Summary: On February 22, reactor power was reduced to 60% to perform planned condenser waterbox cleaning. Full reactor power operation was resumed on February 24.

2.

Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction i

E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

3.

Method:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other

1.

F. Forced S. Scheduled Page 1 of 1

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:

50-387 Date:

03/14/03 Completed by:

J. J. Hennings Telephone:

(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 03/14/03 J. J. Hennings (570) 542-3747 OPERATING STATUS

1. Unit Name:

Susquehanna Steam Electric Station (U2)

2.

Reporting Period:

February 2003

3.

Design Electrical Rating (Net MWe):

1117

4.

Maximum Dependable Capacity (Net MWe):

1111 Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 672 672 672 0

688,219 Yr.-to-Date 1416 1416 1416 0

1,521,807

5.
6.
7.
8.

9.

Cumulative 158,185 137,565.4 135,622.7 0

141,632,801 NOTES:

Page 1 of 1

UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 03/14/03 J. J. Hennings (570) 542-3747 REPORT MONTH February 2003 No.

Date Type Duration Reason Method of Cause & Corrective Action I

(Hours) 2 Shutting to Prevent Recurrence Down Reactor 3

No Shutdowns this month.

Summary: The core reached the end of its full power capability for fuel cycle 11 on 1/24/03. The reactor coasted down from 96% to 86% during February and will be in coast down condition until the refueling outage in March.

3.

Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

Method:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other 1.

F. Forced S. Scheduled 2.

Page 1 of 1

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:

50-388 Completed by:

J. J. Hennings Date:

03/14/03 Telephone:

(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.