ML030830115

From kanterella
Jump to navigation Jump to search
Emergency Plan Implementing Procedure Revisions
ML030830115
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 03/20/2003
From: Abney T
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
R08 030321 762
Download: ML030830115 (5)


Text

R08 030321 762 March 20, 2003 10 CFR Part 50, App E U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop OWFN, P1-35 Washington, D.C. 20555-0001 Gentlemen:

In the Matter of ) Docket Nos. 50-259 Tennessee Valley Authority ) 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - UNITS 1, 2, and 3 -

EMERGENCY PLAN IMPLEMENTING PROCEDURE (EPIP) REVISIONS TVA is submitting this notification in accordance with the requirements of 10 CFR Part 50, Appendix E, Section V.

Specifically, portions of EPIP-1 were revised, namely, Table of Contents, Revision 34; Section II-1.0, Revision 31; Section II-3.0, Revision 30; Section III-1.0, Revision 31; and Section III-3.0, Revision 30. The revisions have an effective date of March 10, 2003.

The enclosed information is being sent by certified mail.

The signed receipt signifies that you have received this information. If you have any questions, please telephone me at (256) 729-2636.

Sincerely, original signed by:

T. E. Abney Manager of Licensing and Industry Affairs cc: See Page 2

U.S. Nuclear Regulatory Commission Page 2 March 20, 2003 cc (Enclosure):

NRC Resident Inspector (Enclosure provided by Browns Ferry Nuclear Plant BFN Document Control Unit) 10833 Shaw Road Athens, Alabama 35611-6970 Mr. Stephen J. Cahill, Branch Chief (2 Enclosures)

U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street S.W., Suite 23T85 Atlanta, Georgia 30303-8931 Mr. Kahtan N. Jabbour, Senior Project Manager (w/o Enclosure)

U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9)

Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, Maryland 20852-2738

U.S. Nuclear Regulatory Commission Page 3 March 20, 2003 DTL:JEW:BAB cc (w/o Enclosure):

T. W. Cornelius, PAB 2K-BFN B. K. Marks, LP 6B-C A. S. Bhatnagar, PAB 1E-BFN EDMS-K S/LIC/SUBMIT/OPERATOR/EPIP030320.doc

ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 EMERGENCY PLAN IMPLEMENTING PROCEDURE (EPIP) REVISIONS EPIP 1 TOC, SECTIONS II-1.0, II-3.0, III-1.0, AND III-3.0 SEE ATTACHED

GENERAL REVISIONS FILING INSTRUCTIONS FILE DOCUMENTS AS FOLLOWS:

PAGES TO BE REMOVED PAGES TO BE INSERTED TOC, Revision 33 TOC, Revision 34 Section II-1.0, Revision 30 Section II-1.0, Revision 31 Section II-3.0, Revision 29 Section II-3.0, Revision 30 Section III-1.0, Revision 30 Section III-1.0, Revision 31 Section III-3.0, Revision 29 Section III-3.0, Revision 30