ML030800541
| ML030800541 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 11/14/2002 |
| From: | Paul Krohn NRC/RGN-III |
| To: | Caldwell R NRC/RGN-III |
| References | |
| FOIA/PA-2003-0094 | |
| Download: ML030800541 (1) | |
Text
Michel Knowki
-One oreReviionPagie1 From:
To:
Date:
Subject:
Paul Krohn Jlobert-Caldwell,
-7 On1J4M02e Re9vs.i One More Revision
- Bob, One more update based on a comment I got from Ken O'Brien (a DRS member of the SIT). It would be more accurate to update one of the risk assessment slides to read;
- The recirculation orifices have been installed on a staggered basis.
-Ul TDAFW Pump recirc orifice installed October 2002.
-Both MDAFW Pumps recirc orifices installed in November2001.
-Unit 2 TDAFW Pump recirc orifice installed in May 2002.
-Common Mode failure exposure time for Unit 1 is - 1 month. Common Mode failure exposure time Unit 2 is - 5 months.
This better portrays the time when the 3 AFWPs capable of feeding each Unit all had the recirc orifices installed that were susceptible to plugging. The previous numbers of 23 months etc, may convey a false sense of the common mode failure exposure time.
For you consideration.
Paul Krohn, SRI Point Beach CC:
Castanedo, Michelle; Kunowski, Michael; Morris, R. Michael; O'Brien, Kenneth; Riemer, Kenneth; Spaulding, Deirdre SMichael Kunowvski - One More Revision