E-mail from Krohn to Caidwell, Re One More Revision. One More Update Based on Comment from Ken Obrien Re Risk Assessment Slide
ML030800541
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/14/2002
From: Paul Krohn
NRC/RGN-III
To: Caldwell R
NRC/RGN-III
References
FOIA/PA-2003-0094
Download: ML030800541 (1)


Text

Michel Knowki

-One oreReviionPagie1 From:

To:

Date:

Subject:

Paul Krohn Jlobert-Caldwell,

-7 On1J4M02e Re9vs.i One More Revision

Bob, One more update based on a comment I got from Ken O'Brien (a DRS member of the SIT). It would be more accurate to update one of the risk assessment slides to read;
  1. The recirculation orifices have been installed on a staggered basis.

-Ul TDAFW Pump recirc orifice installed October 2002.

-Both MDAFW Pumps recirc orifices installed in November2001.

-Unit 2 TDAFW Pump recirc orifice installed in May 2002.

-Common Mode failure exposure time for Unit 1 is - 1 month. Common Mode failure exposure time Unit 2 is - 5 months.

This better portrays the time when the 3 AFWPs capable of feeding each Unit all had the recirc orifices installed that were susceptible to plugging. The previous numbers of 23 months etc, may convey a false sense of the common mode failure exposure time.

For you consideration.

Paul Krohn, SRI Point Beach CC:

Castanedo, Michelle; Kunowski, Michael; Morris, R. Michael; O'Brien, Kenneth; Riemer, Kenneth; Spaulding, Deirdre SMichael Kunowvski - One More Revision