Procedure List and Graphs of Simulator Runs
ML030800400
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/01/2002
From: Sokol K
Nuclear Management Co
To: Schooh D
- No Known Affiliation, Office of Nuclear Reactor Regulation
References
FOIA/PA-2003-0094
Download: ML030800400 (6)


Text

To: Duane Schoon Procedure that are being changed via Temp Change Process to address the AFW recirc orifice issue.

Procedure # Applicable unit EOP 0 1 &2 EOP 0.0 1 &2 EOP 0.1 1 &2 EOP 0.2 1 &2 EOP 0.3 1 &2 EOP 0.4 1 &2 EOP 1.0 1 &2 EOP 1.1 1 &2 EOP 1.2 1 &2 EOP 1.3 1 &2 EOP 1.4 1 &2 EOP 2 1 &2 EOP 3 1 &2 EOP 3.1 1 &2 EOP 3.2 1 &2 EOP 3.3 1 &2 ECA 0.0 1 &2 ECA 0.1 1 &2 ECA 0.2 1 &2 ECA 1.1 1 &2 ECA 1.2 1 &2 ECA 2.1 1 &2 ECA 3.1 1 &2 ECA 3.2 1 &2 ECA 3.3 1 &2 CSP S.1 1 &2 CSP S.2 1 &2 CSP C.1 1 &2 CSP C.2 1 &2 CSP C.3 1 &2 CSP H.1 1 &2 CSP H.2 1 &2 CSP H.3 1 &2 CSP HA 1 &2 CSP H.5 1 &2 CSP P.1 1 &2 CSP P.2 1 &2

CSP Z.1 1 &2 CSP Z.2 1 &2 CSP Z.3 1 &2 CSP 1.1 1 &2 CSP 1.2 1 &2 CSP 1.3 1 &2 SEP 2.1 1 &2 SEP 2.2 1 &2 SEP 3.0 1 &2 S

AOP 3.0 1 &2 AOP 10 Common to both units AOP 10A Common to both units AOP 23 1 &2 t - 4A

ýOv

(

01 62A Common to both units 01 62B Common to both units Total procedures being changed = 100 procedures Ken Sokol 10/30/2002 11/1/2002 update The original count of procedures was off by 2 because I had listed CSP H.3 twice in this list. that has been corrected.

Additional procedures that we are revising are AOP 10B 1 &2 IT 8A 1 IT 9A 2 IT 10 common IT 10A common IT lOB common Ken Sokol 11/1/2002

AOP 108; "Safe to Cold Shutdown in Local Control"; Unit 1, Revision 3 AOP 23; "Establishing Alternate AFW Suction Supply"; Unit 1, Revision 0 SCR 2002-0458; "AFW minimum Flow Requirement Change to AOP, EOP, CSP, ECA, SEP, 01-1 NB Procedures"; Dated October 29, 2002 T

IT-08A; TCold Start of Turbine-Driven Auxiliary Feed Pump and Valve Test (Quarterly)

Unit 1; Unit 1; Revision 29 IT-09A; "Cold Start of Turbine-Driven Auxiliary Feed Pump and Valve Test (Quarterly)

Unit 2; Unit 2; Revision 29 IT-1 0; "Test of Electric-Driven Auxiliary Feed Pumps and Valves (Quarterly)"; Unit 0; Revision 45 IT-1 OA; "Test of Electric-Driven Auxiliary Feed Pumps and Valves with flow to Unit 1 Steam Generators (Quartedy)"; Unit 1; Revision 13 IT-1 08; "Test of Electric-Driven Auxiliary Feed Pumps and Valves with flow to Unit 2 Steam Generators (Quarterly)"; Unit 2; Revision 12 Safety Monitor Calculations; Unit 1; date November 1, 2002 Safety Monitor Calculations; Unit 2; date November 1, 2002 Safety Monitor Calculations; Unit 1; date November 4, 2002 Safety Monitor Calculations; Unit 2; date November 4, 2002 LER 2001-005-00; AFW Instrument Air LER

Transient Test EPALN1 102 r 14 007 =f3 Fw DIS/-4A96r-FLow 250 200 150 I- ft:4007 - Run 1 100 50 0

0 2000 sidf'4000 6000 8000 10000 12000 14000 16000 18000 11/'12002 12:24 PM

Transient Test EPALN1 102 rý ýj = t?3gL Diee a4~

200 1

180 160 140

"-I 120 I- ft:4014 - Run 1 100 80 60 40 20 0

8000 10000 12000 14000 16000 18000 0 2000 ýf*(g 4000 6000

,5rS4A 11/7/2002 12:24 PM

Transient Test EPALN 102 250 200 150

-ft:'4002 - Run 1 100 50 0

0 2000 4000 6000 8000 10000 12000" 14000 1 6000 18000 11/7/2002 12:24 PM