ML030800400

From kanterella
Jump to navigation Jump to search
Procedure List and Graphs of Simulator Runs
ML030800400
Person / Time
Site: Point Beach  
Issue date: 11/01/2002
From: Sokol K
Nuclear Management Co
To: Schooh D
- No Known Affiliation, Office of Nuclear Reactor Regulation
References
FOIA/PA-2003-0094
Download: ML030800400 (6)


Text

To: Duane Schoon Procedure that are being changed via Temp Change Process to address the AFW recirc orifice issue.

Procedure #

EOP 0 EOP 0.0 EOP 0.1 EOP 0.2 EOP 0.3 EOP 0.4 EOP 1.0 EOP 1.1 EOP 1.2 EOP 1.3 EOP 1.4 EOP 2 EOP 3 EOP 3.1 EOP 3.2 EOP 3.3 ECA 0.0 ECA 0.1 ECA 0.2 ECA 1.1 ECA 1.2 ECA 2.1 ECA 3.1 ECA 3.2 ECA 3.3 CSP S.1 CSP S.2 CSP C.1 CSP C.2 CSP C.3 CSP H.1 CSP H.2 CSP H.3 CSP HA CSP H.5 CSP P.1 CSP P.2 Applicable unit 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2

CSP Z. 1 CSP Z.2 CSP Z.3 CSP 1. 1 CSP 1.2 CSP 1.3 SEP 2.1 SEP 2.2 SEP 3.0 AOP 3.0 AOP 10 AOP 10A AOP 23 01 62A 01 62B 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 1 &2 Common to both units Common to both units 1 &2 Common to both units Common to both units S

ýOv t - 4A

(

Total procedures being changed = 100 procedures Ken Sokol 10/30/2002 11/1/2002 update The original count of procedures was off by 2 because I had listed CSP H.3 twice in this list. that has been corrected.

Additional procedures that we are revising are AOP 10B 1 &2 IT 8A 1

IT 9A 2

IT 10 common IT 10A common IT lOB common Ken Sokol 11/1/2002

AOP 108; "Safe to Cold Shutdown in Local Control"; Unit 1, Revision 3 AOP 23; "Establishing Alternate AFW Suction Supply"; Unit 1, Revision 0 SCR 2002-0458; "AFW minimum Flow Requirement Change to AOP, EOP, CSP, ECA, SEP, 01-1 NB Procedures"; Dated October 29, 2002 T

IT-08A; TCold Start of Turbine-Driven Auxiliary Feed Pump and Valve Test (Quarterly)

Unit 1; Unit 1; Revision 29 IT-09A; "Cold Start of Turbine-Driven Auxiliary Feed Pump and Valve Test (Quarterly)

Unit 2; Unit 2; Revision 29 IT-1 0; "Test of Electric-Driven Auxiliary Feed Pumps and Valves (Quarterly)"; Unit 0; Revision 45 IT-1 OA; "Test of Electric-Driven Auxiliary Feed Pumps and Valves with flow to Unit 1 Steam Generators (Quartedy)"; Unit 1; Revision 13 IT-1 08; "Test of Electric-Driven Auxiliary Feed Pumps and Valves with flow to Unit 2 Steam Generators (Quarterly)"; Unit 2; Revision 12 Safety Monitor Calculations; Unit 1; date November 1, 2002 Safety Monitor Calculations; Unit 2; date November 1, 2002 Safety Monitor Calculations; Unit 1; date November 4, 2002 Safety Monitor Calculations; Unit 2; date November 4, 2002 LER 2001-005-00; AFW Instrument Air LER

Transient Test EPALN1 102 r 14 007 = f3 Fw I -

ft:4007 - Run 1 18000 11/'12002 12:24 PM 250 200 150 100 50 0

0 2000 sidf'4000 6000 8000 10000 12000 14000 16000 DIS/-4A96r-FLow

Transient Test EPALN1 102 rý

ýj

= t?3gL Diee a4~

1 200 180 160 140 120 100 80 60 40 20 0

6000 8000 10000 I-ft:4014 - Run 1 12000 14000 16000 18000 11/7/2002 12:24 PM 2000 ýf*(g 4000

,5 rS4A 0

"-I

Transient Test EPALN 102 250 200 150 100 50 0

11/7/2002 12:24 PM

-ft:'4002 - Run 1 6000 18000 0

2000 4000 6000 8000 10000 12000" 14000 1