Letters to Interested Members of the Public Inviting Them to 04/01/2003, Public Meeting on the Early Site Permit Review Process for North Anna
ML030790244
Person / Time
Site: North Anna, PROJ0719  Dominion icon.png
Issue date: 03/21/2003
From: Lyons J
NRC/NRR/NRLPO
To: Aven T, Dunesia Clark, Cobb M, Dellorco A, Dezern P, Dusinberre I, Larry Jones, Kersey M, Kogle J, Melvin M, Murphey B, Musser E, Root G, Root M, Thorp B, Tilley R, Trent P
- No Known Affiliation, Lake Anna Observer, Oak Ridge Civic Association, Sierra Club, Town of Louisa, VA, Virginia Council on Indians, Winwood Coves Property Owners Association
Scott M L, NRR/ADIP/NRLPO, 301-415-1421
References
+reviewedDominionESP, +reviewedmls
Download: ML030790244 (25)


Text

March 21, 2003 Ms. Ione Dusinberre 138 Twin Oaks Road Louisa, Virginia 23093

Dear Ms. Dusinberre:

The purpose of this letter is to invite you, as an individual who may have an interest in activities related to the North Anna Power Station, to public meetings on April 1, 2003, with representatives of the U.S. Nuclear Regulatory Commission (NRC). The purpose of the meetings is to discuss the review process for Dominion Energys (Dominion) early site permit (ESP) application for the North Anna site. Dominion is expected to file an ESP application with the NRC in September 2003 for a new reactor or reactors at the North Anna site. At the meetings, the NRC will discuss the NRC ESP review process, as well as the opportunities for public involvement in that process for the North Anna site.

Under the NRCs regulations in Part 52 of Title 10 of the Code of Federal Regulations, Early Site Permits, Standard Design Certifications, and Combined Licenses for Nuclear Power Plants, the NRC can issue an ESP for approval of one or more sites for possible future construction of a nuclear power plant or plants. The issuance of an ESP is separate from the issuance of a license to construct or operate a nuclear power plant. The review of an ESP addresses site safety issues, environmental protection issues, and plans for coping with emergencies, independent of the review of a specific nuclear plant design. Should an ESP be issued for North Anna, Dominion could reference the ESP in seeking, at some time during the term of the ESP, a license to construct or operate a nuclear power plant or plants on the site.

The public meetings will take place on April 1, 2003, from 2:00 p.m. to 4:30 p.m. and from 7:00 p.m. to 9:30 p.m., at the Louisa County Library, 881 Davis Highway, Mineral, VA. The meeting notice for the public meetings is enclosed for your information. If you have any questions regarding the meetings, please contact Mike Scott of my staff by e-mail at mls3@nrc.gov or by telephone at 301-415-1421.

Sincerely,

/RA/

James E. Lyons, Director New Reactor Licensing Project Office Office of Nuclear Reactor Regulation cc: R. Trojanowski, REG II Project No. 719

Enclosure:

1. List of Invited Interested Members of the Public
2. Public Meeting Notice

March 21, 2003 Ms. Ione Dusinberre 138 Twin Oaks Road Louisa, Virginia 23093

Dear Ms. Dusinberre:

The purpose of this letter is to invite you, as an individual who may have an interest in activities related to the North Anna Power Station, to public meetings on April 1, 2003, with representatives of the U.S. Nuclear Regulatory Commission (NRC). The purpose of the meetings is to discuss the review process for Dominion Energys (Dominion) early site permit (ESP) application for the North Anna site. Dominion is expected to file an ESP application with the NRC in September 2003 for a new reactor or reactors at the North Anna site. At the meetings, the NRC will discuss the NRC ESP review process, as well as the opportunities for public involvement in that process for the North Anna site.

Under the NRCs regulations in Part 52 of Title 10 of the Code of Federal Regulations, Early Site Permits, Standard Design Certifications, and Combined Licenses for Nuclear Power Plants, the NRC can issue an ESP for approval of one or more sites for possible future construction of a nuclear power plant or plants. The issuance of an ESP is separate from the issuance of a license to construct or operate a nuclear power plant. The review of an ESP addresses site safety issues, environmental protection issues, and plans for coping with emergencies, independent of the review of a specific nuclear plant design. Should an ESP be issued for North Anna, Dominion could reference the ESP in seeking, at some time during the term of the ESP, a license to construct or operate a nuclear power plant or plants on the site.

The public meetings will take place on April 1, 2003, from 2:00 p.m. to 4:30 p.m. and from 7:00 p.m. to 9:30 p.m., at the Louisa County Library, 881 Davis Highway, Mineral, VA. The meeting notice for the public meetings is enclosed for your information. If you have any questions regarding the meetings, please contact Mike Scott of my staff by e-mail at mls3@nrc.gov or by telephone at 301-415-1421.

Sincerely,

/RA/

James E. Lyons, Director New Reactor Licensing Project Office Office of Nuclear Reactor Regulation cc: R. Trojanowski, REG II Project No. 719

Enclosure:

1. List of Invited Interested Members of the Public
2. Public Meeting Notice Distribution: See attached list Accession No. ML030790244 DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML030790244.wpd OFFICE NRR/NRLPO NRR/NRLPO NRR/NRLPO NAME MScott-RJenkins for: MGamberoni-JMS1 for:

JLyons DATE 3/20/03 3/20/03 3/20/03 OFFICIAL RECORD COPY

Distribution for Letters to Multiple Addressees dated March 21, 2003 Hard Copy NRLPO Rdg.

MScott SKoenick RJenkins MGamberoni JLyons E-mail PUBLIC RidsNrrOD (S. Collins)

RidsNrrAdip (R. Borchardt)

RidsOgcRp NRLPO Group Invited Interested Members of the Public Ione Dusinberre 138 Twin Oaks Road Louisa, Virginia 23093 Edna H. Musser 6224 Fredericks Hall Road Mineral, Virginia 23117 Paul Trent 225 Landover Road Troy, Virginia 22974 Matthew L. Kersey, Jr.

Town of Louisa, Industrial Development Authority 225 Fredericksburg Avenue Louisa, Virginia 23093 Luther Jones 98 Eveland Drive Bumpass, Virginia 23024 Michael Melvin 297 Deerwood Drive Gum Spring, Virginia 23065 Tom Aven 297 Deerwood Drive Gum Spring, Virginia 23065 Bill Murphey 449 Lakeway Road Mineral, Virginia 23117 Ms. Reeva Tilley, Chairman Virginia Council on Indians P.O. Box 1475 Richmond, Virginia 23218 Pat DeZern Sierra Club of Virginia 6 North 6th Street, Suite 102 Richmond, Virginia 23219 James R. Kogle Winwood Coves Property Owners Assn.

425 Lakeway Road Mineral, Virginia 23117 Dick Clark President, Oak Ridge Civic Association 11679 Havenner Road Fairfax Station, Virginia 22039 Marione M. Cobb 138 Twin Oaks Road Louisa, Virginia 23093 Adriane Dellorco 138 Twin Oaks Road Louisa, Virginia 23093 Gerald W. Root 191 Lakewood Landing Drive Bumpass, Virginia 23024 Marilyn Root Lake Anna Observer 191 Lakewood Landing Drive Bumpass, Virginia 23024 Mr. Ben Thorp 815 Arlington Circle Richmond, VA 23229 February 28, 2003 MEMORANDUM TO: Marsha Gamberoni, Deputy Director New Reactor Licensing Project Office Office of Nuclear Reactor Regulation FROM:

Michael L. Scott, Project Manager /RA J. N. Wilson for:/

New Reactor Licensing Project Office Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING TO DISCUSS THE REVIEW PROCESS FOR DOMINION ENERGYS EARLY SITE PERMIT (ESP)

APPLICATION FOR THE NORTH ANNA SITE (TAC NO. MB5383)

DATE & TIME:

Tuesday, April 1, 2003 First Session: 2:00 p.m. - 4:30 p.m.

Second Session: 7:00 p.m. - 9:30 p.m.

LOCATION:

Louisa County Library 881 Davis Highway Mineral, VA 23117 CATEGORY 3:*

This is a Category 3 meeting. The public is invited to participate in this meeting by providing comments and asking questions throughout the meeting.

PARTICIPANTS:

Participants from the NRC include members from the Office of Nuclear Reactor Regulation and the Office of the General Counsel.

NRC F. Cameron, OGC J. Lyons, NRR M. Scott, NRR A. Kugler, NRR PURPOSE:

To discuss the review process for the early site permit (ESP) application for the North Anna Site. These meetings will provide information to the public on the NRC ESP review process, as well as the opportunities for public involvement in that process for the North Anna site.

M. Gamberoni Both formal sessions will be preceded by an informal open house beginning one hour prior to each session for those who wish to attend.

The open house will provide members of the public with an opportunity to talk informally one-on-one with the NRC staff.

MEETING CONTACT:

Michael L. Scott, NRR 301-415-1421, mls3@nrc.gov

  • Commissions Policy Statement on Enhancing Public Participation in NRC Meetings, 67 Federal Register 36920, May 28, 2002 Attachments:
1. Agenda
2. FR Notice Project No. 719 cc: See next page

AGENDA FOR PUBLIC MEETINGS TO DISCUSS EARLY SITE PERMIT (ESP) REVIEW FOR NORTH ANNA SITE ESP APPLICATION TUESDAY, APRIL 1, 2003 Two Meeting Sessions* - 2:00 p.m. to 4:30 p.m. and 7:00 p.m. to 9:30 p.m.

Welcome and Purpose of Meeting - F. Cameron Overview of the NRC - J. Lyons Overview of the Licensing Process (10 CFR Part 52) - J. Lyons Overview of Early Site Permit Review Process - M. Scott Questions and Answers - F. Cameron Overview of Opportunities for Public Involvement - M. Scott Questions and Answers - F. Cameron Closing - F. Cameron

  • The NRC staff will host informal discussions one hour prior to each meeting session. No comments on the proposed Dominion early site permit application will be accepted during the informal discussions or the formal sessions. To be considered, comments must be provided either at the transcribed public meetings after the filing of the ESP application or in writing, as described during the subject information meeting (see agenda, above).

[7590-01-P]

U. S. NUCLEAR REGULATORY COMMISSION Notice of Public Meeting Pre-application Early Site Permit Meetings for the North Anna Site AGENCY:

U.S. Nuclear Regulatory Commission ACTION:

Notice of public meetings in Mineral, Virginia

SUMMARY

The U. S. Nuclear Regulatory Commission (NRC) will hold facilitated meetings on April 1, 2003, to provide information to the public on the NRC Early Site Permit (ESP) review process, as well as the opportunities for public involvement in that process for the North Anna site. Dominion Energy, Incorporated (Dominion) is expected to file an ESP in September 2003 for a new reactor or reactors at the North Anna site.

DATE/TIME: The meetings will be held on Tuesday, April 1, 2003, beginning with the first meeting from 2:00 p.m. through 4:30 p.m., followed by a later meeting from 7:00 p.m. through 9:30 p.m. Each meeting will be preceded by an open house one hour prior to the meeting to allow for individual discussions with staff members.

LOCATION: Louisa County Library, 881 Davis Highway, Mineral Virginia FOR FURTHER INFORMATION CONTACT: Francis X. Cameron, Special Council for Public Liaison, Office of General Council, U.S. Nuclear Regulatory Commission, Washington, D.C.

20555-0001, or by telephone: (301) 415-1642 or e-mail: fxc@nrc.gov. Mr. Cameron will facilitate the meeting.

SUPPLEMENTARY INFORMATION: Additional information can be obtained from the website (http://nrcweb.nrc.gov:300/reactors/new-licensing/license-reviews/esp.html), or by contacting Mr. Michael Scott at (301) 415-1421, or via e-mail at mls3@nrc.gov.

Dated at Rockville, Maryland this 26th day of February 2003.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

James E. Lyons, Director New Reactor Licensing Project Office Office of Nuclear Reactor Regulation

March 21, 2003 Ms. Edna H. Musser 6224 Fredericks Hall Road Mineral, Virginia 23117

Dear Ms. Musser:

The purpose of this letter is to invite you, as an individual who may have an interest in activities related to the North Anna Power Station, to public meetings on April 1, 2003, with representatives of the U.S. Nuclear Regulatory Commission (NRC). The purpose of the meetings is to discuss the review process for Dominion Energys (Dominion) early site permit (ESP) application for the North Anna site. Dominion is expected to file an ESP application with the NRC in September 2003 for a new reactor or reactors at the North Anna site. At the meetings, the NRC will discuss the NRC ESP review process, as well as the opportunities for public involvement in that process for the North Anna site.

Under the NRCs regulations in Part 52 of Title 10 of the Code of Federal Regulations, Early Site Permits, Standard Design Certifications, and Combined Licenses for Nuclear Power Plants, the NRC can issue an ESP for approval of one or more sites for possible future construction of a nuclear power plant or plants. The issuance of an ESP is separate from the issuance of a license to construct or operate a nuclear power plant. The review of an ESP addresses site safety issues, environmental protection issues, and plans for coping with emergencies, independent of the review of a specific nuclear plant design. Should an ESP be issued for North Anna, Dominion could reference the ESP in seeking, at some time during the term of the ESP, a license to construct or operate a nuclear power plant or plants on the site.

The public meetings will take place on April 1, 2003, from 2:00 p.m. to 4:30 p.m. and from 7:00 p.m. to 9:30 p.m., at the Louisa County Library, 881 Davis Highway, Mineral, VA. The meeting notice for the public meetings is enclosed for your information. If you have any questions regarding the meetings, please contact Mike Scott of my staff by e-mail at mls3@nrc.gov or by telephone at 301-415-1421.

Sincerely,

/RA/

James E. Lyons, Director New Reactor Licensing Project Office Office of Nuclear Reactor Regulation cc: R. Trojanowski, REG II Project No. 719

Enclosure:

1. List of Invited Interested Members of the Public
2. Public Meeting Notice

March 21, 2003 Mr. Paul Trent 225 Landover Road Troy, Virginia 22974

Dear Mr. Trent:

The purpose of this letter is to invite you, as an individual who may have an interest in activities related to the North Anna Power Station, to public meetings on April 1, 2003, with representatives of the U.S. Nuclear Regulatory Commission (NRC). The purpose of the meetings is to discuss the review process for Dominion Energys (Dominion) early site permit (ESP) application for the North Anna site. Dominion is expected to file an ESP application with the NRC in September 2003 for a new reactor or reactors at the North Anna site. At the meetings, the NRC will discuss the NRC ESP review process, as well as the opportunities for public involvement in that process for the North Anna site.

Under the NRCs regulations in Part 52 of Title 10 of the Code of Federal Regulations, Early Site Permits, Standard Design Certifications, and Combined Licenses for Nuclear Power Plants, the NRC can issue an ESP for approval of one or more sites for possible future construction of a nuclear power plant or plants. The issuance of an ESP is separate from the issuance of a license to construct or operate a nuclear power plant. The review of an ESP addresses site safety issues, environmental protection issues, and plans for coping with emergencies, independent of the review of a specific nuclear plant design. Should an ESP be issued for North Anna, Dominion could reference the ESP in seeking, at some time during the term of the ESP, a license to construct or operate a nuclear power plant or plants on the site.

The public meetings will take place on April 1, 2003, from 2:00 p.m. to 4:30 p.m. and from 7:00 p.m. to 9:30 p.m., at the Louisa County Library, 881 Davis Highway, Mineral, VA. The meeting notice for the public meetings is enclosed for your information. If you have any questions regarding the meetings, please contact Mike Scott of my staff by e-mail at mls3@nrc.gov or by telephone at 301-415-1421.

Sincerely,

/RA/

James E. Lyons, Director New Reactor Licensing Project Office Office of Nuclear Reactor Regulation cc: R. Trojanowski, REG II Project No. 719

Enclosure:

1. List of Invited Interested Members of the Public
2. Public Meeting Notice

March 21, 2003 Mr. Matthew L. Kersey, Jr.

Town of Louisa Industrial Development Authority 225 Fredericksburg Avenue Louisa, Virginia 23093

Dear Mr. Kersey:

The purpose of this letter is to invite you, as an individual who may have an interest in activities related to the North Anna Power Station, to public meetings on April 1, 2003, with representatives of the U.S. Nuclear Regulatory Commission (NRC). The purpose of the meetings is to discuss the review process for Dominion Energys (Dominion) early site permit (ESP) application for the North Anna site. Dominion is expected to file an ESP application with the NRC in September 2003 for a new reactor or reactors at the North Anna site. At the meetings, the NRC will discuss the NRC ESP review process, as well as the opportunities for public involvement in that process for the North Anna site.

Under the NRCs regulations in Part 52 of Title 10 of the Code of Federal Regulations, Early Site Permits, Standard Design Certifications, and Combined Licenses for Nuclear Power Plants, the NRC can issue an ESP for approval of one or more sites for possible future construction of a nuclear power plant or plants. The issuance of an ESP is separate from the issuance of a license to construct or operate a nuclear power plant. The review of an ESP addresses site safety issues, environmental protection issues, and plans for coping with emergencies, independent of the review of a specific nuclear plant design. Should an ESP be issued for North Anna, Dominion could reference the ESP in seeking, at some time during the term of the ESP, a license to construct or operate a nuclear power plant or plants on the site.

The public meetings will take place on April 1, 2003, from 2:00 p.m. to 4:30 p.m. and from 7:00 p.m. to 9:30 p.m., at the Louisa County Library, 881 Davis Highway, Mineral, VA. The meeting notice for the public meetings is enclosed for your information. If you have any questions regarding the meetings, please contact Mike Scott of my staff by e-mail at mls3@nrc.gov or by telephone at 301-415-1421.

Sincerely,

/RA/

James E. Lyons, Director New Reactor Licensing Project Office Office of Nuclear Reactor Regulation cc: R. Trojanowski, REG II Project No. 719

Enclosure:

1. List of Invited Interested Members of the Public
2. Public Meeting Notice

March 21, 2003 Mr. Luther Jones 98 Eveland Drive Bumpass, Virginia 23024

Dear Mr. Jones:

The purpose of this letter is to invite you, as an individual who may have an interest in activities related to the North Anna Power Station, to public meetings on April 1, 2003, with representatives of the U.S. Nuclear Regulatory Commission (NRC). The purpose of the meetings is to discuss the review process for Dominion Energys (Dominion) early site permit (ESP) application for the North Anna site. Dominion is expected to file an ESP application with the NRC in September 2003 for a new reactor or reactors at the North Anna site. At the meetings, the NRC will discuss the NRC ESP review process, as well as the opportunities for public involvement in that process for the North Anna site.

Under the NRCs regulations in Part 52 of Title 10 of the Code of Federal Regulations, Early Site Permits, Standard Design Certifications, and Combined Licenses for Nuclear Power Plants, the NRC can issue an ESP for approval of one or more sites for possible future construction of a nuclear power plant or plants. The issuance of an ESP is separate from the issuance of a license to construct or operate a nuclear power plant. The review of an ESP addresses site safety issues, environmental protection issues, and plans for coping with emergencies, independent of the review of a specific nuclear plant design. Should an ESP be issued for North Anna, Dominion could reference the ESP in seeking, at some time during the term of the ESP, a license to construct or operate a nuclear power plant or plants on the site.

The public meetings will take place on April 1, 2003, from 2:00 p.m. to 4:30 p.m. and from 7:00 p.m. to 9:30 p.m., at the Louisa County Library, 881 Davis Highway, Mineral, VA. The meeting notice for the public meetings is enclosed for your information. If you have any questions regarding the meetings, please contact Mike Scott of my staff by e-mail at mls3@nrc.gov or by telephone at 301-415-1421.

Sincerely,

/RA/

James E. Lyons, Director New Reactor Licensing Project Office Office of Nuclear Reactor Regulation cc: R. Trojanowski, REG II Project No. 719

Enclosure:

1. List of Invited Interested Members of the Public
2. Public Meeting Notice

March 21, 2003 Mr. Michael Melvin 297 Deerwood Drive Gum Spring, Virginia 23065

Dear Mr. Melvin:

The purpose of this letter is to invite you, as an individual who may have an interest in activities related to the North Anna Power Station, to public meetings on April 1, 2003, with representatives of the U.S. Nuclear Regulatory Commission (NRC). The purpose of the meetings is to discuss the review process for Dominion Energys (Dominion) early site permit (ESP) application for the North Anna site. Dominion is expected to file an ESP application with the NRC in September 2003 for a new reactor or reactors at the North Anna site. At the meetings, the NRC will discuss the NRC ESP review process, as well as the opportunities for public involvement in that process for the North Anna site.

Under the NRCs regulations in Part 52 of Title 10 of the Code of Federal Regulations, Early Site Permits, Standard Design Certifications, and Combined Licenses for Nuclear Power Plants, the NRC can issue an ESP for approval of one or more sites for possible future construction of a nuclear power plant or plants. The issuance of an ESP is separate from the issuance of a license to construct or operate a nuclear power plant. The review of an ESP addresses site safety issues, environmental protection issues, and plans for coping with emergencies, independent of the review of a specific nuclear plant design. Should an ESP be issued for North Anna, Dominion could reference the ESP in seeking, at some time during the term of the ESP, a license to construct or operate a nuclear power plant or plants on the site.

The public meetings will take place on April 1, 2003, from 2:00 p.m. to 4:30 p.m. and from 7:00 p.m. to 9:30 p.m., at the Louisa County Library, 881 Davis Highway, Mineral, VA. The meeting notice for the public meetings is enclosed for your information. If you have any questions regarding the meetings, please contact Mike Scott of my staff by e-mail at mls3@nrc.gov or by telephone at 301-415-1421.

Sincerely,

/RA/

James E. Lyons, Director New Reactor Licensing Project Office Office of Nuclear Reactor Regulation cc: R. Trojanowski, REG II Project No. 719

Enclosure:

1. List of Invited Interested Members of the Public
2. Public Meeting Notice

March 21, 2003 Mr. Tom Aven 297 Deerwood Drive Gum Spring, Virginia 23065

Dear Mr. Aven:

The purpose of this letter is to invite you, as an individual who may have an interest in activities related to the North Anna Power Station, to public meetings on April 1, 2003, with representatives of the U.S. Nuclear Regulatory Commission (NRC). The purpose of the meetings is to discuss the review process for Dominion Energys (Dominion) early site permit (ESP) application for the North Anna site. Dominion is expected to file an ESP application with the NRC in September 2003 for a new reactor or reactors at the North Anna site. At the meetings, the NRC will discuss the NRC ESP review process, as well as the opportunities for public involvement in that process for the North Anna site.

Under the NRCs regulations in Part 52 of Title 10 of the Code of Federal Regulations, Early Site Permits, Standard Design Certifications, and Combined Licenses for Nuclear Power Plants, the NRC can issue an ESP for approval of one or more sites for possible future construction of a nuclear power plant or plants. The issuance of an ESP is separate from the issuance of a license to construct or operate a nuclear power plant. The review of an ESP addresses site safety issues, environmental protection issues, and plans for coping with emergencies, independent of the review of a specific nuclear plant design. Should an ESP be issued for North Anna, Dominion could reference the ESP in seeking, at some time during the term of the ESP, a license to construct or operate a nuclear power plant or plants on the site.

The public meetings will take place on April 1, 2003, from 2:00 p.m. to 4:30 p.m. and from 7:00 p.m. to 9:30 p.m., at the Louisa County Library, 881 Davis Highway, Mineral, VA. The meeting notice for the public meetings is enclosed for your information. If you have any questions regarding the meetings, please contact Mike Scott of my staff by e-mail at mls3@nrc.gov or by telephone at 301-415-1421.

Sincerely,

/RA/

James E. Lyons, Director New Reactor Licensing Project Office Office of Nuclear Reactor Regulation cc: R. Trojanowski, REG II Project No. 719

Enclosure:

1. List of Invited Interested Members of the Public
2. Public Meeting Notice

March 21, 2003 Mr. Bill Murphey 449 Lakeway Road Mineral, Virginia 23117

Dear Mr. Murphey:

The purpose of this letter is to invite you, as an individual who may have an interest in activities related to the North Anna Power Station, to public meetings on April 1, 2003, with representatives of the U.S. Nuclear Regulatory Commission (NRC). The purpose of the meetings is to discuss the review process for Dominion Energys (Dominion) early site permit (ESP) application for the North Anna site. Dominion is expected to file an ESP application with the NRC in September 2003 for a new reactor or reactors at the North Anna site. At the meetings, the NRC will discuss the NRC ESP review process, as well as the opportunities for public involvement in that process for the North Anna site.

Under the NRCs regulations in Part 52 of Title 10 of the Code of Federal Regulations, Early Site Permits, Standard Design Certifications, and Combined Licenses for Nuclear Power Plants, the NRC can issue an ESP for approval of one or more sites for possible future construction of a nuclear power plant or plants. The issuance of an ESP is separate from the issuance of a license to construct or operate a nuclear power plant. The review of an ESP addresses site safety issues, environmental protection issues, and plans for coping with emergencies, independent of the review of a specific nuclear plant design. Should an ESP be issued for North Anna, Dominion could reference the ESP in seeking, at some time during the term of the ESP, a license to construct or operate a nuclear power plant or plants on the site.

The public meetings will take place on April 1, 2003, from 2:00 p.m. to 4:30 p.m. and from 7:00 p.m. to 9:30 p.m., at the Louisa County Library, 881 Davis Highway, Mineral, VA. The meeting notice for the public meetings is enclosed for your information. If you have any questions regarding the meetings, please contact Mike Scott of my staff by e-mail at mls3@nrc.gov or by telephone at 301-415-1421.

Sincerely,

/RA/

James E. Lyons, Director New Reactor Licensing Project Office Office of Nuclear Reactor Regulation cc: R. Trojanowski, REG II Project No. 719

Enclosure:

1. List of Invited Interested Members of the Public
2. Public Meeting Notice

March 21, 2003 Ms. Reeva Tilley, Chairman Virginia Council on Indians P.O. Box 1475 Richmond, Virginia 23218

Dear Ms. Tilley:

The purpose of this letter is to invite you, as an individual who may have an interest in activities related to the North Anna Power Station, to public meetings on April 1, 2003, with representatives of the U.S. Nuclear Regulatory Commission (NRC). The purpose of the meetings is to discuss the review process for Dominion Energys (Dominion) early site permit (ESP) application for the North Anna site. Dominion is expected to file an ESP application with the NRC in September 2003 for a new reactor or reactors at the North Anna site. At the meetings, the NRC will discuss the NRC ESP review process, as well as the opportunities for public involvement in that process for the North Anna site.

Under the NRCs regulations in Part 52 of Title 10 of the Code of Federal Regulations, Early Site Permits, Standard Design Certifications, and Combined Licenses for Nuclear Power Plants, the NRC can issue an ESP for approval of one or more sites for possible future construction of a nuclear power plant or plants. The issuance of an ESP is separate from the issuance of a license to construct or operate a nuclear power plant. The review of an ESP addresses site safety issues, environmental protection issues, and plans for coping with emergencies, independent of the review of a specific nuclear plant design. Should an ESP be issued for North Anna, Dominion could reference the ESP in seeking, at some time during the term of the ESP, a license to construct or operate a nuclear power plant or plants on the site.

The public meetings will take place on April 1, 2003, from 2:00 p.m. to 4:30 p.m. and from 7:00 p.m. to 9:30 p.m., at the Louisa County Library, 881 Davis Highway, Mineral, VA. The meeting notice for the public meetings is enclosed for your information. If you have any questions regarding the meetings, please contact Mike Scott of my staff by e-mail at mls3@nrc.gov or by telephone at 301-415-1421.

Sincerely,

/RA/

James E. Lyons, Director New Reactor Licensing Project Office Office of Nuclear Reactor Regulation cc: R. Trojanowski, REG II Project No. 719

Enclosure:

1. List of Invited Interested Members of the Public
2. Public Meeting Notice

March 21, 2003 Ms. Pat DeZern Sierra Club of Virginia 6 North 6th Street, Suite 102 Richmond, Virginia 23219

Dear Ms. DeZern:

The purpose of this letter is to invite you, as an individual who may have an interest in activities related to the North Anna Power Station, to public meetings on April 1, 2003, with representatives of the U.S. Nuclear Regulatory Commission (NRC). The purpose of the meetings is to discuss the review process for Dominion Energys (Dominion) early site permit (ESP) application for the North Anna site. Dominion is expected to file an ESP application with the NRC in September 2003 for a new reactor or reactors at the North Anna site. At the meetings, the NRC will discuss the NRC ESP review process, as well as the opportunities for public involvement in that process for the North Anna site.

Under the NRCs regulations in Part 52 of Title 10 of the Code of Federal Regulations, Early Site Permits, Standard Design Certifications, and Combined Licenses for Nuclear Power Plants, the NRC can issue an ESP for approval of one or more sites for possible future construction of a nuclear power plant or plants. The issuance of an ESP is separate from the issuance of a license to construct or operate a nuclear power plant. The review of an ESP addresses site safety issues, environmental protection issues, and plans for coping with emergencies, independent of the review of a specific nuclear plant design. Should an ESP be issued for North Anna, Dominion could reference the ESP in seeking, at some time during the term of the ESP, a license to construct or operate a nuclear power plant or plants on the site.

The public meetings will take place on April 1, 2003, from 2:00 p.m. to 4:30 p.m. and from 7:00 p.m. to 9:30 p.m., at the Louisa County Library, 881 Davis Highway, Mineral, VA. The meeting notice for the public meetings is enclosed for your information. If you have any questions regarding the meetings, please contact Mike Scott of my staff by e-mail at mls3@nrc.gov or by telephone at 301-415-1421.

Sincerely,

/RA/

James E. Lyons, Director New Reactor Licensing Project Office Office of Nuclear Reactor Regulation cc: R. Trojanowski, REG II Project No. 719

Enclosure:

1. List of Invited Interested Members of the Public
2. Public Meeting Notice

March 21, 2003 Mr. James R. Kogle Winwood Coves Property Owners Assn.

425 Lakeway Road Mineral, Virginia 23117

Dear Mr. Kogle:

The purpose of this letter is to invite you, as an individual who may have an interest in activities related to the North Anna Power Station, to public meetings on April 1, 2003, with representatives of the U.S. Nuclear Regulatory Commission (NRC). The purpose of the meetings is to discuss the review process for Dominion Energys (Dominion) early site permit (ESP) application for the North Anna site. Dominion is expected to file an ESP application with the NRC in September 2003 for a new reactor or reactors at the North Anna site. At the meetings, the NRC will discuss the NRC ESP review process, as well as the opportunities for public involvement in that process for the North Anna site.

Under the NRCs regulations in Part 52 of Title 10 of the Code of Federal Regulations, Early Site Permits, Standard Design Certifications, and Combined Licenses for Nuclear Power Plants, the NRC can issue an ESP for approval of one or more sites for possible future construction of a nuclear power plant or plants. The issuance of an ESP is separate from the issuance of a license to construct or operate a nuclear power plant. The review of an ESP addresses site safety issues, environmental protection issues, and plans for coping with emergencies, independent of the review of a specific nuclear plant design. Should an ESP be issued for North Anna, Dominion could reference the ESP in seeking, at some time during the term of the ESP, a license to construct or operate a nuclear power plant or plants on the site.

The public meetings will take place on April 1, 2003, from 2:00 p.m. to 4:30 p.m. and from 7:00 p.m. to 9:30 p.m., at the Louisa County Library, 881 Davis Highway, Mineral, VA. The meeting notice for the public meetings is enclosed for your information. If you have any questions regarding the meetings, please contact Mike Scott of my staff by e-mail at mls3@nrc.gov or by telephone at 301-415-1421.

Sincerely,

/RA/

James E. Lyons, Director New Reactor Licensing Project Office Office of Nuclear Reactor Regulation cc: R. Trojanowski, REG II Project No. 719

Enclosure:

1. List of Invited Interested Members of the Public
2. Public Meeting Notice

March 21, 2003 Mr. Dick Clark President, Oak Ridge Civic Association 11679 Havenner Road Fairfax Station, Virginia 22039

Dear Mr. Clark:

The purpose of this letter is to invite you, as an individual who may have an interest in activities related to the North Anna Power Station, to public meetings on April 1, 2003, with representatives of the U.S. Nuclear Regulatory Commission (NRC). The purpose of the meetings is to discuss the review process for Dominion Energys (Dominion) early site permit (ESP) application for the North Anna site. Dominion is expected to file an ESP application with the NRC in September 2003 for a new reactor or reactors at the North Anna site. At the meetings, the NRC will discuss the NRC ESP review process, as well as the opportunities for public involvement in that process for the North Anna site.

Under the NRCs regulations in Part 52 of Title 10 of the Code of Federal Regulations, Early Site Permits, Standard Design Certifications, and Combined Licenses for Nuclear Power Plants, the NRC can issue an ESP for approval of one or more sites for possible future construction of a nuclear power plant or plants. The issuance of an ESP is separate from the issuance of a license to construct or operate a nuclear power plant. The review of an ESP addresses site safety issues, environmental protection issues, and plans for coping with emergencies, independent of the review of a specific nuclear plant design. Should an ESP be issued for North Anna, Dominion could reference the ESP in seeking, at some time during the term of the ESP, a license to construct or operate a nuclear power plant or plants on the site.

The public meetings will take place on April 1, 2003, from 2:00 p.m. to 4:30 p.m. and from 7:00 p.m. to 9:30 p.m., at the Louisa County Library, 881 Davis Highway, Mineral, VA. The meeting notice for the public meetings is enclosed for your information. If you have any questions regarding the meetings, please contact Mike Scott of my staff by e-mail at mls3@nrc.gov or by telephone at 301-415-1421.

Sincerely,

/RA/

James E. Lyons, Director New Reactor Licensing Project Office Office of Nuclear Reactor Regulation cc: R. Trojanowski, REG II Project No. 719

Enclosure:

1. List of Invited Interested Members of the Public
2. Public Meeting Notice

March 21, 2003 Ms. Marione M. Cobb 138 Twin Oaks Road Louisa, Virginia 23093

Dear Ms. Cobb:

The purpose of this letter is to invite you, as an individual who may have an interest in activities related to the North Anna Power Station, to public meetings on April 1, 2003, with representatives of the U.S. Nuclear Regulatory Commission (NRC). The purpose of the meetings is to discuss the review process for Dominion Energys (Dominion) early site permit (ESP) application for the North Anna site. Dominion is expected to file an ESP application with the NRC in September 2003 for a new reactor or reactors at the North Anna site. At the meetings, the NRC will discuss the NRC ESP review process, as well as the opportunities for public involvement in that process for the North Anna site.

Under the NRCs regulations in Part 52 of Title 10 of the Code of Federal Regulations, Early Site Permits, Standard Design Certifications, and Combined Licenses for Nuclear Power Plants, the NRC can issue an ESP for approval of one or more sites for possible future construction of a nuclear power plant or plants. The issuance of an ESP is separate from the issuance of a license to construct or operate a nuclear power plant. The review of an ESP addresses site safety issues, environmental protection issues, and plans for coping with emergencies, independent of the review of a specific nuclear plant design. Should an ESP be issued for North Anna, Dominion could reference the ESP in seeking, at some time during the term of the ESP, a license to construct or operate a nuclear power plant or plants on the site.

The public meetings will take place on April 1, 2003, from 2:00 p.m. to 4:30 p.m. and from 7:00 p.m. to 9:30 p.m., at the Louisa County Library, 881 Davis Highway, Mineral, VA. The meeting notice for the public meetings is enclosed for your information. If you have any questions regarding the meetings, please contact Mike Scott of my staff by e-mail at mls3@nrc.gov or by telephone at 301-415-1421.

Sincerely,

/RA/

James E. Lyons, Director New Reactor Licensing Project Office Office of Nuclear Reactor Regulation cc: R. Trojanowski, REG II Project No. 719

Enclosure:

1. List of Invited Interested Members of the Public
2. Public Meeting Notice

March 21, 2003 Ms. Adriane Dellorco 138 Twin Oaks Road Louisa, Virginia 23093

Dear Ms. Dellorco:

The purpose of this letter is to invite you, as an individual who may have an interest in activities related to the North Anna Power Station, to public meetings on April 1, 2003, with representatives of the U.S. Nuclear Regulatory Commission (NRC). The purpose of the meetings is to discuss the review process for Dominion Energys (Dominion) early site permit (ESP) application for the North Anna site. Dominion is expected to file an ESP application with the NRC in September 2003 for a new reactor or reactors at the North Anna site. At the meetings, the NRC will discuss the NRC ESP review process, as well as the opportunities for public involvement in that process for the North Anna site.

Under the NRCs regulations in Part 52 of Title 10 of the Code of Federal Regulations, Early Site Permits, Standard Design Certifications, and Combined Licenses for Nuclear Power Plants, the NRC can issue an ESP for approval of one or more sites for possible future construction of a nuclear power plant or plants. The issuance of an ESP is separate from the issuance of a license to construct or operate a nuclear power plant. The review of an ESP addresses site safety issues, environmental protection issues, and plans for coping with emergencies, independent of the review of a specific nuclear plant design. Should an ESP be issued for North Anna, Dominion could reference the ESP in seeking, at some time during the term of the ESP, a license to construct or operate a nuclear power plant or plants on the site.

The public meetings will take place on April 1, 2003, from 2:00 p.m. to 4:30 p.m. and from 7:00 p.m. to 9:30 p.m., at the Louisa County Library, 881 Davis Highway, Mineral, VA. The meeting notice for the public meetings is enclosed for your information. If you have any questions regarding the meetings, please contact Mike Scott of my staff by e-mail at mls3@nrc.gov or by telephone at 301-415-1421.

Sincerely,

/RA/

James E. Lyons, Director New Reactor Licensing Project Office Office of Nuclear Reactor Regulation cc: R. Trojanowski, REG II Project No. 719

Enclosure:

1. List of Invited Interested Members of the Public
2. Public Meeting Notice

March 21, 2003 Mr. Gerald W. Root 191 Lakewood Landing Drive Bumpass, Virginia 23024

Dear Mr. Root:

The purpose of this letter is to invite you, as an individual who may have an interest in activities related to the North Anna Power Station, to public meetings on April 1, 2003, with representatives of the U.S. Nuclear Regulatory Commission (NRC). The purpose of the meetings is to discuss the review process for Dominion Energys (Dominion) early site permit (ESP) application for the North Anna site. Dominion is expected to file an ESP application with the NRC in September 2003 for a new reactor or reactors at the North Anna site. At the meetings, the NRC will discuss the NRC ESP review process, as well as the opportunities for public involvement in that process for the North Anna site.

Under the NRCs regulations in Part 52 of Title 10 of the Code of Federal Regulations, Early Site Permits, Standard Design Certifications, and Combined Licenses for Nuclear Power Plants, the NRC can issue an ESP for approval of one or more sites for possible future construction of a nuclear power plant or plants. The issuance of an ESP is separate from the issuance of a license to construct or operate a nuclear power plant. The review of an ESP addresses site safety issues, environmental protection issues, and plans for coping with emergencies, independent of the review of a specific nuclear plant design. Should an ESP be issued for North Anna, Dominion could reference the ESP in seeking, at some time during the term of the ESP, a license to construct or operate a nuclear power plant or plants on the site.

The public meetings will take place on April 1, 2003, from 2:00 p.m. to 4:30 p.m. and from 7:00 p.m. to 9:30 p.m., at the Louisa County Library, 881 Davis Highway, Mineral, VA. The meeting notice for the public meetings is enclosed for your information. If you have any questions regarding the meetings, please contact Mike Scott of my staff by e-mail at mls3@nrc.gov or by telephone at 301-415-1421.

Sincerely,

/RA/

James E. Lyons, Director New Reactor Licensing Project Office Office of Nuclear Reactor Regulation cc: R. Trojanowski, REG II Project No. 719

Enclosure:

1. List of Invited Interested Members of the Public
2. Public Meeting Notice

March 21, 2003 Ms. Marilyn Root Lake Anna Observer 191 Lakewood Landing Drive Bumpass, Virginia 23024

Dear Ms. Root:

The purpose of this letter is to invite you, as an individual who may have an interest in activities related to the North Anna Power Station, to public meetings on April 1, 2003, with representatives of the U.S. Nuclear Regulatory Commission (NRC). The purpose of the meetings is to discuss the review process for Dominion Energys (Dominion) early site permit (ESP) application for the North Anna site. Dominion is expected to file an ESP application with the NRC in September 2003 for a new reactor or reactors at the North Anna site. At the meetings, the NRC will discuss the NRC ESP review process, as well as the opportunities for public involvement in that process for the North Anna site.

Under the NRCs regulations in Part 52 of Title 10 of the Code of Federal Regulations, Early Site Permits, Standard Design Certifications, and Combined Licenses for Nuclear Power Plants, the NRC can issue an ESP for approval of one or more sites for possible future construction of a nuclear power plant or plants. The issuance of an ESP is separate from the issuance of a license to construct or operate a nuclear power plant. The review of an ESP addresses site safety issues, environmental protection issues, and plans for coping with emergencies, independent of the review of a specific nuclear plant design. Should an ESP be issued for North Anna, Dominion could reference the ESP in seeking, at some time during the term of the ESP, a license to construct or operate a nuclear power plant or plants on the site.

The public meetings will take place on April 1, 2003, from 2:00 p.m. to 4:30 p.m. and from 7:00 p.m. to 9:30 p.m., at the Louisa County Library, 881 Davis Highway, Mineral, VA. The meeting notice for the public meetings is enclosed for your information. If you have any questions regarding the meetings, please contact Mike Scott of my staff by e-mail at mls3@nrc.gov or by telephone at 301-415-1421.

Sincerely,

/RA/

James E. Lyons, Director New Reactor Licensing Project Office Office of Nuclear Reactor Regulation cc: R. Trojanowski, REG II Project No. 719

Enclosure:

1. List of Invited Interested Members of the Public
2. Public Meeting Notice

March 21, 2003 Mr. Ben Thorp 815 Arlington Circle Richmond, Virginia 23229

Dear Mr. Thorp:

The purpose of this letter is to invite you, as an individual who may have an interest in activities related to the North Anna Power Station, to public meetings on April 1, 2003, with representatives of the U.S. Nuclear Regulatory Commission (NRC). The purpose of the meetings is to discuss the review process for Dominion Energys (Dominion) early site permit (ESP) application for the North Anna site. Dominion is expected to file an ESP application with the NRC in September 2003 for a new reactor or reactors at the North Anna site. At the meetings, the NRC will discuss the NRC ESP review process, as well as the opportunities for public involvement in that process for the North Anna site.

Under the NRCs regulations in Part 52 of Title 10 of the Code of Federal Regulations, Early Site Permits, Standard Design Certifications, and Combined Licenses for Nuclear Power Plants, the NRC can issue an ESP for approval of one or more sites for possible future construction of a nuclear power plant or plants. The issuance of an ESP is separate from the issuance of a license to construct or operate a nuclear power plant. The review of an ESP addresses site safety issues, environmental protection issues, and plans for coping with emergencies, independent of the review of a specific nuclear plant design. Should an ESP be issued for North Anna, Dominion could reference the ESP in seeking, at some time during the term of the ESP, a license to construct or operate a nuclear power plant or plants on the site.

The public meetings will take place on April 1, 2003, from 2:00 p.m. to 4:30 p.m. and from 7:00 p.m. to 9:30 p.m., at the Louisa County Library, 881 Davis Highway, Mineral, VA. The meeting notice for the public meetings is enclosed for your information. If you have any questions regarding the meetings, please contact Mike Scott of my staff by e-mail at mls3@nrc.gov or by telephone at 301-415-1421.

Sincerely,

/RA/

James E. Lyons, Director New Reactor Licensing Project Office Office of Nuclear Reactor Regulation cc: R. Trojanowski, REG II Project No. 719

Enclosure:

1. List of Invited Interested Members of the Public
2. Public Meeting Notice