FPL PAR 10 203 L-2003-058 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - February 2003 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the February 2003 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.
NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.
an FPL Group company Turkey Point Plant OIH Attachments
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-250 Turkey Point Unit 3 3/4/2003 Olga Hanek (305) 246-6607 Reporting Period February, 2003 OPERATING DATA REPORT UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% until 2/18/03 when power was reduced to 60% to repair the 3B main feedwater pump. Unit 3 remained at approximately 60% power for the rest of the month in preparation for the refueling outage scheduled to begin March 1, 2003.
Design Electrical Rating (MWe-Net) 720 886525 12624560 Maximum Dependable Capacity' (MWe-Net) 693 Month Year-to-date Cumulative No. of hours reactor was critical 672.0 1375.7 195915.55 No. of hours generator was on line (service hours) 672.0 1370.1 193578.6 Unit reserve shutdown hours 0
0 121.8 Net Electrical Energy (MWH) 393041 886525 126245602
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-251 Turkey Point Unit 4 3/4/2003 Olga Hanek (305) 246-6607 Reporting Period February, 2003 Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 nrioni 4 A 4 ih nulative 192778.7 NJO. OT hours reactor was__________11 No. of hours generator was on line (service hours) 672 1416 188361.2 Unit reserve shutdown hours 0
0 577.2 Net Electrical Energy (MWH) 481820 992719 123951809 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F -Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
Summary Of Monthly Operatingq Experience Unit 4 operated at essentially 100% power for the month of February 2003.
Mon[n l1-+ IV il
=!