ML030770776

From kanterella
Jump to navigation Jump to search
2003 Susquehanna Annual Assessment Invitational Letters
ML030770776
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/12/2003
From: Shanbaky M
Reactor Projects Region 1 Branch 4
To: Foster R, Gordner J, Hasay G, Janati R, Krothe D, Novelli J, Remensnyder G, Schatz P, Soberick W, John Thomas, Whitemire L
- No Known Affiliation, State of PA, State of PA, Dept of Environmental Protection, State of PA, House of Representatives
Shared Package
ML030620094 List:
References
Download: ML030770776 (11)


Text

March 12, 2003 Representative John Gordner 904-B Orange Street Berwick, PA 18603

SUBJECT:

SUSQUEHANNA STEAM ELECTRIC STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Gordner:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and PPL Susquehanna, LLC in which the NRC staff will discuss with PPL our annual assessment of the safety performance of the Susquehanna Steam Electric Station.

The meeting will be held at 1:00 p.m. on Monday, March 31, 2003, at the Susquehanna Energy Information Center, 634 Salem Boulevard in Berwick, Pennsylvania, and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with PPL our assessment of the safety performance of Susquehanna and their response to our assessment. The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Susquehanna and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Susquehanna Steam Electric Station in accordance with the NRC Reactor Oversight Process.

Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to PPL Susquehanna, LLC on March 3, 2003; A copy of that letter is enclosed. The letter can also be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/susq_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Susquehanna Steam Electric Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html Your schedule permitting, I look forward to meeting you on March 31, 2003. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As stated

March 12, 2003 Mr. Dale Krothe 1007 Sunset Drive Berwick, PA 18603

SUBJECT:

SUSQUEHANNA STEAM ELECTRIC STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Krothe:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and PPL Susquehanna, LLC in which the NRC staff will discuss with PPL our annual assessment of the safety performance of the Susquehanna Steam Electric Station.

The meeting will be held at 1:00 p.m. on Monday, March 31, 2003, at the Susquehanna Energy Information Center, 634 Salem Boulevard in Berwick, Pennsylvania, and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with PPL our assessment of the safety performance of Susquehanna and their response to our assessment. The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Susquehanna and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Susquehanna Steam Electric Station in accordance with the NRC Reactor Oversight Process.

Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to PPL Susquehanna, LLC on March 3, 2003; A copy of that letter is enclosed. The letter can also be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/susq_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Susquehanna Steam Electric Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html Your schedule permitting, I look forward to meeting you on March 31, 2003. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As stated

March 12, 2003 Mr. Robert Foster 1586 State Route 63 Berwick, PA 18603

SUBJECT:

SUSQUEHANNA STEAM ELECTRIC STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Foster:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and PPL Susquehanna, LLC in which the NRC staff will discuss with PPL our annual assessment of the safety performance of the Susquehanna Steam Electric Station.

The meeting will be held at 1:00 p.m. on Monday, March 31, 2003, at the Susquehanna Energy Information Center, 634 Salem Boulevard in Berwick, Pennsylvania, and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with PPL our assessment of the safety performance of Susquehanna and their response to our assessment. The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Susquehanna and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Susquehanna Steam Electric Station in accordance with the NRC Reactor Oversight Process.

Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to PPL Susquehanna, LLC on March 3, 2003; A copy of that letter is enclosed. The letter can also be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/susq_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Susquehanna Steam Electric Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html Your schedule permitting, I look forward to meeting you on March 31, 2003. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As stated

March 12, 2003 Representative George Hasay 4729 Blue Ridge Trail Mountaintop, PA 18707

SUBJECT:

SUSQUEHANNA STEAM ELECTRIC STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Hasay:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and PPL Susquehanna, LLC in which the NRC staff will discuss with PPL our annual assessment of the safety performance of the Susquehanna Steam Electric Station.

The meeting will be held at 1:00 p.m. on Monday, March 31, 2003, at the Susquehanna Energy Information Center, 634 Salem Boulevard in Berwick, Pennsylvania, and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with PPL our assessment of the safety performance of Susquehanna and their response to our assessment. The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Susquehanna and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Susquehanna Steam Electric Station in accordance with the NRC Reactor Oversight Process.

Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to PPL Susquehanna, LLC on March 3, 2003; A copy of that letter is enclosed. The letter can also be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/susq_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Susquehanna Steam Electric Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html Your schedule permitting, I look forward to meeting you on March 31, 2003. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As stated

March 12, 2003 Mr. John Novelli, Jr.

59 Italy Street Mocanaqua, PA 18655

SUBJECT:

SUSQUEHANNA STEAM ELECTRIC STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Novelli:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and PPL Susquehanna, LLC in which the NRC staff will discuss with PPL our annual assessment of the safety performance of the Susquehanna Steam Electric Station.

The meeting will be held at 1:00 p.m. on Monday, March 31, 2003, at the Susquehanna Energy Information Center, 634 Salem Boulevard in Berwick, Pennsylvania, and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with PPL our assessment of the safety performance of Susquehanna and their response to our assessment. The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Susquehanna and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Susquehanna Steam Electric Station in accordance with the NRC Reactor Oversight Process.

Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to PPL Susquehanna, LLC on March 3, 2003; A copy of that letter is enclosed. The letter can also be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/susq_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Susquehanna Steam Electric Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html Your schedule permitting, I look forward to meeting you on March 31, 2003. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As stated

March 12, 2003 Mr. George Remensnyder Box 2 Beach Haven, PA 18601

SUBJECT:

SUSQUEHANNA STEAM ELECTRIC STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Remensnyder:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and PPL Susquehanna, LLC in which the NRC staff will discuss with PPL our annual assessment of the safety performance of the Susquehanna Steam Electric Station.

The meeting will be held at 1:00 p.m. on Monday, March 31, 2003, at the Susquehanna Energy Information Center, 634 Salem Boulevard in Berwick, Pennsylvania, and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with PPL our assessment of the safety performance of Susquehanna and their response to our assessment. The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Susquehanna and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Susquehanna Steam Electric Station in accordance with the NRC Reactor Oversight Process.

Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to PPL Susquehanna, LLC on March 3, 2003; A copy of that letter is enclosed. The letter can also be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/susq_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Susquehanna Steam Electric Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html Your schedule permitting, I look forward to meeting you on March 31, 2003. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As stated

March 12, 2003 Mr. Paul Schatz 41 Schatz Road Bloomsburg, PA 17815

SUBJECT:

SUSQUEHANNA STEAM ELECTRIC STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Schatz:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and PPL Susquehanna, LLC in which the NRC staff will discuss with PPL our annual assessment of the safety performance of the Susquehanna Steam Electric Station.

The meeting will be held at 1:00 p.m. on Monday, March 31, 2003, at the Susquehanna Energy Information Center, 634 Salem Boulevard in Berwick, Pennsylvania, and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with PPL our assessment of the safety performance of Susquehanna and their response to our assessment. The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Susquehanna and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Susquehanna Steam Electric Station in accordance with the NRC Reactor Oversight Process.

Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to PPL Susquehanna, LLC on March 3, 2003; A copy of that letter is enclosed. The letter can also be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/susq_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Susquehanna Steam Electric Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html Your schedule permitting, I look forward to meeting you on March 31, 2003. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As stated

March 12, 2003 Commissioner William Soberick 35 West Main Street Bloomsburg, PA 18603

SUBJECT:

SUSQUEHANNA STEAM ELECTRIC STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Soberick:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and PPL Susquehanna, LLC in which the NRC staff will discuss with PPL our annual assessment of the safety performance of the Susquehanna Steam Electric Station.

The meeting will be held at 1:00 p.m. on Monday, March 31, 2003, at the Susquehanna Energy Information Center, 634 Salem Boulevard in Berwick, Pennsylvania, and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with PPL our assessment of the safety performance of Susquehanna and their response to our assessment. The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Susquehanna and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Susquehanna Steam Electric Station in accordance with the NRC Reactor Oversight Process.

Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to PPL Susquehanna, LLC on March 3, 2003; A copy of that letter is enclosed. The letter can also be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/susq_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Susquehanna Steam Electric Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html Your schedule permitting, I look forward to meeting you on March 31, 2003. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As stated

March 12, 2003 Ms. Lucille Whitemire 531 LaSalle Street Berwick, PA 18603

SUBJECT:

SUSQUEHANNA STEAM ELECTRIC STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Ms. Whitmire:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and PPL Susquehanna, LLC in which the NRC staff will discuss with PPL our annual assessment of the safety performance of the Susquehanna Steam Electric Station.

The meeting will be held at 1:00 p.m. on Monday, March 31, 2003, at the Susquehanna Energy Information Center, 634 Salem Boulevard in Berwick, Pennsylvania, and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with PPL our assessment of the safety performance of Susquehanna and their response to our assessment. The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Susquehanna and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Susquehanna Steam Electric Station in accordance with the NRC Reactor Oversight Process.

Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to PPL Susquehanna, LLC on March 3, 2003; A copy of that letter is enclosed. The letter can also be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/susq_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Susquehanna Steam Electric Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html Your schedule permitting, I look forward to meeting you on March 31, 2003. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As stated

March 12, 2003 Mr. John Thomas 31 Furnace Street Shickshinny, PA 18655

SUBJECT:

SUSQUEHANNA STEAM ELECTRIC STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Thomas:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and PPL Susquehanna, LLC in which the NRC staff will discuss with PPL our annual assessment of the safety performance of the Susquehanna Steam Electric Station.

The meeting will be held at 1:00 p.m. on Monday, March 31, 2003, at the Susquehanna Energy Information Center, 634 Salem Boulevard in Berwick, Pennsylvania, and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with PPL our assessment of the safety performance of Susquehanna and their response to our assessment. The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Susquehanna and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Susquehanna Steam Electric Station in accordance with the NRC Reactor Oversight Process.

Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to PPL Susquehanna, LLC on March 3, 2003; A copy of that letter is enclosed. The letter can also be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/susq_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Susquehanna Steam Electric Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html Your schedule permitting, I look forward to meeting you on March 31, 2003. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects

Enclosure:

As stated

March 12, 2003 Mr. Rich Janati PA Department of Environmental Protection Rachel Carson State Office Building Post Office Box 8469 Harrisburg, PA 17105-8469

SUBJECT:

SUSQUEHANNA STEAM ELECTRIC STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Janati:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and PPL Susquehanna, LLC in which the NRC staff will discuss with PPL our annual assessment of the safety performance of the Susquehanna Steam Electric Station.

The meeting will be held at 1:00 p.m. on Monday, March 31, 2003, at the Susquehanna Energy Information Center, 634 Salem Boulevard in Berwick, Pennsylvania, and is open to the public for observation. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with PPL our assessment of the safety performance of Susquehanna and their response to our assessment. The NRC staff will be available following the meeting to answer questions from you and members of the public regarding the safety performance of Susquehanna and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Susquehanna Steam Electric Station in accordance with the NRC Reactor Oversight Process.

Our assessment used the most recent performance indicator data and inspection findings from January 1, 2002 through December 31, 2002. We described our assessment results in a letter to PPL Susquehanna, LLC on March 3, 2003; A copy of that letter is enclosed. The letter can also be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/susq_2002q4.pdf You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Susquehanna Steam Electric Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html Your schedule permitting, I look forward to meeting you on March 31, 2003. In the interim, please do not hesitate to contact me at 610-337-5209, if I can be of further assistance to you.

Sincerely,

/RA/

Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects