February 2003 Monthly Operating Report for Perry Unit 1
ML030770580
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/11/2003
From: Higaki V
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PY-CEI/NRR-2700L
Download: ML030770580 (3)


Text

FENOC Perry Nuclear Power Plant FENOC10 Center Road RO Box 97 FirstEnergy Nuclear Operating Company Perry, Ohio 44081 March 11, 2003 PY-CEI/NRR-2700L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:

Attached is the February 2003 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."

If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.

Very truly yours, Vernon K. Higaki Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector 2$-

OPERATING DATA REPORT UNIT:

Perry DATE:

3/7/03 Docket: 50-440 Unit Name:

Perry Nuclear Power Plant Reporting Period: February 2003 Utility

Contact:

T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):

Maximum Dependable Capacity (Net MWe):

1.
2.
3.
4.
5.
6.

7.

Hours Reactor was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWeH)

This Month 672.0 672 0 0.0 764,817.0 Yr-to-Date 1,4160 1,4160 0.0 1.695140.0 Cumulative 106.319 5 103,686.3 0.0 118.270.351.0 1350 1235

8.
9.
10.

11.

Page 1

UNIT SHUTDOWNS REPORT MONTH - February 2003 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 3/7/03 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.

Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1

Hours 2

3

SUMMARY

The unit was on line the entire month of February, 2003.
1. TYPE' F: Forced S, Scheduled
2. REASON:

A - Equipment Failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &

License Examination F - Administrative G - Operational Error (explain)

H-Other (explain)

3. METHOD:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2