March 13, 2003 Carl Terry, BWRVIP Chairman Niagara Mohawk Power Company Post Office Box 63 Lycoming, NY 13093
SUBJECT:
EXTENSION OF SCHEDULE FOR REPORTING RIVER BEND STATION SURVEILLANCE CAPSULE TEST RESULTS UNDER THE BWR INTEGRATED SURVEILLANCE PROGRAM
Dear Mr. Terry:
By your letter dated February 20, 2003, the Boiling Water Reactor Vessel and Internals Project (BWRVIP) requested an extension in the reporting date for the results from the testing of the first River Bend Station (RBS) surveillance capsule as part of the BWR Integrated Surveillance Program (ISP). This would be the first surveillance capsule tested under the ISP and, as noted in your letter, resources could not be allocated in time to complete RBS capsule testing, analysis and reporting of results by February 2003, as required under Appendix H to 10 CFR Part 50 and ISP implementation guidelines which had been previously approved by the NRC.
Consistent with Appendix H to 10 CFR Part 50, IV. A., you requested an extension of the date by which the results were required to be reported to the NRC from February 2003 to June 2003.
The staff has concluded that this extension in the reporting of the results from this ISP surveillance capsule will not change the overall effectiveness of the ISP and will not affect the continued safe operation of the BWR fleet. Therefore, your request to extend this reporting requirement interval is acceptable.
If you should have further questions regarding any matters associated with implementation of the ISP, please contact Matthew A. Mitchell (301-415-3303) of my staff.
Sincerely,
/RA/
William H. Bateman, Chief Materials and Chemical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation cc: BWRVIP CC List
Carl Terry, BWRVIP Chairman Niagara Mohawk Power Company Post Office Box 63 Lycoming, NY 13093
SUBJECT:
EXTENSION OF SCHEDULE FOR REPORTING RIVER BEND STATION SURVEILLANCE CAPSULE TEST RESULTS UNDER THE BWR INTEGRATED SURVEILLANCE PROGRAM
Dear Mr. Terry:
By your letter dated February 20, 2003, the Boiling Water Reactor Vessel and Internals Project (BWRVIP) requested an extension in the reporting date for the results from the testing of the first River Bend Station (RBS) surveillance capsule as part of the BWR Integrated Surveillance Program (ISP). This would be the first surveillance capsule tested under the ISP and, as noted in your letter, resources could not be allocated in time to complete RBS capsule testing, analysis and reporting of results by February 2003, as required under Appendix H to 10 CFR Part 50 and ISP implementation guidelines which had been previously approved by the NRC.
Consistent with Appendix H to 10 CFR Part 50, IV. A., you requested an extension of the date by which the results were required to be reported to the NRC from February 2003 to June 2003.
The staff has concluded that this extension in the reporting of the results from this ISP surveillance capsule will not change the overall effectiveness of the ISP and will not affect the continued safe operation of the BWR fleet. Therefore, your request to extend this reporting requirement interval is acceptable.
If you should have further questions regarding any matters associated with implementation of the ISP, please contact Matthew A. Mitchell (301-415-3303) of my staff.
Sincerely,
/RA/
William H. Bateman, Chief Materials and Chemical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation cc: BWRVIP CC List Distribution:
EMCB R/F JLarkins SDuraiswamy GHolohan MEMayfield WLanning, R1 CCasto, R2 JGrobe. R3 AHowell, R4 Accession No.: ML030770210 EMCB:DE EMCB:DE EMCB:DE MAMitchell SMCoffin WHBateman 3 / 6 /2003 3 / 10 /2003 3 / 13 /2003
BWRVIP CC List George Vanderheyden, Executive Chair BWRVIP Assessment Committee Exelon Corp.
200 Exelon Way (KSA 3-N)
Kennett Square, PA 19348 Robin Dyle, Technical Chairman BWRVIP Assessment Committee Southern Nuclear Operating Co.
40 Inverness Center Parkway Birmingham, AL 35242 Bill Eaton, Executive Chair, BWRVIP Inspection Focus Group Grand Gulf Gen. Mgr., Plant Operations Entergy Operations, Inc.
PO BOX 756, Waterloo Rd Port Gibson, MS 39150-0756 Gary Park, Chairman BWRVIP Inspection Focus Group Nuclear Management Co.
3313 DAEC Road Palo, IA 52324-9646 H. Lewis Sumner, Executive Chair BWRVIP Mitigation Committee Vice President, Hatch Project Southern Nuclear Operating Co.
M/S BIN B051, PO BOX 1295 40 Inverness Center Parkway Birmingham, AL 35242-4809 John Wilson, Technical Chair BWRVIP Mitigation Committee AmerGen Energy Co.
Clinton Power Station, M/C T-31C P.O. Box 678 Clinton, IL 61727 George T. Jones, Executive Chair BWRVIP Repair Focus Group Vice President, Nuclear Engrg. & Support PP&L, Inc.
M/S GENA61 2 N 9th St Allentown, PA 18101-1139 Vaughn Wagoner, Technical Chair BWRVIP Integration Committee Carolina Power & Light Company One Hannover Square 9C1 P.O. Box 1551 Raleigh, NC 27612 Robert Carter, EPRI BWRVIP Assessment Manager Greg Selby, EPRI BWRVIP Inspection Manager EPRI NDE Center P. O. Box 217097 1300 W. T. Harris Blvd.
Charlotte, NC 28221 Bruce McLeod, Technical Chair BWRVIP Repair Focus Group Southern Nuclear Operating Co.
Post Office Box 1295 40 Inverness Center Parkway Birmingham, AL 35201 Richard Ciemiewicz, Technical Vice Chair BWRVIP Assessment Committee Exelon Corp.
Peach Bottom Atomic Power Station M/S SMB3-6 1848 Lay Road Delta, PA 17314-9032 Tom Mulford, EPRI BWRVIP Integration Manager Raj Pathania, EPRI BWRVIP Mitigation Manager Ken Wolfe, EPRI BWRVIP Repair Manager Larry Steinert, EPRI BWRVIP Electric Power Research Institute P. O. Box 10412 3412 Hillview Ave.
Palo Alto, CA 94303