Nuclear Management Company STATE CHANGE HISTORY Initiate by JULIE KREIL Complete and Close by MARYBETH ARNOLD A11116 Assign Work 3/5/2002 10:11:54 AM Owner DICK HORNAK
- F Done 3/28/2002 11
- 27:50 AM Owner (None)
Assign by DICK HORNAK Conduct Work 3/5/2002 3:26-25 PM Owner JEFF NOVAK
'q 1r Work Complete by JEFF NOVAK Review &
Approval 3/14/2002 4 07:37 PM Owner DICK HORNAK pr Approved by DICK HORNAK Quality Check 3/25/2002 3.50:06 PM Owner PBNP CAP Admin SECTION 1 Activity Request Id:
Activity Type:
Site/Unit:
Activity Requested:
CE000265 Condition Evaluation Submit Date:
3/5/2002 10:11:54 AM Point Beach - None Perform a Condition Evaluation, per CAP002353, in accordance with NP 5.3.1. (Field issues need to be resolved prior to MR installation on 3/10/02.)
0 CATPR:
Initiator Department:
N NP PB QA PB ZI Responsible Department: Engineering Initiator:
Responsible Group Code:
Activity Supervisor:
POLACEK, JEFF t1 EDMP Engineenng Design Mechanical PB DICK HORNAK Activity Performer:
JEFF NOVAK I!1 SECTION 2 Priority:
3 Due Date:
3/8/2002 Mode Change Restraint:
(None)
Management Exception From PI?:
N 0 OAINuclear Oversight?:
N 0 Licensing Review?:
N NRC Commitment?:
N O NRC Commitment Date:
SECTION 3 0 Condtn Eval:
Activity Completed:
- 1. Condition Assessment / Issue Summary - describe the present condition.
- 2. Potential Solutions - describe solution options.
- 3. Solution to Implement - identify chosen solution.
3/14/2002 4:07PM - JEFF NOVAK*
The welds in question were in fact under sized.
the tanks in question were fabricated per PO # 4500373998 Line # 13 for MR 02-001 (tanks SN are 2029011-001 and SN 2029011-002). This PO specified that the tanks shall be manufactured lAW there OA program and the PBNP will supplement their program with a final visual exam. It was during this exam that the undersized welds were discovered.
https://nmc.ttrackonline.com/tmtrack/tmtrack.dll?IssuePage&TableId= 1000&Recordld=231... 9/10/2002 Page 1 of 3
)Lý'
Nuclear Management Company The required weld leg size was.218" per ASME VIII UW-16 (see sketch (a) on figure UW 16.1).
The vessels were returned to the manufacture for repair lAW their Section XIII program.
The tanks have been returned and reexamined. The final visual exam is complete and all welds on both tanks are satisfactory (see visual exam weld examination record number 700416).
3/28/2002 11:27AM - MARYBETH ARNOLD:
CLOSED per the additional actions taken stated above.
SECTION 4 QA Supervisor:
(None)
Licensing Supervisor:
(None)
SECTION 5 0 Project:
Condition Evaluation (CE)
O State:
Done 0 Active/Inactive:
Inactive O Owner:
(None)
AR Type:
Parent 0 Submitter:
JULIE KREIL Assigned Date:
3/5/2002 "0 Last Modified Date:
3/28/2002 11:27:50 0 Last Modifier:
MARYBETH ARNOLD AM
" Last State Change Date:
3/28/2002 11:27:50 0 Last State Changer:
MARYBETH ARNOLD AM
"* Close Date:
3/28/2002 11:27:50 AM "O One Line
Description:
Weld size for the new vertical air tanks, T-212, are in question NUTRK ID:
Child Number:
0
References:
Update:
Import Memo Field:
CAP Admin:
PBNP CAP Admin Site:
Point Beach OLDACTIONNUM:
Cartridge and Frame:
ATTACHMENTS AND PARENT/CHILD LINKS E Linked From CAP002353 CHANGE HISTORY I1.
o.f1-1.
-,1 11,
-T 1"
.nL I1T4-I A
Q' - ').
'IT A A l l (r
f I 1n r"f )l' Page 2 of 3
"Nuclear Management Company Page 3 of 3 3125/2002 3:50:06 PM by DICK HORNAK CAP Admin Changed From SCOTT PFAFF To PBNP CAP Admin 3128/2002 11:27:50 AM by MARYBETH ARNOLD Activity Completed Changed From '[Original Text]' To '[Appended] 3/28/2002 11:27AM - MARYBETH ARNOLD: CLOSED per the additional actions taken stated above.'
State Changed From Quality Check To Done Via Transition: Complete and Close Active/Inactive Changed From Active To Inactive Owner Changed From PBNP CAP Admin To (None)
Last Modified Date Changed From 3/25/2002 3:50 06 PM To 3/28/2002 11:27:50 AM Last Modifier Changed From DICK HORNAK To MARYBETH ARNOLD Last State Change Date Changed From 3/25/2002 3:50 06 PM To 3/28/2002 11:27:50 AM Last State Changer Changed From DICK HORNAK To MARYBETH ARNOLD Close Date Changed From Unassigned To 3/28/2002 11:27:50 AM httnc-//nmr ttrnic,1-nI;no rinm/tmtrnr--'/tmtr'2r 4 '
ielE9Tcc.,pP-npRrT'dhlpTr--1 a /
RIrcITA--l OI)11)