Initial Exam - 08/2002 - Written Exam Comment Response
ML030730651
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/23/2002
From: Gody A
Operations Branch IV
To: Randolph G
Union Electric Co
References
50-483/02-301 50-483/02-301
Download: ML030730651 (1)


Text

RESPONSE TO NRC EXAMINER COMMENTS CALLAWAY AUGUST 2002 WRITTEN EXAM S002 Comment:

Response

S007 Comment:

Should it be step 5 in the question stem instead of step 6?

No change. Step 6 is the correct step number. Step 5b is a continuous action step and is required to be performed any time it occurs.

Decrease value of RWST level in stem to make distracter 'D' more credible.

Response: Revised RWST level to 40%.

B010 Comment: Is it a valid requirement to know NK battery capacity? If so, improve documentation of requirement.

Response: Yes. Revised ES-401-6 for B010 to reflect objective and reference material.

B035 Comment: Revise distracter 'C' and answer 'D' to make it clear that the alarm would be received subsequent to the restoration of the misaligned rod.

Response: Revised 'C' and 'D' to clarify when alarm is received.

B053 Comment: Is the Containment pressure and rate of increase in the stem consistent with the remaining items in the stem?

Response: The Containment pressure information in the stem was not needed to support the question. Deleted this information from the stem.