ML030730625

From kanterella
Jump to navigation Jump to search
Initial Exam - 08/2002 - Exam Schedule
ML030730625
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/23/2002
From: Gody A
Operations Branch IV
To: Randolph G
Union Electric Co
References
50-483/02-301 50-483/02-301
Download: ML030730625 (2)


Text

K6ary Johnston

- NRC Exam Schedule.doc Paae 1 Callaway Rev. 1, May 31, 2002 NRC EXAM SCHEDULE - CALLAWAY, AUGUST 2002 Assignments: 3 Examiners: El, E2, E3 El = U1, R1, R3, R7 1 Upgrade SRO: Ul E2 = I1, R4, R6 2 Instant SROs: I1, 12 E3 = 12, R2, R5 7 ROs: R1, R2, R3, R4, R5, R6, R7 MON - JPMs S1, S2, S3 (Ul does NOT perform S1 and S3) 1400-1530 Q-R1, R4, R2 [El, E2, E3]

S1,S2,S3 1530-1700 R3, I1, R5 [El, E2, E3]

S1,S2, S3 1700-1830 R7, R6, 12 [El, E2, E3]

S1,S2,S3 1830- 1900 Ul [Eli S2 TUE - Scenario DS1 1530-1730 I1, R1, R2 [E2, El, E3]

DS1 1730-1930 12, R3, R4 [E3, El, E2]

DS1 1930-2000

?

DINNER 2000-2200 1-S1, R6, R7 [N/A, E2, El]

DS1 2200-2400 U1, R5, S1 [El, E3, N/A]

DS1 WED - Scenario DS2, Admin JPMs A1,A2, A3, A4, A5 (Ul does NOT perform DS2) 1130-1330 S1, R2, R1 [N/A, E3, El]

DS2 R3, R4, R5, R7 [E2]

Al, A2 1330-1530 Sr S1, R4, R3 [N/A, E2, El]

DS2 R1, R2, R5, R7 [E3]

A3, A4, A5 1530-1730 Q=

S1, R7, R5 [N/A, El, E3]

DS2 I1, 12, R1, R2, R6 [E2]

Al, A2 1730-1800 Q*

DINNER 1800-2000 Q-S1,12, R6 [N/A, E3, E2]

DS2 I1, U1, R3, R4 [El]

A3, A4, A5 2000-2200 S1, I1, S2 [N/A, E2, N/A]

DS2 12, R6 [E3]

A3, A4, A5 U1 [El]

Al, A2 Gary Johnston - NRG Exam Schedule.doc Page 11 Paae 1

Gary Johnston - NRC Exam Schedule.doc Callaway Rev. 1, May 31, 2002 NRC EXAM SCHEDULE - CALLAWAY, AUGUST 2002 THU - JPMs S4, S5, S6, Cl, P3 (Ul does NOT perform S4 and S5) 1330-1500

  • P R1, R4, R2 [El, E2, E3]

S4,S5,S6 1500-1630 1=

R3, I1, R5 [El, E2, E3]

S4,S5,S6 1630-1800 1

R7, R6, 12 [El, E2, E3]

S4,S5,S6 1800-1830 DINNER 1830-1930 R1, R4, R2 [El, E2, E3]

C1, P3 1930-2030 00 R3, I1, R5 [El, E2, E3]

Cl, P3 2030-2130

=

U1, R7, R6, 12 [El, E2, E3]

Cl, P3 2200-2230 U1 [El]

S6 FRI - JPMs P1, P2 (U1 does NOT perform P2) 0700-0800 I1, R1, R2 [E2, El, E3]

0800-0900 12, R3, R4 [E3, El, E2]

0900-1000 R5, R6, R7 [E3, E2, El]

1000-1030 U1 [El]

1030 EXIT MEETING NOTES:

1. JPMs S1, S2, and S3 are designed fo P1, P2 P1, P2 P1, P2 P1 rsimultaneous administration.
2. JPMs S4, S5, and S6 are designed for simultaneous administration.
3. Crew rotation for scenarios is attached.

~aIY h.......R.Exa du dPage, 2