Inservice Inspection Summary Report, Interval 3, Period 3, Refueling Outage Dates:11-15-2002 to 12-6-2002 Fuel Cycle 21: 2-25-2001 to 12-6-02
ML030730056
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 03/06/2003
From: Solymossy J
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-PI-03-029
Download: ML030730056 (2)


Text

Committed to Nuclear Excellence Nuclear Management Company, LLC Prairie Island Nuclear Generating Plant 1717 Wakonade Dr. East

  • Welch MN 55089 March 6, 2003 L-PI-03-029 10 CFR 50.55a U S Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT DOCKET NO. 50-282 LICENSE NO. DPR-42 UNIT I INSERVICE INSPECTION

SUMMARY

REPORT, INTERVAL 3, PERIOD 3, REFUELING OUTAGE DATES: 11-15-2002 TO 12-6-2002 FUEL CYCLE 21: 2-25-2001 TO 12-6-2002 During the 2002 Prairie Island Unit 1 refueling outage, an inservice inspection (ISI) examination for the third period of the third interval was conducted. Attached for your information are four copies of the ISI examination summary report for this period.

The summary report is being submitted in accordance with the Prairie Island American Society of Mechanical Engineers (ASME) Code Section XI Inservice Inspection Program and is intended to satisfy the inspection reporting requirements contained in IWA-6220 of the ASME Boiler and Pressure Vessel Code.

The report identifies components examined, the examination methods used, the examination number, and summarizes the results. All anomalies were either corrected or an engineering evaluation was performed to accept "as-is" conditions. A description of the corrective work and the corresponding work request numbers are provided in the ASME Section XI Repair/Replacement portion of the report.

This letter contains no new commitments and no revisions to existing commitments.

Please contact Jack Leveille (651-388-1121, Ext. 4142) if you have any questions related to this letter.

Jose M. Solymoss

'?ity ce President, rairieland Nuclear Generating Plant cc: (see next page)

USNRC NUCLEAR MANAGEMENT COMPANY, LLC L-PI-03-029 Page 2 cc:

Regional Administrator, USNRC, Region III (2 copies of attachment)

Project Manager, Prairie Island Nuclear Generating Plant, USNRC, NRR NRC Resident Inspector - Prairie Island Nuclear Generating Plant Chief Boiler Inspector, State of MN P. Fisher, Hartford Insurance

Attachment:

Inservice Inspection Summary Report/Interval 3, Period 3/Refueling Outage Dates: 11-15-2002 to 12-6-2002/Unit 1, Fuel Cycle 21: 2-25-2001 to 12-6-2002