0 FPL Energy Seabrook Station FPL Energy Seabrook Station P.O. Box 300 Seabrook, NH 03874 (603) 773-7000 March 6, 2003 Docket No. 50-443 NYN-03021 U. S. Nuclear Regulatory Commission Attn: Mr. Samuel J. Collins Director, Office of Nuclear Reactor Regulation Mail Stop OWFN 5 D2 5 E7 Washington, DC 20555-0001 Seabrook Station Nuclear Energy Liability Insurance In accordance with the requirements of 10CFR140.15, enclosed please find one copy of each of the endorsements listed below for the nuclear liability insurance policies issued by the Nuclear Energy Liability Insurance Association for Seabrook Station.
Policy Advance Premium and Standard Premium Endorsement for Calendar Year 2003 and Limitation of Coverage for Terrorist Acts Advance Premium and Standard Premium Endorsement for Calendar Year 2003 and Facility Worker Form Annual Premium Endorsement for Calendar Year 2003 Endorsement to Master Policy No. 1 Number NF-0296 NW-0647 N-0109 FAoD ý Enclosure 1
2 3
4
U. S. Nuclear Regulatory Commission NYN-03021/Page 2 Should you have any questions concerning this response, please contact Mr. James Peschel, Regulatory Programs Manager, at (603) 773-7194.
Very truly yours, FPL Energy Seabrook, LLC
ý R llatory Programs Manager Enclosures cc:
H. J. Miller, NRC Region I Administrator V. Nerses, NRC Project Manager, Project Directorate 1-2 G. T. Dentel, NRC Senior Resident Inspector U.S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555-0001
ENCLOSURE 1 TO NYN-03021
Marsh USA Inc FPL Seabrook, LLC Seabrook Nuclear Plant NF-296 2003 Advance Premium Base Premium:
$73,500
% of Base Premium 100.0%
50.0%
25.0%
12.0%
6.0%
2.5%
2.0%
2.0%
Subtotal:
Offsite PD Surcharge (Nine Mile Pt)
Less 97-00 reductions (15% ann'l):
2001 premium increase 10%:
2002 premium increase 30%:
2003 premium increase 42.386%:
2003 Annual Gorss Premium:
Comm. & Tax adjustment:
2003 Advance Premium:
$829.50 minimum premium per million Amount of Insurance First $
Next Next Next Next Next Next Next Total:
1 MM 4 MM 5 MM 10 MM 20 MM 20 MM 140 MM 100 MM
$300 MM
$73,500
$147,000
$91,875
$88,200
$88,200
$36,750
$205,800
$147.000
$878,325
$0
($419,834)
$45,849
$151,302
$277,903
$933,545
$25.943
$959,488
ANI Engineering Rating Factor Dollar Cost Analysis Seabrook Nuclear Station Unit1 2001 Final ERF 1.00 Industry ave. ERF 1.00 Minimum possible ERF 0.80 2002 Adv. Premium (net)
$959,488 Prem. @ Ind. Ave.
$959,488 Prem. @ Min. ERF
$670,368 Total Add'7 Cost of ERF above minimum possible
$289,120 Unit 1 Unit 1 Subf actor Subfactor Environmental Releases 29%
$83,845 Regulatory Performance 0%
$0 ANI Recommendations 0%
$0 Significant Events 0%
$0 Radwaste Shipments 1 %
$2,891 Safety System Failures 4%
$11,565 Unplanned Auto.
Scrams 45%
$130,104 Safety System Actuations 21%
$60,715 Radiation Exp 0%
$0 Number of Workers 0%
$0
NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION AMENDMENT OF CONDITION 4 It is agreed that with respect to bodily injury, property damage, environmental damage or evacuation of the public caused after the effective date of this endorsement by the nuclear energy hazard, the figure "$200,000,000" stated in Condition 4 of this policy is amended to read "$300,000,000".
Effective Date of this Endorsement:
January 1,2003 (12:01 A.M. Standard Time)
To form a part of Policy No. NF -0296 FPL Energy Seabrook, LLC; Massachusetts Municipal Wholesale Electric Company; Taunton Municipal Lighting Plant; and Hudson Light and Power Department Date of Issue:
December 20, 2002 For the subscribing companies ByPid President Endorsement No.:
93 Issued to:
Countersigned by
NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION Endorsement No.85, entitled "LIMITATION OF COVERAGE FOR TERRORIST ACTS (ONE SHARED INDUSTRY AGGREGATE LIMIT), is deleted and replaced with the following:
LIMITATION OF COVERAGE FOR TERRORIST ACTS (ONE SHARED INDUSTRY AGGREGATE LIMIT)
It is agreed that with respect to bodily injury, property damage, environmental damage or evacuation of the public caused by the nuclear energy hazard and arising out of a terrorist act:
1 the total aggregate liability of the companies shall be $300,000,000 regardless of (i) the number of terrorist acts affecting this or any other nuclear energy liability policy (Facility Form or Supplier's and Transporter's Form) or (ii) the number of nuclear energy liability policies (Facility Form or Supplier's and Transporter's Form) issued by the Nuclear Energy Liability Insurance Association under which coverage may be sought.
- 2. the limit of liability shown in Item 4 of the policy Declarations or as amended by endorsement to this policy is subject to the industry aggregate limitation described in paragraph I above.
- 3. the companies may, at their option, reinstate the one shared industry aggregate limit of
$300,000,000, provided that any such reinstatement approved by the companies shall not exceed the balance in the Industry Credit Rating Plan reserve fund.
- 4. the term "terrorist act" as used herein means a violent or otherwise hostile act or an act dangerous to human life, tangible or intangible property or infrastructure by any person or group, whether acting alone or on behalf of any organization or government, which causes damage to property or injury to persons, or represents a threat thereof and appears to be intended to (i) intimidate or coerce a civilian population; or (ii) disrupt any segment of an economy;, or (iii) influence the policy of a government by intimidation or coercion; or (iv) affect the conduct of a government by mass destruction, assassination, kidnapping or hostage-taking.
Effective Date of this Endorsement:
January 1, 2003 To form a part of Policy No. NF -0296 (12:01 A.M. Standard lime)
Issued to: FPL Energy Seabrook, LLC; Massachusetts Municipal Wholesale Electric Company; Taunton Municipal Lighting Plant; and Hudson Light and Power Department Date of Issue:
December 20, 2002 For the subscribing companies SPresident Endorsement No.
94 Countersigned by
NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION INCREASE OF LIMIT OF LIABILITY ENDORSEMENT (After Prior Increase)
It is agreed that:
I. The limit of the companies' liability stated in Item 4 of the declarations as amended by the Increase of Limit of Liability Endorsement(s) listed below is further amended to read $ 300,000,000 ; but in the event that any payments have heretofore been made by the companies for loss or expense covered by the policy, each of those limits of liability including the limit of liability as amended by this endorsement is reduced in accordance with Condition 3 of the policy by the total amount of those payments, except to the extent that any such reduced limit of liability may have been previously restored in accordance with a Restoration of Limit of Liability Endorsement.
- 2. The increase in the limit of liability provided by this endorsement applies only with respect to obligations assumed or expenses incurred because of bodily injury, property damage, environmental damage or evacuation of the public caused, during the period from the effective date of this endorsement to the date of termination of the policy, by the nuclear energy hazard.
- 3.
The original limit of liability stated in Item 4 of the declarations, the limit(s) of liability stated in the Increase of Limit of Liability Endorsement(s) listed below and the amended limit of liability stated in paragraph 1 above shall not be cumulative, and each payment made by the companies after the effective date of this endorsement for any loss or expense covered by the policy shall reduce by the amount of such payment each of those limits of liability, regardless of which limit of liability applies with respect to the bodily injury, property damage, environmental damage or evacuation of the public out of which such loss or expense arises.
Previous Increase of Limit of Liability Endorsement(s)
Endorsement No.(s): 11, 26, 65 and 70 Effective Date of this Endorsement:
January 1,2003 Toform a part of Policy No. NF -0296 (12:01 A.M. Standard Time)
Issued to:
FPL Energy Seabrook, LLC; Massachusetts Municipal Wholesale Electric Company; Taunton Municipal Lighting Plant; and Hudson Light and Power Department Date of Issue:
December 20,2002 For the subscribing companies
(.7/
C Presient Endorsement No.:
95
,,.-jr Countersigned by
NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION ADVANCE PREMIUM AND STANIDARD PREJMUM ENDORSEMN CALENDAR YEAR 2003
- 1. ADVANCE PREMIUM: It is agreed that the Advance Premium due the companies for the period designated above is: $959,488.00
- 2. STANDARD PREMIUM AND RESERVE PREMIUM: In the absence of a change in the Advance Premium indicated above, it is agreed that, subject to the provisions of the Industry Credit Rating Plan, the Standard Premium is said Advance Premuim and the Reserve Premium is: $706,494.00 Effective Date of this Endorsement:
January 1, 2003 (12:01 A.M. Standard Time)
To form a part of Policy No. NF -0296 Issued To: FPL Energy Seabrook, LLC; Massachusetts Municipal Wholesale Electric Company; Taunton Municipal Light Plant; and Hudson Light and Power Department Date of Issue:
December 20, 2002 For the subscribing cop"I nies ByJ'y Endorsement No:
96 Countersigned by NE-36 L,/
Prlesidenit
ENCLOSURE 2 TO NYN-03021
NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION AMENDATORY ENDORSEMENT INCREASE OF POLICY AGGREGATE LIMIT (Facility Worker Form)
- 1. The Policy Aggregate Limit stated in paragraph A.1. of Section VIIL AMOUNT OF INSURANCE AVAILABLE, is amended to read $300 million.
The increase in the Policy Aggregate Limit provided by this endorsement applies only with respect to obligations assumed and expenses incurred because of bodily injury under all workers' claims that qualify for coverage under this policy caused from the effective date of this endorsement to the date of termination or expiration of this policy.
- 2. The original Policy Aggregate Limit stated in paragraph A.I. of Section VIIL AMOUNT OF INSURANCE AVAILABLE, and the amended Policy Aggregate Limit stated in paragraph I above shall not be cumulative, and each payment made by the companies after the effective date of this endorsement for any loss or expense covered by the policy shall reduce by the amount of such payment each of those Policy Aggregate Limits, regardless of which Policy Aggregate Limit applies with respect to the bodily injury out of which such loss or expense arises.
3 In paragraph C.2. of Section VIII, AMOUNT OF INSURANCE AVAILABLE, the term
"$400 million" is amended to read "$600 million".
Effective Date of this Endorsement:
January 1, 2003 To form a part of Nuclear Energy Liability Policy (12:01 A-M. Standard Time)
(Facility Worker Form) which is a Master Worker Policy in the custody of Nuclear Energy Liability Insurance Association Date of Issue:
December 20,2002 For the subscribing companies President Endorsement No.
7 Countersigned by MWP-2-2 (111103)
COPY
NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION ADVANCE PREMIUM AND STANDARD PRFU ENDORSEMN CALENDAR YEAR 2003 1 ADVANCE PREMIUM: It is agreed that the Advance Premium due the companies for the period designated above is: $39,500.00
- 2. STANDARD PREMIUM AND RESERVE PREMIUM: In the absence of a change in the Advance Premium indicated above, it is agreed that, subject to the provisions of the Industry Credit Rating Plan, the Standard Premium is said Advance Premuim and the Reserve Premium is: $29,625.00 Effective Date of this Endorsement:
January 1, 2003 (12:01 A.M. Standard Time)
To form a part of Certificate No. NW -0647 Issued To: FPL Energy Seabrook, LLC; Massachusetts Municipal Wholesale Electric Company; Taunton Municipal Lighting Plant; and Hudson Light and Power Department Date of Issue:
November 21, 2002 For the subscribing co ppnies President Endorsement No:
11 Countersigned by,
ENCLOSURE 3 TO NYN-03021
NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION ENDORSEMENT TO CERTIFICATE NO. N -0109 Forming Part of Master Policy No. 1 Nuclear Energy Liability Insurance (Secondary Financial Protection)
It is agreed that effective January 1, 2003, Item 4. (a) of the certificate is amended to read as follows:
Item 4. (a)
Identification of primary financial protection applicable to the nuclear reactor and limit(s) of liability thereof:
(1)
Facility Form Policy:
Nuclear Energy Liability Insurance Association's Policy NF-0296
$300,000,000 (2)
Master Worker Policy (Facility Worker Foirm):
Nuclear Energy Liability Insurance Association's Master Worker Policy NMWP-2
$300,000,000 Effective Date of this Endorsement:
January 1, 2003 (12:01 A.M. Standard lime)
To form a part of Certificate No. N -0109 FPL Energy Seabrook, LLC; Massachusetts Municipal Wholesale Electric Company; Taunton Municipal Lighting Plant; and Hudson Light and Power Department Date of Issue:
December 20,2002 For the subscribing companies President Endorsement No.
NE-S-23 (111/03) 32 Countersigned by Issued to:
NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION
,ANNUAL PREMIUM ENM*RSE CALENDAR YEAR 2003
- 1. ANNUAL PREMIUM:
It is agreed that the Annual Premium due the companies for the period designated above is: $9,000.00 Effective Date of this Endorsement:
January 1, 2003 (12:01 A.M. Standard Time)
To form a part of Certificate No. N -0109 Issued To: FPL Energy Seabrook, LLC; Massachusetts Municipal Wholesale Electric Company; Taunton Municipal Lighting Plant; and Hudson Light and Power Department Date of Issue:
November 21, 2002 Endorsement No:
33 For the bscribing coppMnies ByJ President Countersigned by
ENCLOSURE 4 TO NYN-03021
NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION ENDORSEMENT TO MASTER POLICY NO. I NUCLEAR ENERGY LIABILITY INSURANCE (Secondary Financial Protection)
It is agreed that effective January 1, 2003, the first paragraph of Condition 6., PRIMARY FINANCIAL PROTECTION, is amended to read as follows:
Regardless of the number of policies or contracts of primary financial protection applicable to a nuclear incident, the limit of liability of:
(a) all Facility Form policies identified in Item 4 (a) (1) of a certificate shall be deemed to be exhausted when the sums paid under said policies are equal to the lesser of the sum of the limit of liability available under all such policies, or three hundred million dollars; (b) the Master Worker Policy (Facility Worker Form) identified in Item 4 (a) (2) of a certificate shall be deemed to be exhausted when the sums paid under said policy are equal to the lesser of (1) the limit of liability available under such Master Worker Policy, or (2) three hundred million dollars.
Effective Date of this Endorsement January 1, 2003 (12:01 A-M. Standard Time)
To form a part of Master Policy No. 1 Master Policy which is in the custody of the Nuclear Regulatory Commission Date of Issue:
December 20, 2002 For the subscribing companies
~.1 f~ 9~
(~C4-)
J
(.2/
I President Endorsement No.
NE-S-25 (1/1/03) 40 Countersigned by COPY Issued to:
wj