Letter Sequence Approval |
---|
|
|
MONTHYEARML0225502792002-09-0909 September 2002 Memo, Draft Questions for the Unit 1 Steam Generator Replacement Topical Reports & Associated Technical Specification Amendment Project stage: Draft Other ML0234005652002-11-29029 November 2002 Summary of Meeting with TVA to Discuss Sequoyah Unit 1 Steam Generator Replacement Project stage: Meeting ML0233807032002-12-0404 December 2002 RAI, Unit 1 Steam Generator Replacement Topical Reports and Associated TS Amendment Project stage: RAI ML0301602402003-01-15015 January 2003 Steam Generator Replacement Project - Topical Report No. 24370-TR-C-002, Rigging and Heavy Load Handling Topical Report, Response to NRC Request for Additional Information Project stage: Response to RAI ML0307103472003-02-28028 February 2003 License Amendment (SQN-TS-03-04) to Utilize Methodology Described in Topical Report No. 24370-TR-C-001, Alternate Rebar Splice - Bar-Lock Mechanical Splices Project stage: Other ML0307800152003-03-11011 March 2003 Notice of Consideration of Issuance of Amendment, Regarding 03/18/02 Request for Revision to the Plant Updated Final Safety Analysis Report Project stage: Other ML0307306162003-03-11011 March 2003 FRN - Individual 30-day Proposed Project stage: Other ML0307202202003-03-13013 March 2003 Safety Evaluation of Topical Report No. 24370-TR-C-001, Alternate Rebar Splice-Bar-Lock Mechanical Splices. Project stage: Approval 2003-01-15
[Table View] |
|
---|
Category:Letter
MONTHYEARML24032A0202024-01-31031 January 2024 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 ML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24018A0142024-01-17017 January 2024 Engine Systems, Inc., Report No. 10CFR21-0137, Rev. 1, 56913-EN 56913 ML24011A3182024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), October 2023 ML24011A3172024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), September 2023 ML24011A3202024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), December 2023 ML24011A3162024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), August 2023 ML24011A3192024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), November 2023 IR 05000327/20234422024-01-11011 January 2024 95001 Supplemental Inspection Report 05000327/2023442 and 05000328/2023442 and Follow-Up Assessment Letter ML24010A2132024-01-10010 January 2024 CFR 21.21 Final Report Regarding Siemens Medium Voltage Circuit Breakers ML24018A0952024-01-0404 January 2024 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0137, Rev. 0 ML24004A0332024-01-0303 January 2024 Interim Report of a Deviation or Failure to Comply Crompton Instruments Type 077 Ammeter ML24004A0402024-01-0303 January 2024 Response to NRCs November 8, 2023, Request for Additional Information - Related to Independent Spent Fuel Storage Installation CNL-23-068, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) ML23346A1222023-12-12012 December 2023 Annual Non-Radiological Environmental Operating Report - 2023 IR 05000327/20234202023-11-28028 November 2023 Security Baseline Inspection Report 05000327/2023420 and 05000328/2023420 CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23324A4362023-11-0909 November 2023 Exam Corporate Notification Letter Aka 210-day Letter ML23307A0822023-11-0808 November 2023 Request for Additional Information August 4, 2022, Exemption Request for Deviating from the Conditions of Certificate of Compliance No. 1032, Amendment No. 3, Related to Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation IR 05000327/20230032023-11-0303 November 2023 Integrated Inspection Report 05000327/2023003 and 05000328/2023003 ML23306A1592023-11-0202 November 2023 Enforcement Action EA-22-129 Inspection Readiness Notification ML23292A0792023-10-19019 October 2023 Tennessee Valley Authority - Emergency Plan Implementing Procedure Revision, Includes EPIP-5, Revision 58, General Emergency IR 05000327/20230112023-10-16016 October 2023 Triennial Fire Protection Inspection Report 05000327/2023011 and 05000328/2023011 ML23285A0882023-10-12012 October 2023 Submittal of Sequoyah Nuclear Plant, Units 1 and 2, Submittal of Updated Final Safety Analysis Report Amendment 31 ML23284A4252023-10-11011 October 2023 10 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report; Commitment Summary Report; and Update to the Fire Protection Report ML23283A2792023-10-10010 October 2023 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Requirements Manual ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23277A0462023-10-0404 October 2023 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification Bases ML23275A0272023-09-29029 September 2023 Submittal of Discharge Monitoring Report (DMR) Quality Assurance Study 43 Final Report 2023 ML23271A1662023-09-28028 September 2023 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision IR 05000327/20234032023-09-14014 September 2023 Cyber Security Inspection Report 05000327/2023403 and 05000328/2023403 (Cover Letter) ML23257A0062023-09-14014 September 2023 Enforcement Action EA-22-129 Inspection Postponement Request ML23254A2192023-09-11011 September 2023 Emergency Plan Implementing Procedure Revisions ML23254A0652023-09-0707 September 2023 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000327/20230052023-08-29029 August 2023 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2023005 and 05000328/2023005 ML23233A0122023-08-17017 August 2023 Unit 1 Cycle 25 Refueling Outage - 90-Day Inservice Inspection Summary Report - Supplement ML23233A0142023-08-15015 August 2023 Discharge Monitoring Report (Dmr), July 2023 ML23215A1212023-08-0303 August 2023 301 Exam Administrative Items (2B) Normal Release ML23215A1572023-08-0303 August 2023 Enforcement Action EA-22-129 Inspection Readiness Notification CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-01-04
[Table view] Category:Safety Evaluation
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23048A3042023-03-0808 March 2023 Tennessee Valley Authority - Request for Relief from Requirements of ASME Boiler and Pressure Vessel Code Regarding Weld Examination Coverage (EPID L-2022-LLR-0045,-0046,-0047) ML22334A0732023-02-0606 February 2023 Issuance of Amendment Nos. 363 and 357 Regarding Modification of the Approved Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22348A0052023-01-25025 January 2023 Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22349A6472023-01-20020 January 2023 Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules ML22271A9142022-12-0707 December 2022 Issuance of Amendment Nos. 324, 347, and 307; 360 and 354; 157 and 65 Regarding a Revision to the Emergency Action Level Scheme ML22304A1862022-12-0101 December 2022 Revised Authorization of Alternative Request RV-02 for Pressure Isolation Valve Seat Leakage ML22284A0072022-11-0707 November 2022 Authorization of Alternative Request RP-12 for Testing of Centrifugal Charging Pump 1B-B ML22276A1612022-10-24024 October 2022 Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22272A5682022-10-12012 October 2022 Authorization of Alternatives to Certain Inservice Testing Requirements in the American Society of Mechanical Engineers Operating and Maintenance Code ML22259A2042022-09-29029 September 2022 Correction to Amendment Nos. 358 and 352 Regarding Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML22263A3752022-09-29029 September 2022 Authorization of Alternative Request RV-02 for Pressure Isolation Valve Seat Leakage ML22210A1182022-08-24024 August 2022 Issuance of Amendment Nos. 358 and 352 Regarding Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML22165A1052022-07-12012 July 2022 Issuance of Amendment Nos. 357 and 351 Regarding Revision to Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation ML22084A0012022-04-0505 April 2022 Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Units 1 and 2, Review of Quality Assurance Plan Changes ML21298A0312021-10-27027 October 2021 Issuance of Exigent Amendment No. 350 Regarding One-Time Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System, ML21245A2672021-10-27027 October 2021 NON-PROPRIETARY - Sequoyah Nuclear Plant, Units 1 and 2 - Issuance of Amendment Nos. 356 and 349 Regarding the Transition to Westinghouse Robust Fuel Assembly-2 (RFA-2) Fuel ML21266A3832021-10-0101 October 2021 Authorization of Alternative Request RP-10 for the 1B-B Motor Driven Auxiliary Feedwater Pump ML21131A1632021-05-28028 May 2021 Authorization and Safety Evaluation for Alternative Request No. 21-ISI-1 ML21084A1902021-05-0404 May 2021 Issuance of Amendment Nos. 355 and 348 Regarding Revision to Technical Specification Table 3.3.3-1, Post Accident Monitoring Instrumentation ML21021A3492021-03-0303 March 2021 Issuance of Amendment Nos. 354 and 347 Regarding Revision to Technical Specification 4.2.2, Control Rod Assemblies ML20337A0372021-02-0101 February 2021 Issuance of Amendment No. 353 Regarding Steam Generator Tube Inspection Frequency ML20350B4932021-01-25025 January 2021 Issuance of Amendment Nos. 352, 346, 141, and 47 Regarding the Adoption of Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition ML20268A0822021-01-12012 January 2021 Issuance of Amendment Nos. 314, 337, and 297; 351 and 345; 140 and 46 Regarding Changes to the Technical Specifications ML20282A3452020-11-19019 November 2020 Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements ML20262H0262020-11-12012 November 2020 Issuance of Amendment Nos. 349 and 343 Regarding Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure ML20108F0492020-04-23023 April 2020 Issuance of Amendment No. 342 Exigent Amendment to Operate One Cycle with One Control Rod Removed ML19319C8312019-11-21021 November 2019 Issuance of Exigent Amendment No. 348 to Operate One Cycle with One Control Rod Removed ML19281B5542019-11-18018 November 2019 Issuance of Amendment Nos. 347 and 341 Request to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19234A0132019-09-23023 September 2019 Alternative Request 18-ISI-1 Regarding Examination of Dissimilar Metal Welds in Reactor Vessel Head ML19179A1352019-09-18018 September 2019 Issuance of Amendment Nos. 346 and 340, Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML18277A1102019-08-27027 August 2019 Units, 1 & 2 Issuance of Amendment Nos. 309, 332, 292, 345, 339, 128, and 31 Regarding Unbalanced Voltage Protection ML19227A1102019-08-26026 August 2019 Alternative Request for the Turbine Driven Auxiliary Feedwater Pumps 10-Year Interval Inservice Testing Program ML19196A2212019-07-18018 July 2019 Issuance of Exigent Amendment Technical Specification Change - Reactor Vessel Level Instrumentation Inoperable ML19058A0292019-05-0707 May 2019 Issuance of Amendments Request to Modify Essential Raw Cooling Water Control Center Breakers and to Revise the Updated Final Safety Analysis Report (SQN-TS-17-04) ML19010A2742019-03-18018 March 2019 Final Safety Evaluation by the Office of Nuclear Reactor Regulation Topical Report- TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation, Calculation, CDQ0000002016000041 Tennessee Valley Authority ML18197A3072018-08-30030 August 2018 Issuance of Amendments Regarding Request to Change Technical Specification 3.3.1 and Surveillance Requirement 3.2.4 ML18159A4612018-08-0606 August 2018 Issuance of Amendments Regarding Request to Change Emergency Plan ML18138A4522018-05-29029 May 2018 Bf, Units 1, 2, and 3; Sequoyah, Units 1 and 2; Watts Bar, Units 1 and 2 - Correction to an Omitted Reference for License Amendment Regarding Request to Upgrade (CAC Nos. MF9054, MF9055, MF9056, MF9057, MF9058, MF9059, and MF9060, EPID L-20 ML17289A0322017-12-22022 December 2017 Issuance of Amendments Regarding Request to Upgrade Emergency Action Level Scheme (CAC Nos. MF9054-60; EPID L2017-LLA-0160) ML17034A3602017-03-27027 March 2017 Issuance of Amendment Nos. 298, 322, 282, and 338 and 331 - Revise Technical Specification 5.3, Unit Staff Qualifications to Replace References to Rg 1.8, Rev. 2 with TVA Nuclear Quality ... ML16340A0092017-03-0909 March 2017 Safety Evaluation Regarding Implementation of Mitigation Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17059B7912017-03-0202 March 2017 Sequoyah Nuclear Plant, Units 1 and 2 - Relief from the Requirements of the American Society of Mechanical Engineer OM Code (CAC Nos. MF9305 and MF9306) ML16228A0962016-10-0303 October 2016 Issuance of Amendments to Change the Completion Date of Cyber Security Plan Implementation Milestone 8 ML16225A2762016-09-29029 September 2016 Issuance of Amendments to Revise Technical Specification for Essential Raw Cooling Water System Allowed Completion Time ML16225A6332016-09-0202 September 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Relief Request for Use of Alternate Calibration Block Reflector Requirements 16-PDI-5 (TAC Nos. MF7754-MF7760) ML16123A1312016-05-12012 May 2016 Relief Requests RP-01, RP-02, RP-06, RP-08, and RV-01 Related to the Inservice Testing Program, Fourth 10-Year Interval (CAC Nos. MF7099 and MF7100) ML15329A1862015-12-0404 December 2015 Request for Relief PR-07 for Alternative Inservice Pump Testing at Reference Values ML15320A2182015-11-30030 November 2015 Issuance of Amendments to Revise Technical Specification for Containment Leakage Rate Program 2024-01-29
[Table view] |
Text
March 13, 2003 Mr. J. A. Scalice Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801
SUBJECT:
SEQUOYAH NUCLEAR PLANT, UNIT 1, SAFETY EVALUATION OF TOPICAL REPORT NO. 24370-TR-C-001, ALTERNATE REBAR SPLICE - BAR-LOCK MECHANICAL SPLICES (TAC NO. MB5371)
Dear Mr. Scalice:
On March 18, 2002, the Tennessee Valley Authority (TVA, the licensee) submitted Westinghouse Topical Report No. 24370-TR-C-001, Alternate Rebar Splice - Bar-Lock Mechanical Splices to the staff, supplemented by a letter dated December 10, 2002.
The staff has reviewed Topical Report No. 24370-TR-C-001, Alternate Rebar Splice -
Bar-Lock Mechanical Splices and found the Topical acceptable. The enclosed Nuclear Regulatory Commission (NRC) safety evaluation contains the staffs determination. However, this acceptance applies only to the Bar-Lock coupler assembly using American Society for Testing Maintenance A615 Grade 60 material in the #6 and #8 sizes for use on non-containment (i.e., shield building) applications at TVAs Sequoyah Units 1 and 2.
In accordance with the guidance provided on the NRC web site, we request that TVA publish an accepted version of this topical report within 3 months of receipt of this letter. The accepted version shall incorporate this letter and the enclosed safety evaluation between the title page and the abstract. It must be well indexed such that information is readily located. Also, it must contain in appendices historical review information, such as questions and accepted responses, and original report pages that were replaced. The accepted version shall include an "-A" (designated accepted) following the report identification symbol.
J. A. Scalice If the NRCs criteria or regulations change so that the conclusions in this letter are invalidated, thus making the topical report unacceptable, TVA will be expected to revise and resubmit its respective documentation, or submit justification for the continued applicability of the topical report without revision of the respective documentation.
If you have any questions concerning this matter, please contact Eva Brown at (301) 415-2315.
Sincerely,
/RA/
Raj K. Anand, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-327
Enclosure:
Safety Evaluation cc w/encl: See next page
J. A. Scalice March 13, 2003 If the NRCs criteria or regulations change so that the conclusions in this letter are invalidated, thus making the topical report unacceptable, TVA will be expected to revise and resubmit its respective documentation, or submit justification for the continued applicability of the topical report without revision of the respective documentation.
If you have any questions concerning this matter, please contact Eva Brown at (301) 415-2315.
Sincerely,
/RA/
Raj K. Anand, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-327
Enclosure:
Safety Evaluation cc w/encl: See next page DISTRIBUTION:
PUBLIC PDII-2 Reading File RAnand EBrown AHowe OGC KManoly JMa BClayton (Hard Copy)
ACRS SCahill, RII RTellson, RII ADAMS Accession No.ML030720220 OFFICE PDII-2\PM PDII-2\PM PDII-2\LA PDII-2\SC NAME EBrown RAnand BClayton AHowe DATE 3/11/03 3/11/03 3/11/03 3/12/03 Official Record Copy
Mr. J. A. Scalice SEQUOYAH NUCLEAR PLANT Tennessee Valley Authority cc:
Mr. Karl W. Singer, Senior Vice President Mr. Pedro Salas, Manager Nuclear Operations Licensing and Industry Affairs Tennessee Valley Authority Sequoyah Nuclear Plant 6A Lookout Place Tennessee Valley Authority 1101 Market Street P.O. Box 2000 Chattanooga, TN 37402-2801 Soddy Daisy, TN 37379 Mr. James E. Maddox, Acting Vice President Mr. D. L. Koehl, Plant Manager Engineering & Technical Services Sequoyah Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority 6A Lookout Place P.O. Box 2000 1101 Market Street Soddy Daisy, TN 37379 Chattanooga, TN 37402-2801 Senior Resident Inspector Mr. Richard T. Purcell Sequoyah Nuclear Plant Site Vice President U.S. Nuclear Regulatory Commission Sequoyah Nuclear Plant 2600 Igou Ferry Road Tennessee Valley Authority Soddy Daisy, TN 37379 P.O. Box 2000 Soddy Daisy, TN 37379 Mr. Lawrence E. Nanney, Director Division of Radiological Health General Counsel Dept. of Environment & Conservation Tennessee Valley Authority Third Floor, L and C Annex ET 11A 401 Church Street 400 West Summit Hill Drive Nashville, TN 37243-1532 Knoxville, TN 37902 County Executive Mr. Robert J. Adney, General Manager Hamilton County Courthouse Nuclear Assurance Chattanooga, TN 37402-2801 Tennessee Valley Authority 6A Lookout Place Ms. Ann P. Harris 1101 Market Street 341 Swing Loop Road Chattanooga, TN 37402-2801 Rockwood, Tennessee 37854 Mr. Mark J. Burzynski, Manager Nuclear Licensing Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR SAFETY EVALUATION OF TOPICAL REPORT NO. 24370-TR-C-001, ALTERNATE REBAR SPLICE - BAR-LOCK MECHANICAL SPLICES TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT, UNIT 1 DOCKET NO. 50-327
1.0 INTRODUCTION
In a letter dated March 18, 2002, Tennessee Valley Authoritys (TVA, the licensee) Sequoyah Nuclear Plant (SQN) submitted a topical report for an alternate methodology for splicing reinforcing bars in concrete for nuclear safety-related applications at SQN. The topical report proposes that a Bar-Lock coupler system is now available for splicing reinforcing bars.
Presently, the SQN licencing basis does not address the use of this type of reinforcing bar splice. This topical report describes a qualification testing program and test results for the Bar-Lock coupler system. On July 9, 2002, and October 24, 2002, meetings were held between the U.S. Nuclear Regulatory Commission staff (the staff) and TVA. Subsequently, the staff issued a request for additional information dated December 4, 2002. The licensee provided response to the additional information in a letter dated December 10, 2002.
2.0 TEST PROGRAM Bechtel Corporation and Idaho National Engineering and Environmental Laboratory (INEEL) developed and performed a testing program for the Bar-Lock coupler system to assess its performance characteristics. TVA was heavily involved in the Bechtel/INEEL test program, and reviewed and approved the specifications, procedures and test plans associated with the procurement, testing, and installation of the Bar-Lock couplers. TVA civil engineers attended the vendor training session. TVA Engineering and Quality Assurance (QA) personnel witnessed the preparation of several test assemblies, and the testing of several specimens.
TVA reviewed and approved the testing program and performance analysis, prepared by INEEL.
The reinforcing bar used in the Bar-Lock coupler assembly testing program was American Society for Testing and Maintenance (ASTM) A615 Grade 60 material in #6 and #8 sizes. The mechanical properties for the reinforcing bars were tested in according to ASTM Designation A 370-96, Standard Test Methods and Definitions for Mechanical Testing of Steel Products; and ASTM Designation E 8-99, Standard Test Methods for Tension Testing of Metallic Materials.
Enclosure
The component parts of each Bar-Lock coupler consist of a steel tube, lock-shear bolts, and serrated rails. The steel tube is seamless hot-rolled in conforming to ASTM A-519, with minimum tensile strength in excess of 100 kilopound per square inch (ksi). The lock-shear bolt was made from American Iron and Steel Institute (AISI) 41L40 material, and were through-hardened over the entire length and further induction-hardened at the conical bolt tip. The serrated rails were made of ASTM CD1018 material, and were machined and then carburized to a depth of 0.032 inch The test specimen assemblies were made by steel construction workers using Bar-Locks assembly instructions in a normal field environment. Assembly of the test specimens was monitored by Bechtel Quality Control (QC) personnel. The Bar-Locks assemblies were tested in the same machine that had tested the mechanical properties of the reinforcing bars and in conformance with the same ASTM A 370-96 and E 8-99 standards.
Two reinforcing bar sizes (#6 and #8) of Bar-Lock coupler assemblies were statically tested.
The test was conducted using forty specimens of each of the two sizes of coupler assemblies.
The static test was performed according to the requirements of American Society of Mechanical Engineers (ASME)Section III, Division 2, Code for Concrete Reactor Vessels and Containment, (the Code) Section CC-4333.2.3(a), Static Tensile Tests for Mechanical Splices.
Forty specimens of each of the two sizes of the Bar-Lock coupler assemblies were tested for cyclic loadings. The cyclic test was performed according to the requirements of ASME Section III, Division 2, Code for Concrete Reactor Vessels and Containment, Section CC-4333.2.3(b),
Cyclic Tensile Tests for Mechanical Splices. The Code requires that three specimens of the bar-to-bar splice for each reinforcing bar size shall withstand 100 cycles of stress variation from 5 percent to 90 percent of the specified minimum yield strength of the reinforcing bar. In an effort to improve the cyclic durability assessment, after 100 cycles of loading required by the Code, several specimens were randomly selected to receive an additional 1000 cycles, and several other specimens were statically loaded to failure.
3.0 TECHNICAL EVALUATION
The Code requires six splice specimens for each bar size to be tensile tested statically to failure and three to be tested cyclically. The Code requires that the average tensile strength of the splices shall not be less than 90 percent of the actual tensile strength of the reinforcing bar being tested, nor less than 100 percent of the specified minimum tensile strength. Table CC-4334-1, Tensile Requirements for Mechanical Reinforcing bar splices and Welded Joints, of the Code lists a minimum yield strength of 60 ksi and minimum tensile strength of 90 ksi for ASTM 615 Grade 60 reinforcing bars.
The INEEL report states that the average tensile strength of the 40 #6 Bar-Locks assemblies is 106.2 ksi, which is 98.8 percent of the average #6 bar actual tensile strength. The average tensile strength of the 40 #8 Bar-Locks assemblies is 109.0 ksi, which is 99 percent of the average #8 bar actual tensile strength. None of the 80 specimens tested cyclically failed in any manner (e.g., bar break, or bar slip within the coupler). For those specimens that received additional 1000 cycles of loading, no obvious physical degradation was observed. For those specimens that passed 100 cycles of loading and then statically loaded to tensile failure, the measured tensile strengths were essentially the same as those tested statically to failure without the 100 cycles of loading. The report also states that no practical differences were
observed in the general character of the stress-strain curve of any of the 80 specimens tested statically, and no measurable slip was detected during the cyclic tests.
The staff finds the QA/QC program for the test specimens adequate. The phenomena of no measurable slip and the similarity in the stress-strain curves of the specimens tested demonstrate that the Bar-Locks assembly has delivered predictable results and qualifies as a viable reinforcing bar splicing system. The licensee has tested more specimens than that required by the Code, which increases the confidence level for the acceptance of the Bar-Locks assembly. The static and cyclic test methods and results have met the requirements of the Code. The additional tests of the 1000 cycles of loading and of the tensile test to failure after the 100 cycles of loading exceed the Code requirements.
4.0 CONCLUSION
Based on the information provided by the licensee, the staff determined that the licensee has developed and performed a reasonable test program for the Bar-Lock coupler assemblies, and that the test data demonstrate the adequacy of the proposed alternate methodology for connecting (splicing) reinforcing steel bars for nuclear-safety-related applications at the Sequoyah plant.
Principal Contributor: John Ma, NRR Date: March 13, 2003