Indiana Michigan Power Co. Answer to Nuclear Regulatory Commission Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors
ML030710433
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/03/2003
From: Joseph E Pollock
Indiana Michigan Power Co
To:
NRC/SECY/RAS
References
AEP.NRC:3054-03, EA-03-009
Download: ML030710433 (5)


Text

Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 49107 1373 INDIANA MICHIGAN POWER March 3, 2003 AEP.NRC:3054-03 10 CFR 2.202 DocketNos: 50-315 50-316 Secretary, Office of the Secretary of the Commission U.S. Nuclear Regulatory Commission ATTN: Rulemakings and Adjudications Staff Washington, DC 20555 Donald C. Cook Nuclear Plant Units 1 and 2 ANSWER TO NUCLEAR REGULATORY COMMISSION ORDER ESTABLISHING INTERIM INSPECTION REQUIREMENTS FOR REACTOR PRESSURE VESSEL HEADS AT PRESSURIZED WATER REACTORS

References:

1. U. S. Nuclear Regulatory Commission Order EA-03-009, "Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors," dated February 11, 2003
2. Letter from S. A. Greenlee, Indiana Michigan Power Company, to U. S. Nuclear Regulatory Commission Document Control Desk, "Proposed Alternatives to the Requirements of Section XI of the American Society of Mechanical Engineers Code Request for Additional Information (TAC Nos. MB3551 and MB3552)," AEP:NRC:2055, dated April 25, 2002 This letter transmits Indiana Michigan Power Company's (I&M's) answer to a Nuclear Regulatory Commission (NRC) order establishing interim inspection requirements for reactor pressure vessel heads at pressurized water reactors.

The NRC order (Reference 1) imposes enhanced requirements for inspection of pressurized water reactor pressure vessel heads and related penetration nozzles.

Section V of the order requires that, within twenty days of its date of issuance, licensees submit an answer to the order, either consenting to the order or setting

U. S. Nuclear Regulatory Commission AEP.NRC:3054-03 Page 2 forth reasons as to why the order should not have been issued.Section IV of the order prescribes the enhanced inspection requirements.Section IV.F of the order requires that licensees notify the NRC, in the response required by Section V, if (1) they are unable to comply with any of the requirements of Section IV, or (2) compliance with any of the requirements of Section IV is unnecessary.Section IV.F further states that licensees proposing to deviate from the enhanced inspection requirements may request that the Director, Office of Nuclear Reactor Regulation relax conditions of the order.

Consent to Order and Anticipated Relaxation Requests Pursuant to Section V of Reference 1, I&M, the licensee for Donald C. Cook Nuclear Plant (CNP) Unit 1 and Unit 2, hereby consents to the order. However, I&M is unable to comply and/or considers compliance with the requirements identified below to be unnecessary for the reasons stated.

" Sections IV.C(1)(b)(i), IV.C(2)(b)(i), and IV.C(3)(b)(i) of the order require that ultrasonic testing of each reactor pressure vessel head penetration nozzle extend to the bottom of the nozzle. The probes used for such examinations have separate transducers for sending and receiving the ultrasonic signal. In the probes used for detection of the most significant type of cracks, circumferential cracks, the two transducers are arranged vertically, approximately 24 millimeters apart. Therefore, the lower transducer will not be in contact with the nozzle inside wall unless the upper transducer is inserted greater than approximately 24 millimeters into the nozzle. As a result, the probe cannot scan a small portion of the lower end of the nozzle.

I&M does not consider it necessary to redesign the circumferential probe, or use a second probe, to scan that small portion of the lower end of the nozzle, since it is not a pressure boundary. Additionally, ultrasonic testing of the nozzle greater than 2 inches below the J-groove weld is not necessary, since that portion of the nozzle is also not a pressure boundary.

" Sections IV.C(1)(b)(ii), IV.C(2)(b)(ii), and IV.C(3)(b)(ii) of the order require eddy current or dye penetrant testing of the wetted surface of each reactor pressure vessel head penetration nozzle base material. However, the outside surface of each nozzle is threaded at the lower end, and some nozzles have a guide funnel screwed onto these threads. Eddy current or dye penetrant testing of the threaded surfaces or the surfaces inside the guide funnel is not possible. Additionally, eddy current or dye penetrant testing of nozzle surfaces greater than 2 inches below the J-groove weld is not necessary, since that portion of the nozzle is not a pressure boundary.

I&M intends to request relaxation of the above identified requirements, in accordance with Section IV.F of the order, by separate correspondence.

U. S. Nuclear Regulatory Commission AEP.NRC:3054-03 Page 3 Clarifications from Public Meeting Based on the clarifications provided at the February 24, 2003, public meeting regarding the order, I&M understands that:

The requirements in Sections IV.C(1)(a), IV.C(2)(a), and IV.C(3)(a) of the order, for 100 percent bare metal visual inspection, apply only to areas of the upper surface of the reactor pressure vessel head related to cracking of penetrations, including 360 degrees around the nozzle penetrations, and areas of the reactor pressure vessel head that may be subject to specific external sources of boric acid. Areas such as head flange stud holes and lifting lug holes would not be included in the inspection unless there was evidence that they had been exposed to boric acid.

Footnote 1 on Page 7 of the order does not require that flaw evaluation be performed in accordance with the letter dated November 21, 2001, from J.

Strosnider, NRC, to A. Marion, Nuclear Energy Institute. Therefore, I&M intends to use the flaw evaluation guidance used in previous penetration nozzle inspections at CNP. That flaw evaluation guidance is contained in Westinghouse document WCAP-14118, Revision 5, "Structural Integrity Evaluation of Reactor Vessel Upper Head Penetrations to Support Continued Operation- D. C. Cook Units 1 and 2," dated January 2002, which was transmitted to the NRC by Reference 2.

There are no new commitments identified in this letter. Should you have any questions, please contact Mr. Brian A. McIntyre, Manager of Regulatory Affairs, at (269) 697-5806.

Sincerely, E. Pollock Site Vice President JRW/rdw c: Document Control Desk, NRC Director, Office of Nuclear Reactor Regulation, NRC Assistant General Counsel for Materials Litigation and Enforcement, NRC K. D. Curry, Ft. Wayne AEP J. E Dyer, NRC Region III J. T. King, MPSC MDEQ - DW & RPD NRC Resident Inspector J. F. Stang, Jr., NRC Washington, DC

U. S. Nuclear Regulatory Commission AEP:NRC:3054-03 Page 4 AFFIRMATION I, Joseph E. Pollock, being duly sworn, state that I am Vice President of Indiana Michigan Power Company (I&M), that I am authorized to sign and file this request with the Nuclear Regulatory Commission on behalf of I&M, and that the statements made and the matters set forth herein pertaining to I&M are true and correct to the best of my knowledge, information, and belief.

Indiana Michigan Power Company J. E. Pollock Site Vice President SWORN TO AND SUBSCRIBED BEFORE ME 7"

N. '

THIS Ac OF nbxieA___

DAY 2003 My Commnission Expires /"Z .7/

3AW"

U. S. Nuclear Regulatory Commission AEP:NRC:3054-03 Page 5 bc: A. C. Bakken III M. J. Finissi S. A. Greenlee D. J. Garner G. F. Borlodan/C. R. Lane/R. E. Hall T. R. Satyan-Sharma D. W. Jenkins J. A. Kobyra B. A. McIntyre J. E. Newmiller J. E. Pollock D. J. Poupard M. K. Scarpello T. K. Woods